Executive Engineer,Ver - II Project Division,Vyara. Opp Judges Bunglow Near Petrol Pump surat Road Vyara Di.Tapi Pin-394650
Clearing the Vegitation growth on earthen Dam and Dam Colony of Chopadvav Irrigation Scheme.
263881
E Tender Notice No.21 of 2025-2026
Open
Civil Works - Canal
Works
Tapi
6 documents required · 6 mandatory
₹900
Yes
Executive Engineer Ver-2 Project DIvision Vyara
₹11,000
Yes
12 Jan 2026
12 Jan 2026
12 Jan 2026
27 Jan 2026
12 Jan 2026
NAME OF WORK :- Clearing the Vegitation growth on earthen Dam and Dam
Colony of Chopadvav Irrigation Scheme
GOVERNMENT OF GUJARAT
NARMADA, WATER RESOURCES, WATER SUPPLY
& KALPSAR DEPARTMENT
OFFICE OF THE SUPERINTENDING ENGINEER
UKAI CIRCLE (CIVIL), UKAI
TALUKA-SONGADH, DIST. TAPI,
Sign. of the Contractor Sign. of the Executive Engineer
This is a generic SBD to be used for Civil works. Each user/concern departmentneeds to examine
and put up their particular bidding requirement like; qualification criteria, contract Data etc.,
marked at [#] while finalizing their own bidding process.
SrN Section Description PageNo
1 Invitation for Bid(IFB)
2 Section-1 Instructions to Bidders
3 Section-2 Qualification Information
4 Section-3 Conditions of Contract
5 Section-4 Contract Data
6 Volume - II Section-5 Technical Specification
7 Volume – III Section-6 Form of Bid
8 Section-7 Bill of Quantities
9 Section-8 Securities and Other Forms
10 Volume – IV Section-9 Drawings
11 Volume – V Section-10 Documents to be furnished by Bidder
Sign. of the Contractor Sign. of the Executive Engineer
INVITATION FOR BID
Sign. of the Contractor Sign. of the Executive Engineer
NATIONAL COMPETITIVE BIDDING
1. The Executive Engineer, Ver-2 Project Division, Vyara invites bids for the construction
of works detailed in the table.
The bidders may submit bids for any or all of the following works.
Package Name of work Approximate Bid Cost of Period of # Class of
No. Value of works security document completion Registration /
(Rs.) (Rs.)1% Tender Category of
Fee contractor if
earthen dam E-2 Class
and dam colony and Above
2. Prospective / Interested bidder may download the Bid Documents from website
https://www.nprocure.com free of cost till the Time and Date as mentioned on online
NIT at website https://www.nprocure.com.
3. However, Bidder who is submitting the Bid Online will have to pay the Bid
Document Fee /Tender Fee through Demand Draft only of any Schedule Bank
payable at Ver-2 Project Division,Vyara. and in favour of ‘Executive Engineer, Ver-
2 Project Division,Vyara’. Once the Bid is received online, Bid Document / Tender
Fee will not be refundable.
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee
against Bid Security shall be submitted in electronic format through online (by
scanning)while uploading the bid, this submission shall mean that bid document /
tender fee and Bid Security has been received. Accordingly, the offer of only those
shallbe opened whose Bid Document / Tender Fee and Bid Security have been
received electronically. However, for the purpose of realization of Demand Draft,
and FDR / Bank Guarantee bidder shall send the same in original through R.P.A.D.
so as to reach to #‘Executive Engineer, Ver-2 Project Division, Vyara within 7 Days
from the last day of bid submission. Penaltative action for not submitting Demand
Draft / FDR / Bank Guarantee in original to Executive Engineer / Tender Inviting
Authority by bidder shall be initiated.
4. Bids received online, will be opened on the time, date and place as specified in the
Sign. of the Contractor Sign. of the Executive Engineer
online NIT at website https://www.nprocure.com in the presence of the bidders or
their authorized representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified, the
bids will be opened on the next working day at the same time and venue.
5. A prebid meeting will be held on //2024 at12:00hrs.atthe office of The
Superintending Engineer, Ukai Circle(Civil),Ukaito clarify the issues and to answer
questions on anymatter
thatmayberaisedatthatstageasstatedinclause9.2of‘instructionsto Bidders’ of the
bidding documents.
6. #Bid Security is equal to 1% of Estimated Amount put to bid / tender and should be
rounded off to the next thousand rupees.
7. Other Information is as under:
A. Agencies can prepare and edit their offers a number of times before the end of the
tender submission date and time. After the tender submission date and time, the
bidder cannot modify / edit / withdraw their submitted offer in any case. No written
or online request in this regard shall be granted.
B. Offers in physical form will not be accepted in any case.
C. Demand Draft purchased by the other then bidder and issued after the last
date of submission of Bids, will not be considered or accepted.
D. The cost incurred by the contractor for this offer for clarification or attending
discussion, conferences or site visits will not be reimbursed by the Employer
or Engineer-in-Charge.
E. Conditional tender shall not be accepted.
F. Any changes, addition, alternation made in the prescribed form attached with
tender are liable to be rejected.
G. Any change in format or conditional Bank Guarantee will not be accepted
and the bidder will be considered non-responsive.
H. All the bidders are instructed to fill in information strictly in accordance with
the format given in the checklist /qualification document / tender document.
I. It is mandatory for the bidders to supply each and every information as asked
strictly in electronic format at appropriate places only.
J. Blank / insufficient information shall be treated as nil information and shall
result in disqualification.
Sign. of the Contractor Sign. of the Executive Engineer
K. Even if the bidder has been qualified in a similar or larger size of project in
the past, it shall not be deemed to be aground/reason for not giving required
information for this work / bid.
L. Information supplied for earlier projects shall not be considered while
evaluation of this bid. The Government will not ask for any other
information, unless it is found absolutely necessary by the competent
M. If found necessary, the contractor will be intimated for negotiation,
#For the works costing up to Rs. 7.5 crore (WRD Works), R s . 7.0 crore (ROAD/
BRIDGE/ BUILDING WORKS), Rs. 0.5 Crore (Electrical Works) kindly refer to
GoG NWRWS & K Department’s Circular No. Paracha/1097/1397(11)/pa.fa./
MICELL(k-1) dated 18/01/2018 and Dated 30/09/2022
For the works costing under 7.5 crore for Road Works and 7.0 crore for
Building and Bridge Works following documents shall be submitted in
electronic format only through online by scanning and the (i) Bid Document
Fee / Tender Fee (ii) Bid Security should be sent in original to the Tender
opening authority through RPAD, so as to reach the Executive Engineer
within 7 days from last day of submission of Bid.
(i) Bid Document Fee/Tender Fee
(ii) Bid Security or Valid Bid Security Exemption Certificate of
Appropriate Class of Registration of Approved Contractors
(iii) Registration Certificate of Appropriate Class- “E-2” Class and above
(iv) GST Number
Sign. of the Contractor Sign. of the Executive Engineer
INSTRUCTIONS TO BIDDERS
Sign. of the Contractor Sign. of the Executive Engineer
Section1: Instructions to Bidders
Table of Clauses
Page No. Page No.
A.General D. Submission of Bids
1. Scope of Bid 9 19. Sealing & Marking of Bids
2. Source of Funds 9 20. Deadline for Submission of
3. Eligible Bidders 9 21. Late Bids
4. Qualification of the 9 22. Modification and
Bidder Withdrawal of Bids
5. One Bid per Bidder
6. Cost of Bidding 14 E.Bid Opening and Evaluation
7. Site Visit 15 23. Bid Opening
B.Bidding Documents 25. Clarification of Financial
8. Content of Bidding 16 26. Examination of Bids and
Documents Determination of
9. Clarification of Bidding 16 27. Correction of Errors
10. Amendment of Bidding 17 28. Deleted
29. Evaluation and Comparison
Of Financial Bids
C. Preparation of Bids 30. Deleted
11. Language of Bid
12. Documents Comprising 18 F. Award of Contract
13. Bid Prices 19 31. Award Criteria
14. Currencies of Bid and 19 32. Employer’s Right to Accept
Payment Any Bid and to Reject any
15. Bid Validity 19 33. Notification of Award and
Signing of Agreement
16. Bid Security 19 34. Performance Security
17. Alternative Proposals By 21 35. Advance Payment and
Bidders Security
18. Format and Signing of Bid 21 36. Dispute Review Expert
37. Corrector Fraudulent
Sign. of the Contractor Sign. of the Executive Engineer
1. Scope of Bid
1.1 The Executive Engineer, Ver-2 Project Division, Vyara invites bids for
“ Clearing the Vegitation growth on earthen dam and dam colony of
Chopadvav Irrigation Scheme” detailed in the table given in IFB. The
bidders may submit bids for any or all of the works detailed in the table given
1.2 The successful bidder will be expected to complete the works by the intended
completion date specified in the Contract data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their
derivatives (bidder/ tenderer, bid / tender, bidding/ tendering, etc.) are
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Govt. of Gujarat
/Govt. of India for centrally sponsored projects.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification
Information, a statement that the Bidder is neither associated, nor has been
associated, directly or indirectly, with the consultant or any other entity that
has prepared the design, specifications, and other documents for the Project or
being proposed as Project Manager for the Contract. A firm that has been
engaged by the Employer to provide consulting services for the preparation or
supervision of the works, and any of its affiliates, shall not be eligible to bid.
4. Qualification of the Bidder
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification
Information, a preliminary description of the proposed work method and
schedule, including drawings and charts, as necessary. The proposed
methodology should include a program of construction backed with equipment
planning and deployment duly supported with broad calculations and quality
assurance procedures proposed to be adopted justifying their capability of
execution and completion of work as per technical specifications, within
stipulated period of completion.
Sign. of the Contractor Sign. of the Executive Engineer
#4.5 QUALIFICATIONCRITERIA:
(Applicable for the works which require Pre Qualification) As Per GoG
NWRWS & K Department’s Circular No.
Paracha/1097/1397(11)/pa.fa./MICELL(k-1) Dated 18/01/2018
4.5.1 Qualification will be based on Applicant’s meeting all the following minimum
pass/ fail criteria regarding the Applicant’s general and particular experience,
personnel and equipment capabilities and financial positions, as demonstrated
by the applicant’s responses in the forms attached to the letter of application (
specified requirement for joint ventures are given under para 4.6 below )
Subcontractors experience and resources shall not be taken in to account in
determining the applicants compliance with the qualifying criteria To qualify
for more than one contract, the applicant must demonstrate having experience
and resources sufficient to meet the aggregate of the qualification criteria for
each contract given in paragraphs 4.5.4, 4.5.5 and 4.5.9 below
4.5.2 Base year and Escalation
The base year shall be taken as Current financial year
Following enhancement factors will be used for the costs of works executed
and the financial figure to a common base value for works completed in India.
Year Financial Year Multiplying
Base year of inviting 2025-26
Applicant should indicate actual figures of costs and amount for the
works executed by them without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in foreign
currency the above enhanced multiplying factors will not be applied. Instead,
the current market exchange rate (State Bank of India BC Selling rate as on
the last date of submission of the bid) will be applied for the purpose of
conversion of the amount in foreign currency into India rupees.
Sign. of the Contractor Sign. of the Executive Engineer
4.5.3. General Experience.
The Applicant shall meet with the following minimum criteria:
(a) Achieved a minimum annual financial turnover of Rs. for works in
progress and completed in all classes of civil engineering construction
works in any one year, over the last five financial years.
(b) Experience in successfully completing or substantially completing at least
one contract of Similar work means Construction of checkdam of at least
40 percent of the value of proposed contract within the last five years.
The works may have been executed by the applicant as prime
contractor or as a member of a joint venture or as a nominated sub-
contractor. As subcontractor, he should have acquired the experience of
execution of all major items of works under the proposed contract. In case
a project has been executed by a joint venture, weight towards experience
of the project would be given toN.A.
each joint venture in proportion to their
financial participation in theE.E.joint venture if workexecuted jointly
otherwise as per the scope of work define in Joint Ventureagreement.
Substantially completed works means those works which are at least
90 % completed as on the date of submission (i.e. gross value of work
done up to the last date of submission is 90 % or more of the original
contract price) and continuing satisfactorily.
For these, a certificate from the employers shall be submitted along
with the application incorporating clearly the name of the work, contract
value, billing amount, date of commencement of works, satisfactory
performance of the contractor and any other relevant information.
(the experience certificate should be signed by the officer not below the
rank of Executive Engineer)
(c) Contractor should have completed 60% of quantity of principal items of
work like concrete, excavation/earthwork,Gabion etc. within last five
finical years. Certificate of competent authority of work done with detail
shall be produced.
4.5.4. Personnel Capabilities.
Availability for his work of personnel with adequate experience as required; as
4.5.5. Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggested major
equipment to attain the completion of works in accordance with the prescribed
construction schedule are shown in the Appendix
Sign. of the Contractor Sign. of the Executive Engineer
The bidders should, however, undertake their own studies and furnish
with their bid, a detailed construction planning and methodology supported
with layout and necessary drawings and calculations to allow the employer to
review their proposals. The numbers, types and capacities of each
plant/equipment shall be shown in the proposals along with the cycle time for
each operation for the given production capacity to match the requirements.
4.5.6. Financial Position
The Applicant should give undertaking that he has access to, or has available,
liquid assets (aggregate of working capital, cash in hand and uncommitted
bank guarantees) and / or credit facilities up to 25 percent of the value of the
contract / contracts applied.
4.5.7. The audited balance sheets for the last five years should be submitted, which
must demonstrate the soundness of the applicant’s financial position, showing
long – term profitability including an estimated financial projection for the
next two years If necessary, the employer will make inquiries with the
applicant’s bankers.
4.5.8. Litigation History
The Applicant should provide accurate information on any litigation or
arbitration resulting from contracts completed or under execution by him over
the last five years. A consistent history of awards against the Applicant or any
partner of a joint venture may result in failure of the applicant.
4.5.9.Disqualification
Even though the applicants meet the above criteria, they are subject to be
disqualified if they have:
Made misleading or false representation in the forms, statements submitted,
and / or Record of poor performance such as abandoning the work, rescinding
of contract for which the reasons are attributable to the non – performance of
the contractor; consistent history of litigation awarded against the applicant or
financial failure due to bankruptcy. The rescinding of contract of a joint
venture on account of reasons other than non – performance, such as Most
Experienced partner of joint venture pulling out, court directions leading to
breaking up of a joint venture before the start of work, which are not
attributable to the poor performance of the contractor will, however, not affect
the qualification of the individual partners.
4.5.10.The bidder who have applied for corporate Debt Restructuring (CDR) / facing
recovery proceedings from financial institutions / facing winding up processing
/ those under BIFR in the last 5 financial year shall be considered for bid
qualification. However if the bank / financial institution has accepted the
proposal of debt restructuring on or before the last date of online submission,
Sign. of the Contractor Sign. of the Executive Engineer
the same shall be considered for further evaluation. An affidavit by bidder along
with certificate from bank must be produced in such cases. In case of Joint
Venture agreement, this provision shall be applicable for both lead partner and
#4.6 JOINT VENTURE: (Maximum 3 Members i.e. 1 Lead &
(Applicableonlyforestimatedprojectcostof50Croreandabove)
4.6.1. Jointventuresmustcomplywiththefollowingrequirement:
(a) Followingaretheminimumqualificationrequirements:
(i) Theleadpartnershallmeetnotlessthan50percentofallcriteriagiveninpara
4.5.3&4.5.6above.Thejointventuremustcollectivelysatisfythecriteriaofpara
4.5.3&4.5.6above.Theexperienceoftheotherjointventurepartnersshallbe
consideredifitisnotlessthan30percentofthequalifyingcriteriainpara4.5.3&
(ii) Individually each member must satisfy the requirements of para 4.5.7 & 4.5.8
(b) Bid shall be signed so as to legally bind all partners, jointly and severally,
and shall be submitted with a copy of the joint venture agreement providing
the joint and several liabilities with respect to the contract.
4.6.2. Qualification of a joint venture does not necessarily qualify any of its
partnersindividually or as a partner in any other joint venture. In case
dissolution of a joint venture, each one of the constituent firms may qualify if
they meet all the qualification requirements, subject to the written approval of
4.7. Bid Capacity.
Applicants who meet the minimum qualification criteria will be qualified only
if their available bid capacity at the expected time of bidding is more than the
total estimated cost of the works. The available bid capacity will be calculated
Assessed Available Bid Capacity=(A*N*2-B), where
A=Maximum value of work executed in any one year during the last five years
(updated to the price level of the year indicated in appendix) taking into
account the completed as well as works in Progress.
B=Value at current price level of the existing commitments and ongoing
works to be completed during the next (period of completion of work for which
bids are invited); and
Sign. of the Contractor Sign. of the Executive Engineer
N=Number of years prescribed for completion of the works for which the bids
Note :-In Case of joint venture, the available bid capacity will be applied
for each partner to the extent of his proposed participation in the
execution of the work.
4.8 Even though the bidders meet the above qualifying criteria, they are
subject to be disqualified if they have:
- Made misleading or false representation in the forms, statements and
Attachments the submitted in proof the qualification requirements; and /
- Record of poor performance such as abandoning the works, not properly
completing the contract, inordinate delay in completion, litigation history,
or financial failures etc.; and/ or
- Participated in the previous bidding for the same work and had quoted
unreasonably high bid prices and could not furnish rational justification to
5. One bid per bidder
5.1.Each bidder shall submit only one bid for one package. A bidder who submits or
participates in more than one bid (other than as a subcontractor or in cases of
alternatives that have been permitted or requested) will cause all the proposals
with the bidder’s participation to be disqualified.
6. Cost of Bidding
6.1.The bidder shall bear all costs associated with the preparation and submission of
his Bid, and the Employer will in no case be responsible and liable for those
Sign. of the Contractor Sign. of the Executive Engineer
7.1.The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and
examine the Site of work and its surrounding and obtain all information that
may be necessary for preparing the Bid and entering into a contract for
construction of the Works. The costs of visiting the site shall be at the Bidder’s
Sign. of the Contractor Sign. of the Executive Engineer
B. BIDDING DOCUMENTS
8. Content of Bidding Documents
8.1 The set of bidding documents comprises the documents listed below and
addenda issued in accordance with Clause 10:
Sectio Particular Volume
- Invitation for Bids
1 Instructions to Bidders I
2 Qualification Information, and other
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder V
8.2. Volumes I, II, III and IV are available online and documents to be furnished
by the bidder in compliance to section 2 will be prepared by him and furnished
as Volume- V in two parts (refer clause 12).
8.3. The bidder is expected to examine carefully all instructions, conditions of
contract, contract data, forms, terms, technical specifications, bill of quantities,
forms, Annexes and drawings in the Bid Document. Failure to comply with the
requirements of Bid Documents shall be at the bidder’s own risk. Pursuant to
clause 26 hereof, bids which are not substantially responsive to the
requirements of the Bid Documents shall be rejected.
9. Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents
may notify the Employer in writing or through E-mail at the Employer’s
address indicated in the invitation to bid. The Employer will respond to any
request for clarification which he received earlier than 15 days prior to the
deadline for submission of bids. Employer’s response will be published on
website including a description of the enquiry but without identifying its
Sign. of the Contractor Sign. of the Executive Engineer
9.2. Pre-bid meeting (Not applicable)
9.2.1. The bidder or his official representative is invited to attend a pre-bid meeting
which will take place at the address, venue, time and date as indicated in the
9.2.2. The purpose ofthe meetingwill be to clarify issues andto answerquestions on
any matter that may be raised at that stage.
9.2.3. The bidder shall be required to submit any questions in writing or e-mail to
reach the Employer not later than 03 days before the meeting.
9.2.4Minutes of the meeting, including the question raised (Without identifying
thesource of enquiry) and the responses given will be published without
delay on the tender website i.e. www.nprocure.com. Any modification of
the biddingdocuments listed in sub-Clause 8.1 which may become necessary
as a result of the pre-
bidmeetingshallbemadebytheEmployerexclusivelythroughtheissueofan
Addendum pursuant to Clause 10 and not through the minutes of the pre-bid
9.2.5.Non-attendance at the pre-bid meeting will not be a cause for disqualification
10. Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the
bidding documents by issuing addenda.
10.2. Any addendum thus issued shall be part of the bidding documents. The
Employer will assume no responsibility for the same.
10.3. To give prospective bidders reasonable time in which to take an addendum
into account in preparing their bids, the Employer may, at his discretion,
extend as necessary the deadline for submission of bids, in accordance with
Sub-Clause 20.2 below.
Sign. of the Contractor Sign. of the Executive Engineer
C. PREPARATIONOFBIDS
11. Language of the Bid
11.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer
Clause8.1) shall be in two separate parts:
Part I shall be named “Technical Bid” and shall comprise
(i) Bid Security in the form specified in Section8
(ii) Qualification Information and supporting documents as specified in
(iii) Certificates, undertakings, affidavits as specified in Section
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in
Part II shall be named “Financial Bid”and shall comprise
(i) Form of Bid as specified inSection6
(ii) Priced Bill of Quantities for items specified in Section
12.2. The Bidder shall submit the details/information pertaining to each part i.e.
technical as well as financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
Invitation for Bids(IFB)
1 Instruction to Bidders Volume I
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
9 Drawings Volume IV
Sign. of the Contractor Sign. of the Executive Engineer
13.1 The Contract shall be for the whole works as described in Sub-Clause 1.1,
based on the priced Bill of Quantities submitted by the Bidder.
13.2 The bidder shall fill in rates and prices and line-item total (both in figures and
words) for all items of the Works described in the Bill of Quantities along with
total bid price (Both in figures and words). Items for which no rate or price is
entered by the bidder will not be paid for by the Bill of Quantities.
13.3 All duties, taxes, and other levies except GST payable by the contractor under
the contract, or for any other cause shall be included in the rates, prices and
total Bid Price submitted by the Bidder. (GST will be paid extra)
13.5 The rates and prices quoted by the bidder are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 47 of
the Condition of Contract (Irrespective of the time limit and Bid Amount)
14. Currencies of Bid and Payment
14.1 The unit rates and the prices quoted by the bidder shall be entirely in Indian
Rupees. All payments shall be made in Indian Rupees.
15. Bid Validity
15.1 Bids shall remain valid for a period of not less than 120 days after the deadline
date forbid submission specified in Clause
15.2 In exceptional circumstances, prior to expiry of the original time limit, the
Employer may request that the bidders may extend the period of validity for a
specified period. A bidder may refuse the request without forfeiting his bid
security. A bidder agreeing to the request will not be required or permitted to
modify his bid, but will be required to extend the validity of his security for a
period of the extension, and in compliance with Clause 16 in all respects.
#16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as
shown in column 4 of the table of IFB for this particular work. This Bid
security shall be in favor of Executive Engineer, Ver-2 Project Division,Vyara
as named in Appendix and may be in one of the following forms;
a. Bank Guarantee from any scheduled Indian bank, in the format given in
Volume III. (Bank Guarantee is applicable only for Bid Estimated
Sign. of the Contractor Sign. of the Executive Engineer
Amount of 01 Crore and above) and Bank Guarantee of Schedule and
Private Banks shall be considered as per GoG Finance Department’s
Circular No. FD/MSM/e- file/4/2023/0057/D.M.O. Date 21/04/2023 or
as per their latest amendment.
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign
Bank approved by the Reserve Bank of India.
# A Valid Bid Security Exemption Certificate issued by (1) Road &
Building Department or (2) Narmada Water Resources, Water Supply
and Kalpsar Department of Govt of Gujarat. Exemption Certificate is
applicable only when Registration Certificate of Appropriate Class
and Category of Approved Contractors is required as eligible
criteria of bidder.
16.2. Bank guarantees (and other instruments having fixed validity) issued as
surety for the bid shall be valid for 1 (one) Month beyond the validity of the
bid i.e. total validity of 120+45 = 165 Days
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as
indicated in Sub-Clauses 16.1 and 16.2 above shall be rejected by the
Employer as non-responsive.
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of
the end of the bid validity period specified in Sub-Clause
16.5The Bid Security of the successful bidder will be discharged when the bidder has
signed the Agreement and furnished the required Performance Security.
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) #If found necessary, the bidder will be intimated for negotiation, He will
be intimated maximum three times within the validity period for
negotiation, If contractor does not respond in time, his Bid Security
will be forfeited and his tender will be rejected. Punitive action will be
Sign. of the Contractor Sign. of the Executive Engineer
taken on such contractors. (As per GoG R&B Dept’s Gr. No.
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the
bidding documents, including the conditions of contract (including
mobilization advance or time for completion), basic technical design as
indicated in the drawing and specifications. Conditional offers or alternative
offers will not be considered further in the process of tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause
12 of these Instructions to bidder as the “Technical Bid “and “Financial Bid”
in separate parts to be uploaded.
Sign. of the Contractor Sign. of the Executive Engineer
D. SUBMISSIONOFBIDS
20. Deadline for Submission of the Bids
20.1. Complete Bids must be received online by the Employer at the tender website
specified above not later than the date indicated in appendix.
20.2. The Employer may extend the deadline for submission of bids by issuing an
amendment in accordance with Clause 10, in which case all right and
obligation of the Employer and the bidders previously subject to the original
deadline will then be subject to the new deadline.
22. Modification and Withdrawal of Bids
22.1. Bidders may modify or withdraw their bids online before the deadline
prescribed in Clause 20 or pursuant to Clause
22.3. No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.4. Withdrawal or modification of a bid between the deadline for submission of
bid sand the expiration of the original period of bid validity specified in
Clause 15.1above or as extended pursuant to Clause 15.2 may result in the
forfeiture of the Bid security pursuant to Clause
Sign. of the Contractor Sign. of the Executive Engineer
E. Bid Opening and Evaluations
23. Bid Opening
23.1The Employer will open all the Bids received including modifications made
pursuant to Clause 22, in the presence of the Bidders or their representatives
who choose to attend at time, date and the place specified in Appendix in the
manner specified in Clauses 20 and 23.3, In the event of the specified date of
Bid opening being declared a holiday for the Employer, the Bids will be
opened at the appointed time and location on the next working day.
23.3. The “Technical Bid” shall be opened. The amount, form and validity of the bid
security furnished with each bid will be announced. If the bid security
furnished does not conform to the amount and validity period as specified in
the invitation for bid (ref. Column 4 and paragraph 3), and has not been
furnished in the form specified in Clause 16, the technical bid will not be
23.4. (i)Subject to confirmation of the bid security by the issuing Bank, the bids
accompanied with valid bid security will be taken up for evaluation with
respect to the Qualification information and other information furnished
in part I of the bid pursuant to Clause 12.1.
(ii) If required, the bidder will be asked in writing to clarify his Qualification
Documents with respect to any required clarification.
(iii) The bidders will respond in not more than 7 days of issue of the
clarification letter.
(iv) Immediately (usually within 3 or 4 days), on receipt of this clarification
the Evaluation Committee will finalize the list of responsive bidders
whose financial bids are eligible for consideration.
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of
only these bidders will be opened. The responsive Bidders’ names, the Bid
prices, the total amount of each bid, any discount and such other details as the
prices, the total amount of each bid, any discount and such other details as the
Employer may consider appropriate, will be announced by the Employer at
23.7 the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of
only these bidders will be opened. The responsive Bidders’ names, the Bid
prices, the total amount of each bid, any discount, and such other details as the
prices, the total amount of each bid, any discount, and such other details as the
Employer may consider appropriate, will be announced by the Employer at
Sign. of the Contractor Sign. of the Executive Engineer
23.8 In case bids are invited for more than one package, the order for opening of
the “Financial Bid” shall be in order of Estimated amount of Bids from highest
23.9 The Employer shall prepare minutes of the Bid opening, including the
information disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and
comparison of Bids and recommendations for the award of a contract shall not
be disclosed to Bidders or any other persons not officially concerned with such
process until the award to the successful Bidder has been announced. Any
effort by Bidder to influence the Employer’s processing of Bids or award
decisions may result in the rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the
Employer may, at his discretion, ask any Bidder for clarification of his Bid,
including breakdowns of unit rates. The request for clarification and the
response shall be in writing or by e- mail, but no change in the price or
substances of the Bid shall be sought, offered, or permitted except as required
to confirm the correction of arithmetic errors discovered by the Employer in
the evaluation of the Bids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter
relating to his Bid opening to the contract is awarded. If the Bidder wishes to
bring additional information to the notice of the Employer, it should do so in
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid
evaluation, bid comparison or contract award decision may result in the
rejection of the Bidders’ bid.
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will determine
whether each Bid (a) meets the eligibility criteria defined in Clause 3 and 4;
(b) has been properly signed; (c) is accompanied by the required securities and;
(d) is substantially responsive to the requirements of the Bidding document.
During the detailed evaluation of the “Financial Bid”, the responsiveness of
the bids will be further determined with respect to the remaining bid
conditions, i.e., priced bill of quantities, technical specifications, and drawings.
Sign. of the Contractor Sign. of the Executive Engineer
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms,
conditions and specifications of bidding documents, without material deviation
or reservation. A material deviation or reservation is one (a) which affects in
any substantial way the scope, quality, or performance of the Works; (b) which
limits in any substantial way, inconsistent with the Bidding documents, the
Employer’s rights or the Bidder’s obligations under the Contract; or (c) whose
rectification would affect unfairly the competitive position of other Bidders
presenting substantially responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the
Employer, and may not subsequently be made responsive by correction or
withdrawal of the non-conforming deviation or reservation.
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be
substantially responsive in accordance with Sub-Clause 26.2.
29.3. The Employer reserves the right to accept or reject any variation or deviation.
Variation and deviations and other factors, which are in excess of the
requirements of the Bidding documents or otherwise result in unsolicited
benefits for the Employer, shall not be taken in to account in Bid evaluation.
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the
Conditions of Contact, during the period of implementation of the Contract,
will not be taken in to account in Bid evaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the
Engineer’s estimate of the cost of work to be performed under the contract the
Employer may require the Bidder to produce detailed consistency of those
prices with the construction methods and schedule proposed. After evaluation
of the price analyses, the Employer may require that the amount of the
performance security set forth in Clause 34 be increased at the expense of the
successful /bidder to a level sufficient to protect the Employer against financial
loss in the event of default of the successful Bidder under the Contract.
29.6. A bid which contains several items in the bill of Quantities which are
unrealistically priced low and which cannot be substantiated satisfactorily by
the bidder may be rejected as non-responsive.
Sign. of the Contractor Sign. of the Executive Engineer
F. AWARD OF CONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder
whose Bid has been determined.
(i) to be substantially responsive to the Bidding documents and who has
offered the lowest evaluated Bid Price; and
(ii) to be within the available bid capacity adjusted to account for his bid
price which is the lowest evaluation in any of the packages opened
earlier than the one consideration.
In no case, the contract shall be awarded to any bidder whose available
bid capacity is less than the evaluated bid price, even if the said bid is the
lowest evaluated bid. The contract will in such cases be awarded to the next
lowest bidder at his evaluation bid price.
32. Employer’s Right to Accept any Bid and to Reject any or all Bids
32.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject
any Bid, and to cancel the Bidding process and reject all Bids, at any time prior
to the award of contract, without thereby incurring any liability to the affected
bidder or Bidder or any obligation to inform the affected Bidder or Bidders of
the grounds for the Employer’s action.
33. Notification of Award and Signing of Agreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the
Employer prior to expiration of the Bid validity period by cable, telex or
facsimile confirmed by registered letter. This letter (hereinafter and in the
condition of contract called the “Letter of Acceptance”) will state the sum that
the Employer will pay the Contract or in consideration of the execution,
completion, and maintenance of the Works by the Contractor as prescribed by
the Contract (hereinafter and in the Contract called the “Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject
only to the furnishing of a performance security in accordance with the
provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the
successful Bidder. It will be signed by the Employer and to the successful
Bidder, within 28 days following the notification of award along with the
Letter of Acceptance. Within 21 days of receipt, the successful Bidder will
sign the Agreement and deliver it to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the
Employer will promptly notify the other Bidders that their Bids have been
Sign. of the Contractor Sign. of the Executive Engineer
34. Performance Security
34.1. (A)Within 10 (Ten) days of receipt of Letter of Acceptance, the successful
Bidder shall furnish to the Employer an irrevocable and unconditional
guarantee from a Bank in the form set forth in Section 8 (the “Performance
Security”) for an amount equal to 5% (five percent) of its Contract Price.
In case of bids mentioned below, the successful Bidder, along with the
Performance Security, shall also furnish to the Authority an irrevocable
and unconditional guarantee from a Bank in the same form given at Section
8 towards an Additional Performance Security (The “Additional
Performance Security”) for an amount calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than
10% but up to 20% of the Estimated Project Cost, then the
Additional Performance Security shall be calculated @ 20% of the
difference in the (i) Estimated Project Cost (as mentioned in Bid
Document) - Minus 10% of the Estimated Project Cost and (ii)
Contract Price offered by the selected Bidder.
(b) If the Contract Price offered by the Selected Bidder is lower than
20% of the Estimated Project Cost, then the Additional Performance
Security shall be calculated @ 30% of the difference in the (i)
Estimated Project Cost (as mentioned in Bid Document) - Minus
10% of the Estimated Project Cost and (ii) Contract Price offered by
the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the
Performance Security.
(B)The Performance Security shall be valid beyond 60(Sixty) days of the
Defects Liability Period and the Additional Performance Security shall
be valid beyond 28 (twenty-eight) days of Project Completion Date.
34.2. If the performance security is provided by the successful Bidder in the form
of a Bank Guarantee, it shall be issued either (a) at the Bidder’s option, by a
Nationalized/Scheduled Indian bank or (b) by a foreign bank located in India
and acceptable to the Employer. As per GoG Finance Department’s Circular
No. FD/MSM/e-file/4/2023/0057/D.M.O. Date 21/04/2023 or as per their
latest amendment.
34.3. Failure of the successful Bidder to comply with the requirement of Sub-
Clause 34.1 shall constitute sufficient grounds for cancellation of the award
and forfeiture of the Bid Security.
35 Advance Payment and Security
35.1 The Employer will provide an Advance payment on the Contract Price as
stipulated in the Conditions of Contract, subject to maximum amount, as
stated in the Contract Data.
Sign. of the Contractor Sign. of the Executive Engineer
37. Corrupt of Fraudulent Practices
37.1 The Employer will reject a proposal if it determines that the Bidder
recommended for award has engaged in corrupt or fraudulent practices in
completing for the contract in question and will declare the firm ineligible,
either indefinitely or for a stated period of time, to be awarded a contract with
National Highways Authority of India/ State PWD and any other agencies, if
it at any time determines that the firm has engaged in corrupt or fraudulent
practices in completing for the contractor, or in execution.
37.2 Furthermore, Bidders shall be aware of the provision stated in Sub- Clause
59.2 of the Conditions of Contract.
Sign. of the Contractor Sign. of the Executive Engineer
APPENDIX TO ITB
Clause Reference With
respect to Section –I
1. The Name of the Employer is Executive Engineer, Ver-2 Project [Cl.1.1]
Division ,Vyara
2. The last five years.
3. This Annual Financial Turnover Amount is. N.A. [Cl.4.5.3(a)]
4. Value of Work is Rs.
6. The cost of electric work is Rs.-Nil
7. The cost of water supply / sanitary works is Rs. –Nil
8. Liquid asset sand or availability of credit facilities is [Cl.4.5.6]
9. Price level of the financial year 2025-26 . [Cl. 4.5.2]
10. The pre-bid meeting will take place at– N.A. [Cl. 9.2.1]
11. The technical Bid will be opened at the office of the Executive
Engineer, Ver-2 Project Division,Vyara,Dist-Tapi, Surat-Dhulia
Road,Opposite of Judge Bunglow. Dt …../……/25 at
12. Address of the Employer: Executive Engineer, Ver-2 Project
Division,Vyara,Dist-Tapi, Surat-Dhulia Road,Opposite of Judge
14. The bid should be submitted latest by As stated on [Cl.20.1&20
15. The bid will be opened at Executive Engineer, Ver-2 Project [Cl.23.1]
Division,Vyara,Dist-Tapi, Surat-Dhulia Road,Opposite of
Judge Bunglow..As stated on online NIT
16. The Bank Draft in favor of Executive Engineer, Ver-2 Project
Division, Vyara.
18. Escalation factors(for the cost of works Executed and financial[Cl.4.5.2]
figure to a common base value) for works completed
Year Financial Year Enhancement factor
Base (year of inviting tender) 2025-26
Sign. of the Contractor Sign. of the Executive Engineer
#LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON
[ReferenceCL.4.5.5]
Thecontractorsshallalsogivealistofmachineriesinhispossessionandwhichthey
propose to use on the work.
Sr. Plant or Location Age of Make Capacit Approximate Remark
No. Machinery Machinery y Value
Sign. of the Contractor Sign. of the Executive Engineer
List of Key Personnel to be deployed on Contract Work
(Reference Cl. 4.5.4)
#Employmentofa qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution
of this work as under: -
1. Two graduate Civil Engineers and three diploma Civil Engineers when cost of
the work to be executed is more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be
executed is more than Rs.15 lakhs but less than Rs.50 lakhs.
3. Minimum one Diploma Civil Engineer when the cost of work is less than Rs.15
lakhs but more than Rs.5 lakhs.
4. Minimum two Diploma Civil Engineers for the work when the cost of work to
be executed is less than Rs. 5 lakhs. The Engineer so employed for the
Government work must have sufficient experience to handle the work
independently. Such an Engineer shall have to stay at the site of work and he
shall not be entrusted with other duty except this work.
In case the contractor or partner of the contractor firm is a Civil Graduate
Engineer, Employment of a separate Engineer will not be necessary provided
that the Engineer partner himself attends the execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the
Deputy Executive Engineer-in-charge of the work the Name, Qualifications,
copy of marksheet, Colour Photograph and the appointment order issued such
engineers engaged for this contract work. If 15 days after issue of work order
such designated Site Engineers do not resume or do not remain present on site
of work, the recovery at the rate of Rs.15,000-00 per month per Engineer will
be made from the bills/deposit/dues of the contractor. Such recovery shall be
non-refundable.
Sign. of the Contractor Sign. of the Executive Engineer
QUALIFICATION INFORMATION
Sign. of the Contractor Sign. of the Executive Engineer
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be
used for the purpose of post qualification as provided for in Clause 4 of the Instruction
to Bidders. This information will not be incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of
Bidder (Attach Copy)
Place of registration
Principal place of business
Power of attorney of signatory of
1.2 Total value of Civil engineering constructions 2 0 2 4 - 2
Work performed in the last five years 2023-2024-…………
(in Rs. Lakhs) 2022-2023-………….
1.3.1 Work performed as prime contractor, work performed in the past as a
nominated sub-contractor will also be considered the sub-contract involved
execution of all main items of work described in the bid documents, provided
further that all other qualification criteria are satisfied (in the same name) on
works of a similar nature over the last five years** and in current year before
the submission of the bid.
Similar nature of Work.
Project Name of Description Contract Value of Date of Stipulated Actual date Remark
Name the of work No. contract issue of period of of explaining
Employer (Rs. work completion completion reasons for
Crore) order * delay &
*Attach certificate(s)from the Engineer(s)in-charge
**Immediately preceding the financial year in which bids are received.
Sign. of the Contractor Sign. of the Executive Engineer
#1.3.2 Quantities of work executed as prime contractor, work performed, in the past
as a nominated sub-contractor, will also be considered provided the sub-
contract involved execution of all main items of work described in the bid
document, provided, further that all other qualification criteria are called (in
the same name and style) in the last five years** and in current year before the
submission of the bid.
Year Name of Name of Quantity of work performed Remarks*
the work Excavation
the Concrete Gabion (indicate
Employer (CM) work work contract
1.4 Information on Bid Capacity (works for which bids have been submitted and
works which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Description Place Contract Name Value Stipulated Value of Anticipated
of works & No. &Address Contract Period of Works* of
State of (Rs. Cr) Completio remaining completion
Employer n to be
*Attach certificate(s)from the Engineer(s)in-charge
**Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works
(Ref. Clause 4.5.5). The Bidder should list all the information requested below.
Item of Requirement Availability Proposals Remarks
Sign. of the Contractor Sign. of the Executive Engineer
Equipment NO Capacity Owned/ Nos/. Age/ (from
Leased to be Capacity Conditions whom to
1.6 Qualifications and experience of key personnel required for administration and
execution of the contract. Attach biographical data. Refer also to Sub Clause
9.1 of the Conditions of Contract.
Position Name Qualification Year of Year of
Experience experience in
(General) the proposed
1.7 Proposed sub-contract and firms involved
Sections of the Value of Sub- Sub-Contractor Experience in
works Contractor (Name &Address) similar work
Attach copies of certificates on possession of valid license for executing water
Sign. of the Contractor Sign. of the Executive Engineer
supply/ sanitary work/ building electrification works.
1.8 Financial reports for the last five years: balance sheets, profit and loss
statements, auditors’ reports (in case of companies/corporations), etc. List
them below and attach copies.
1.9 Evidence of access to financial resources to meet the qualification
requirements: cash in hand, lines of credit, etc. List them below and attach
copied documents.
1.10 Name, address, and telephone, telex, and fax numbers of the Bidders bankers
who may provide references if contacted by the Employer.
1.11 Information on Litigation history in which the Bidder is involved.
Other Party(ies) Employer Cause of Dispute Amount Remarks
Involved showing Present
1.12.Statement of compliance under the requirements of Sub Clause 3.2 of the
instruction to Bidders. (Name of Consultant engaged for project preparations
1.13 Proposed work method and schedule. The Bidder should attach descriptions,
drawings and charts as necessary to comply with the requirements of the
Bidding documents. (Refer ITB Clause 4.1)
3. Additional Requirements
3.1 Bidders should provide any additional information required to fulfill the
requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
* Fill the name of Consultant
Sign. of the Contractor Sign. of the Executive Engineer
SAMPLE FORMAT FOR EVIDENCE OF
ACCESS TO OR AVAILABILITY OF
CREDIT FACILITIES
(CLAUSE4.5.6OFITB)
BANK CERTIFICATE
This is to certify that M/s. is a reputed
company with a good financial standing.
If the contract for the work, namely is awarded to the
above firm, we shall be able to provide overdraft/credit facilities to the extent
Rs. To meet their working capital requirements for executing the
above during the contract period.
Senior Bank Manager
Address of the Bank
Sign. of the Contractor Sign. of the Executive Engineer
1. I, the undersigned, do hereby certify that all the statements made in the
required attachments are true and correct.
2. The undersigned also here by certifies that neither our firm M/s.
have not abandoned any work
of Government of Gujarat/Government of India/any Board or Corporation
under Government of Gujarat/Government of India nor any contract
awarded to us for such works have been rescinded, during last five years
prior to the date of this bid.
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm
corporationtofurnishpertinentinformationdeemednecessaryandrequestedby
the Department to verify this statement or regarding any (our) competence
and general reputation.
4. The Undersigned understands and agrees that further qualifying
information may be requested, and agrees to furnish any such information
at the request of the Department/ Project implementing agency.
(Signed by an Authorized Officer of the Firm)
Title of Officer
Sign. of the Contractor Sign. of the Executive Engineer
I, the undersigned do here by undertake that our firm
cash up to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the
Title of officer
Sign. of the Contractor Sign. of the Executive Engineer
CONDITIONS OF CONTRACT
Sign. of the Contractor Sign. of the Executive Engineer
Conditions of Contract
Table of Contents
A. General D. Cost Control
1 Definitions 42 37 Bill of Quantities
2 Interpretation 43 38 Changes in the Quantities
3 Language and Law 44 39 Variations
4 Engineer’s Decisions 44 40 Payments for Variations
5 Delegations 44 41 Cash Flow Forecasts
6 Communications 44 42 Payment Certificates
7 Sub-Contractors 45 43 Payments
8 Other Contractors 45 44 Compensations Events
9 Personnel 45 45 Tax
10 Employer’s & Contractor Risk 45 46 Currencies
11 Employers Risks 45 47 Price Adjustment
12 Contractor’s Risk 46 48 Retention
13 Insurance 46 49 Liquidated damages
14 Site Investigations Reports 46 50 Bonus
15 Queries about the Contract 46 51 Advance Payment
16 Contractors to Construct the works 47 52 Securities
17 The Works to be Completed By 47 53 Deleted
The Intended Completion Date
18 Approval by the Engineer 47 54 Cost of Repair
20 Discoveries 47 E. Finishing the Contract
21 Possession of the Site 47 55 Completion
22 Access to the Site 48 56 Taking Over
23 Instructions 48 57 Final Account
24 Disputes 48 58 Operating and Maintenance
25 Procedure for Disputes 49 59 Terminations
26 Deleted 49 60 Payment upon Terminations
B. Time Control 62 Release from Performance
28 Extensions of the Intended 50 F. Special Conditions of
completion date Contract
29 Deleted 51 63 Labour
30 Delays Ordered by The Engineer 51 64 Compliance with labour
31 Management Meetings 51 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
Sign. of the Contractor Sign. of the Executive Engineer
CONDITIONS OF CONTRACT
1.1 Terms which are defined in the Contract Data are not also defined in the
Conditions of Contract but keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities
forming part of the Bid
Compensation Events are those defined in Clause 44 here under
The Completion Date is the date of completion of the Works as certified by
the Engineer in accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to
execute, complete and maintain the Works till the completion of Defects
Liability Period. It consists of the documents listed in Clause 2.3 below.
The Contract data defines the documents and other information which
comprise the Contract.
The Contractor is a person or corporate body whose Bid to carry out the
Work has been accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by the
Contractor to the Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and
thereafter as adjusted in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and
calculated from the Completion Date.
The Employer is the party who will employ the Contractor to carry out the
The Engineer is the person named in the Contract Data (or any other
competent person appointed and notified to the contract or to act in
replacement of the Engineer) who is responsible for supervising the
Contractor, administering the Contract, certifying payments due to the
Sign. of the Contractor Sign. of the Executive Engineer
Contractor, issuing and valuing Variations to the Contract, awarding
extensions of time, and valuing the Compensations Events.
Equipment is Contractor’s machinery and vehicles brought temporarily to
the site to construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s Letter
of Acceptance. The Intended Completion Date is the date on which it is
intended that the Contractor shall complete the Works. The Intended
Completion Date is specified in the Contract Data. The Intended Completion
Date may be revised only by the Engineer by issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor for
incorporation in the works.
Plant is any integral part of the work which is to have mechanical, electrical,
electronic or chemical or biological functions.
The Site is the are a defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding
documents and are factual interpretive reports about the surface and subsurface
conditions at the site.
Specifications means the Specifications of the works included in the Contract
and any modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the Contractor
shall commence execution of the works. It does not necessarily coincide with
any of the Site Possession Dates.
A Subcontractor is a person or corporate body who has a Contract with the
ContractortocarryoutapartoftheworkintheContractwhichincludesworkonthe
Temporary Works are works designed, constructed, installed, and removed
by the Contractor which are needed for construction or installation of the
A Variation is an instruction given by the Engineer, which varies the Works.
The Works are what the Contract requires the Contract or to construct, install
and turnover to the Employer, as defined in the Contract Data.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural,
male also means female or neuter and the other way around. Heading
have no significance. Words have their normal meaning under the
Sign. of the Contractor Sign. of the Executive Engineer
language of the Contract unless specifically defined. The Engineer will
provide instructions clarifying queries about Conditions of Contract.
2.2 If sectional completion is specified in the Contract Data, references in
the Conditions of Contract to the Works, the Completion date, and
Intended Completion Date apply to any Section of the Works (other than
references to the Completion Date and Intended Completion date for the
2.3 The documents forming the Contract shall be interpreted in the
following order of priority
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part
of the Contract.
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are
stated in the Contract Data.
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide
contractual matters between the Employer and the Contractor in the role
representing the Employer.
5.1 The Engineer may delegate any of his duties and responsibilities to other
people after notifying the Contractor and may cancel any delegation
after notifying the Contractor.
6. Communications
6.1 Communications between parties which are referred to in the conditions
are effective only when in writing. A notice shall be effective only when
it is delivered (in terms of Indian Contract Act).
Sign. of the Contractor Sign. of the Executive Engineer
7. Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit
specified in contract data, with the approval of the engineer but may not
assign the Contract without the approval of the Employer in writing.
Subcontracting shall not alter the Contractor’s obligations. Sub-
contracting of supply or specific items of work is not allowed.
7.2 The sub-contractor must be registered in appropriate class and category
for the part of work to be subcontracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors,
public authorities, utilities and the Employer between the dates given in
the Schedule of other Contractor. The Contractors shall as refer to in the
Contract Data, also provide facilities and services for them as described
in the Schedule. The employer may modify the schedule of other
contractors and shall notify the contractor of any such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule
of Key Personnel as referred to in the Contract Data to carry out the
functions stated in the Schedule or other personnel approved by the
Engineer. The Engineer will approve any proposed replacement of key
personnel only if their qualifications, abilities, and relevant experience
are substantially equal to or better than those of the personnel listed in
9.2 If the engineer asks the Contractor to remove a person who is a member
of the Contractor Staff or his work force stating the reasons the
Contractor shall ensure that the person leaves the Site within seven days
and has no further connection with the work in the Contract.
10. Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are
Employer’s risks, and the Contractor carries the risks which these
Contracts states are Contractors risk.
11. Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so
far as they directly affect the execution of the Works, the risks of war,
hostilities, invasion, act of foreign enemies, rebellion, revolution,
insurrection or military or usurped power, civil war, riot commotion or
disorder (unless restricted to the Contractor’s employees), and
contamination from any nuclear fuel or nuclear waste or radioactive
toxic explosive.
Sign. of the Contractor Sign. of the Executive Engineer
12. Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal
injury and death which arise during and in consequence of the
performance of the Contract other than the excepted risks are the
responsibility of the Contractor.
13.1 The Contractor shall provide, in the joint names of the Employer and the
Contractor, insurance cover from the Start date to the end of the Defects
Liability Period, in the amounts and deductibles stated in the Contract
data for the following events which are due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant,
Materials and Equipment) in connection with the Contract; and
(d) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the
Contractor to the Engineer for the Engineer’s approval before the Start
Date. All such insurance shall provide for compensation to be payable
in the types and proportions of currencies required to rectify the loss or
damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates
required, the Employer may affect the insurance which the Contractor
should have provided and recover the premiums the Employer has paid
from payments otherwise due to the Contractor or, if no payment is due,
the payment of the premiums shall be a debt due.
13.4 Alterations to the terms of an insurance shall not be made without the
approval of the Engineer.
13.5 Both parties shall comply with any conditions of the insurance policies.
14. Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation
reports referred to in the Contract Data, supplemented by any
information available to the Bidder.
15. Queries about the Contract data
15.1 The engineer will clarify queries on the Contract Data
16. Contractor to Construct the Works
Sign. of the Contractor Sign. of the Executive Engineer
16.1 The Contractor shall construct and install the works in accordance with
the specification and Drawings.
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date
and shall carry out the Works in accordance with the programmer
submitted by the Contractor, as updated with the approval of the
Engineer, and complete them by the Intended Completion date
18. Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the
proposed Temporary works to the Engineer, who is to approve them if
they comply with the Specifications and drawings.
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for
design of the Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the
Temporary works where required.
18.5 All Drawings prepared by the Contractors for the execution of the
temporary or permanent work are subject to prior approval by the
Engineer before their use.
19.1 The Contractor shall be responsible for the safety of all activities on the
20. Discoveries
20.1 Anything of historical or other interest or of significant value
unexpectedly discovered on the site is the property of the Employer. The
contractor is to notify the engineer of such discoveries and carry out the
Engineer’s instructions for dealing with them.
21. Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the
Contractor. If possession of a part is not given by the date stated in the
Contract Data the Employer is deemed to have delayed the start of the
relevant activities and this will be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the
site is not handed over to the Contractor, then contractor/ Employer may
fore-close the contract. Contractor/Employer has to foreclose the work
Sign. of the Contractor Sign. of the Executive Engineer
within 30 days after lapse of 25%-time limit and after 30 days
foreclosure option will be closed.
22. Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by
the Engineer access to the Site, to any place where work in connection
with the Contract is being carried out or is intended to be carried out and
to any place where materials or plants are being
manufactured/fabricated/ assembled for the works.
23. Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining
to works which comply with the applicable laws where the site is
23.2 The Contractor shall permit the Employer to inspect the Contractor’s
accounts and records relating to the performance of the Contractor and
to have them audited by auditors appointed by the Employer, if so
required by the Employer.
24.1 If the Contractor is of the view that a decision taken by the Engineer was
either outside the authority given to the Engineer by the Contract or that
the decision was wrongly taken, the decision shall be referred to
#Superintending Engineer(Higher Authority)within 14 days of the
notification of the Engineer's decision. If the issue is not resolved, any
party can refer the matter for conciliation within 15 days from the
decision given by the #Superintending Engineer.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied
with the decision of the #Superintending Engineer, both the parties
have to refer to the Chief Engineer concern for the conciliation
(b) For the work more than Rs.100 Cr., if any of the parties is not
satisfied with the decision of the #Superintending Engineer, both
the parties have to refer to the #Secretary, Roads & Building
Department, Government of Gujarat for the conciliation process.
If the dispute is not resolved through the conciliation process, he may refer
the dispute to Gujarat Public Works Contract Dispute Arbitration
Tribunal. If the Contractor fails to refer a claim / dispute to the Higher
Authority within 14 days of the notification of the Engineer's decision, the
Contractor shall not be entitled to any additional payment/claim if he
doesn’t follow the above sequence in stipulated time and he should not
Sign. of the Contractor Sign. of the Executive Engineer
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration
procedure stated in the Special Conditions of Contract.
Sign. of the Contractor Sign. of the Executive Engineer
B. TIME CONTROL
27.1 Within the time stated in the Contract Data the Contractor shall submit
to the Engineer for approval a Programme showing the general methods,
arrangements orders, and timing for all the activities in the works along
with monthly cash flow forecast.
27.2 An update of the Programme shall be a programme showing the actual
progress achieved on each activity and the effect of the progress
achieved on the timing of the remaining work including any changes to
the sequence of the activities.
27.3 The Contractor shall submit to the Engineer, for approval an updated
programme at intervals no longer than the period stated in the Contract
data. If the Contractor does not submit an updated programme within
this period, the Engineer may withhold the amount stated in the Contract
data from the next payment after the date on which the overdue
programme has been submitted.
27.4 The Engineer’s approval of the programme shall not alter the
Contractor’s obligations. The Contractor may revise the programme and
submit it to the Engineer again at any time. A revised programme is to
show the effect of Variations and Compensations events.
28. Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a
compensation Event occurs or a Variation is issued which makes it
impossible for completion to be achieved by the Intended Completion
Date without the Contractor taking steps to accelerate the remaining
work and which would cause the Contractor to incur additional cost.
28.2 The Engineer shall decide whether and by how much to extend the
Intended Completion Date within 35 days of the Contractor asking the
Engineer for a decision upon the effect of a compensation event or
Variation and submitting full supporting information. If the Contractor
has failed to give early warning of a delay or has failed to cooperate in
dealing with a delay, the delay by this failure shall not be considered in
assessing the new Intended Completion Date.
28.3 The Engineer shall within 14 days of receiving full justification from the
contractor for extension of Intended Completion Date refer to the
Employer his decision. The employer shall in not more than 21days
communicate to the engineer the acceptance or otherwise of the
Engineer’s decision. If the employer fails to give his acceptance, the
Sign. of the Contractor Sign. of the Executive Engineer
Engineer shall not grant the extension and the contractor may refer the
matter under Clause
30. Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or progress
of any activity within the works.
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a
management meeting. The business of a management meeting shall be
to review the plans for remaining work and to deal with matters raised
in accordance with the early warning procedure.
31.2 The Engineer shall record the business of management meetings and is
to provide copies of his record to those attending the meeting and to the
Employer. The responsibility of the parties for actions to be taken is to
be decided by the Engineer either at the management meeting or after
the management meeting and stated in writing to all who attended the
32. Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of
specific likely future events or circumstances that may adversely affect
the quality of the work, increase the Contract price or delay the
execution of works. The Engineer may require the contractor to provide
an estimate of the expected effect of the future event or circumstance on
the contract price and completion date. The estimate is to be provided
by the Contractor as soon as reasonably possible.
32.2 The Contractor shall cooperate with the Engineer in making and
considering proposals for how the effect of such an event or
circumstance can be avoided or reduced by anyone involved in the work
and in carrying out any resulting instruction of the Engineer.
Sign. of the Contractor Sign. of the Executive Engineer
C. QUALITYCONTROL
# 33. Identifying Defects/Defect liability period
33.1: Defect liability period: The contractor shall be responsible to make good
and remedy at his own expense any defect which may develop or may
be noticed before the period mentioned hereunder from the certified date
of completion. The Engineer in charge shall give the contractor a notice
in writing about the defects and the contractor shall make good the same
within 15 days of receipt of the notice. In the case of failure on the part
of the contractor, the Engineer- in-charge may rectify or remove or re-
execute the work at the risk & cost of the contractor. The Engineer-in-
charge shall be entitled to appropriate the whole or any part of the
amount of security deposit towards the expenses, if any, Incurred by him
in rectification, removal or re-execution. The Defects Liability period
shall be as under….
A. For works of WRD Except Building
(a) (1) For all works costing up to Rs. 50,000 (amount put to tender), the
period shall be 3 Months from the certified date of completion.
(b) (1) For WRD works likes Check Dam/ Canal / Drainage / Road
Structure tender amount from RS. 50,000 to 10,00,000, the defect
liability period shall be 12 months from the certified date of completion.
(2) For WRD work except likes Check Dam/ Canal / Drainage / Road
Structure tender amount from RS. 50,000 to 10,00,000, the defect
liability period shall be 6 months from the certified date of completion.
(c) (1) For WRD works likes Check Dam/ Canal / Drainage / Road
Structure tender amount more than RS. 10,00,000, the defect liability
period shall be 3 Years from the certified date of completion.
(2) For WRD work except likes Check Dam/ Canal / Drainage / Road
Structure tender amount from RS. 10,00,000 to 1 Crore, the defect
liability period shall be 12 months from the certified date of completion.
(d) (1) For all WRD works of tender amount more than RS. 1 Crore, the
defect liability period shall be 3 Years from the certified date of
(2) For this work the period shall be 36 Months from the certified date of
completion which should include three monsoons.
B. For Building works of WRD:-
For Building works of WRD, Follow the R&B Circular dated.03/12/2009
For original building works the defect liability period will be 4 years or
elapse of 4 monsoon period following date of possession of building
taken over by user agency following the certified date of completion,
whichever is later. For the purpose of deciding the monsoon period, the
30th September shall be treated as the last date.
Sign. of the Contractor Sign. of the Executive Engineer
WRD Circular No. Matas/102013/MICELL(K-1) Dated 13/12/2013
33.2 For Road works :
Free maintenance guarantee period for works of Road/Bridge
(a) For resurfacing work of road free maintenance guarantee period one
year from the date of completion.
(b) In case of widening of the road/strengthening of the road/bridge, the
contractor shall have to give four years free maintenance guarantee
from the certified date of completion. During this period the
contractor shall visit the site every Nine months along with the
concerned Section Officer / Deputy Executive Engineer and will
examine the work already carried out in this contract like road work,
jungle cutting, side shoulders, side gutter, road furniture, patta etc.
and will prepare Km. wise inspection report duly signed by all
concerned and any defect observed shall be done within 15 days by
the contractor at his risk and cost as per the direction of Engineer in
charge. The contractor needs to do videography of these visits and
require to submit at the time of release of FMG. If B.T. the surface
the maintenance period of 4 years is worn out then agency shall have
to provide renewal coating as per tender item as directed by the
Engineer-in- charge. The amount equivalent to 5% of each running
bill shall be withheld and will be released after the free maintenance
guarantee period (i.e. 4 years) is over.
However, this amount shall be released against fixed deposit or
bank guarantee pledged in the name of Executive Engineer after
completion certificate of work is issued.
(1) The flakiness and elongation index (combined) for coarse aggregates
under no circumstances shall exceed the allowable limit set forth in
the relevant clause for the material in question.
(2) 2% of the amount eligible for the payment of bituminous items shall
be withheld till the miscellaneous items like earthwork in
embankment / cutting for side shoulders, side gutters, kilometer /
indicator / guard stones, sign boards etc. are completed in all respect
by the contractor. After completion of the miscellaneous items, the
above said 2% withheld amount shall be released.
(Govt. of Gujarat's G.R. No.: TNC-10-2013-3(Part-3)/C, Dtd.
Sign. of the Contractor Sign. of the Executive Engineer
(3) Videography for the surface under Maintenance Guarantee is to be
done as per Govt. letter No.: SSR/10/2015-16/26/C, Dtd. 26/11/15
for the work costing more than Rs. 5.00 Crore.
(4) Setting up of adequate laboratory & deployment of quality engineers.
The contractor shall have to set up the laboratory with adequate
equipment. Till the setting up of adequate laboratory is completed &
reported of this to the engineer (subject to due verification by
engineer’s representative) by contractor in writing, Rs.2,00,000/-
shall be withheld. The qualified quality Engineer shall be deployed
exclusively for this contract by the contractors. If quality Engineer is
not deployed by contractor within one month after the date of work
order, the amount equivalent to Rs.20,000 per month shall be
recovered till the actual deployment of quality engineer. The amount
so recovered towards the deployment of quality engineers shall not
(5) Asphalt work will have to be cross checked as per G.R. No.:
RGN/60/2006/35/C, dtd.31/05/07 before final bill is paid.
(6) Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain, at his
own risk and cost, the existing lane(s) of the road so that the traffic
worthiness and safety thereof are at no time materially inferior as
compared to their condition 10 (ten) days prior to the date of the
Agreement, and shall undertake the necessary repair and
maintenance works for this purpose; provided that the Contractor
may, at his cost, interrupt and divert the flow of traffic if such
interruption and diversion is necessary for the efficient progress of
works and conforms to Good Industry Practice; provided further that
such interruption and diversion shall be undertaken by the Contractor
only with the prior written approval of the Executive Engineer which
approval shall not be unreasonably withheld. For the avoidance of
doubt, it is agreed that the Contractor shall at all times be responsible
for ensuring safe operation of the road.
33.3 The Engineer shall check the Contractor’s work and notify the
Contractor of any defects that are found. Such checking shall not affect
the Contractor’s responsibilities the Engineer may instruct the
Contractor to search for a Defect and to uncover and test any work that
the Engineer considers may have a Defect.
Sign. of the Contractor Sign. of the Executive Engineer
34.1 If the engineer instructs the Contractor to carry out a test not specified
in the Specification to check whether any work has a Defect and the test
shows that it does, the Contractor shall pay for the test and any samples.
If there is no defect the test shall be a Compensation Event.
34.2 #1% of the amount of work done for works upto Rs. 10 crore of estimate
cost should be deducted from R.A. Bill of the contractor for testing the
quality of material workmanship. Whereas for estimated cost of works
more than 10 crore, the charges for testing of quality of material
workmanship shall be deducted from R.A. bill of contractor as per actual
charges. As Per GoG NWRWS & K Department’s Circular No.
PARCH/132023/401/MICELL Dated:05/10/2023
34.3 Agency has to establish testing laboratory on site for the various test to
be carried out in the work for this purpose agency shall construct a
pukka laboratory building with all facility on site at location specified
by the engineer in charge.
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the
end of the defects Liability Period, which begins at Completion and is
defined in the contract data. The Defects Liability Period shall be extended
for as long as Defects remain to be corrected.
35.2 Every time notice of a Defect is given, the Contractor shall correct the
notified defect within the length of time specified by the Engineer’s
36. Uncorrected Defects
36.1 If the Contractor has not corrected a defect within the time specified in the
Engineer’s notice, the Engineer will assess the cost of having the Defect
corrected, and the Contractor will pay this amount.
Sign. of the Contractor Sign. of the Executive Engineer
D. COST CONTROL
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions,
installation, testing and commissioning work to be done by the
37.2 The bill of Quantities is used to calculate the Contract price. The
Contractor is paid for the quantity of the work done at the rate in the Bill
of Quantities for each item.
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to
the original specifications, drawings, designs and instructions that may
appear to him to be necessary or advisable during the progress of the
work and the contractor shall be bound to carry out the work in
accordance with any instruction in this connection which may be given
to him in writing signed by the Engineer and such alteration shall not
invalidate the contract and any additional work which the contractor
may be directed to do in the manner above specified as part of the work
shall be carried out by the contractor on the same conditions in all
respects on which he agreed to do the main work and at the same rate as
are specified in the tender for the main work.
Except that when the quantity of any item exceeds the quantity as in the
tender by more than 130%, the contractor will be paid for the quantity
in excess of 130%, at the rate entered in the SOR of the year during
which the excess in quantity is first executed.
39.1 All Variations shall be included in updated programmes produced by
the Contractor.
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no
rate is specified in this contract, then such class of work shall be carried
Sign. of the Contractor Sign. of the Executive Engineer
(i) At the rate derived from the item within the contract which is
comparable to the one involving additional or altered class of work;
where there are more than one comparable items, the item of the contract
which is nearest in comparison with regard to class or classes of the
work involved shall be selected and the decision of the Superintending
Engineer as to the nearest comparable item shall be final and binding on
the contractor.
(ii)If the rate cannot be derived in accordance with (i) above, such class of
works shall be carried out at the rate entered in the Schedule of Rates of
for the year in which the tender was received, increased or decreased by
the percentage by which the tender amount is more or less as compared
to the amount arrived at the rates in the “Schedule of Rates” of the
Division in the year in which the tender was received. If the Schedule of
rates of the Division does not contain all the items, the percentage
increase or decrease of the tender shall be calculated considering such
items which were included in the “Scheduled Rates” of the division for
the year and for materials consumed on such item the rate to be charged
would be the basic rate taken into accountfor fixing the rate in S.O.R.
referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class
of work shall be carried out at the rate decided by the competent
authorities on the basis of detailed rate analysis after hearing the
contractor before a Committee of two Superintending Engineers
stationed at the same place or the nearest place.
40.2 If the additional or altered work, for which no rate is entered in the
“Schedule of Rates” of the Division is ordered to be carried out before
the rate is agreed upon, then the contractor shall within seven days of
the date of receipt by him of the order to carry out the work, inform the
Engineer-in-charge of the rate, which it is his intention to charge for
such class of work and if the Engineer in charge does not agree to this
rates, he shall by notice in writing be at liberty to cancel his order to
carry out such class of work and arrange to carry it out in such manner
as he may consider it advisable, provided always that if the contractor
shall commence work or incur any expenditure in regard thereof before
the rates shall have been determined as lastly herein beforementioned,
Sign. of the Contractor Sign. of the Executive Engineer
then in such cases he shall only be entitled to be paid in respect of the
work carried out or expenditure incurred by him prior to the date of the
determination of the rate as aforesaid according to such rate or rates as
shall be fixed by the Engineer-in-charge. In the event of the dispute, the
decision of the Superintending Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the
designs, drawings and specifications recommended by the contractor
and accepted by the competent authority, the alternation above referred
to shall be within the scope of such designs, drawings and specifications
appended to the tenders.
The time limit for the completion of the work shall be extended
in the proportion that the increase in the cost occasioned by alterations
bears to the cost of the original work and the certificate of the Engineer-
in-charge as to such proportion shall be final and conclusive.
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the
engineer with an updated cash flow forecast.
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the
estimated value of the work completed less the cumulative amount
certified previously.
42.2 The Engineer shall check the Contractor’s monthly statement within
days and certify the amount to be paid to the Contractor after taking in to
account any credit or debit for the month in question in respect of
materials for the works in the relevant amounts and under conditions set
forth in sub-clause
32.3of the Contract Data(secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of
the items in the Bill of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and
compensation events.
42.6 The Engineer may exclude any item certified in a previous certificate or
reduce the proportion of any item previously certified in any certificate in
the light of later information
Sign. of the Contractor Sign. of the Executive Engineer
43.1 Payments shall be adjusted for deductions for advance payments,
retention, other recoveries in terms of the contract and taxes at source, as
applicable under the law. The Employer shall pay the Contractor the
amounts certified by the Engineer within 28 days of the date of each
43.2 Payment of GST (prevailing rates) on the amount payable under the
contract to the Contractor will be made by the Employer. Hence, it is the
responsibility of the contractor to pay the GST to the concerned Authority.
43.3 Items of the works for which no rate or price has been entered in will not
be paid by the Employer and shall be deemed covered by other rates and
prices in the Contract.
44. Compensation events
44.1 The following are compensation Events unless they are caused by the
(a) The Employer does not give access to apart of the Site by the site
Possession date stated in Contract data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being
completed beyond the Intended Completion Date then Authority will
approve EOT with eligible contractual price escalation.
45.1 TheratesquotedbytheContractormustbeinclusiveofalltaxesprevailingon
due date of bid submission except GST. However, any subsequent
changes in the tax structure by Government after due date of bid
submission will be compensated (+/-) on availability or submission of
actual documentation. Contractor will have to intimate Engineer regarding
changes occurred in the tax structure after bid submission. If the contractor
fails to provide such information and if any financial obligation may arise
due to change in tax structure, same will be recovered from the contractor.
45.2 GST will be paid separately on the bills. Hence, it is the responsibility of
the contractor to pay the GST to the concerned Authority.
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
Sign. of the Contractor Sign. of the Executive Engineer
47. Price Adjustment
47.1 Contract price shall be adjusted for increase or decrease in rates and price
of labour, materials, fuels and lubricants in accordance with the following
principles and procedures and as per formula given in the contract data:
(a) The price adjustment shall apply for the work done from the start
date given in the contract data up to endofthe initial
intendedcompletion date or extensions granted by the Engineer and
shall not apply to the work carried out beyond the stipulated time for
reasons attributable to the contractor.
(b) The price adjustment shall be determined
N.A. during each month from
the formula given in the contract data.
(c) Following expressions and meanings during to the work done during
R = Total value of work done during the month. It would include the
amount of secured advance granted, if any, during the month less the
amount of secured advance recovered, if any during the month.It will
exclude value for works executed under variations for which price
adjustment will be worked separately based on the terms
mutuallyagreed.
47.2 To the extent that full compensation for any rise or fall in costs to the
contractor is notcovered by the provisions of this or other clause in the
contract, the unit rates and prices included in the contract shall be
deemed to include amounts to cover the contingency of such other rise
or fall in costs.
48.1 The Employer shall retain from each payment due to Contractor the
proportion stated in the Contract Data until Completion of the whole of
48.2 On Completion of the whole of the Works half the total amount retained
48.2 On Completion of the whole of the Works half the total amount retained
is repaid to the Contractor and half when the Defects Liability Period has
passed and the Engineer has certified that all Defects notified by the
Engineer to the Contractor before the end of this period have been
48.3 On completion of the whole works, the contractor may substitute retention
money with an “on demand” Bank guarantee.
Sign. of the Contractor Sign. of the Executive Engineer
In case, Contractor requests for refund of the Retention Money
deducted by the Employer under the provision of this clause, Employer
shall consider the said request of the Contractor provided that the refund
hereunder shall be made in tranches of not less than 1% (One Percent) of
the Contract Price and Contractor furnishes an irrevocable and
unconditional Bank guarantee for an equal amount substantially in the
format of Bank Guarantee for Performance Guarantee enclosed with SBD
and valid up to 60 day beyond the scheduled / extended Defects Liability
Period. On completion of the whole works, the contractor has however an
option to submit a fresh irrevocable and unconditional Bank Guarantee for
an amount equal to 5% of
thetotalvalueofworkexecutedsubstantiallyintheformatofBankGuarantee
forPerformanceGuaranteeenclosedwithSBDandvalidupto60days beyond
the Defect Liability Period and yet refund the Retention Money Bank
Guarantee submitted for refund of Retention Money.
49. Liquidated Damages
49.1 The Contractor shall pay liquidated damages to the Employer at the rate
per day stated in the Contract Data for each day that the Completion Date
is later than the Intended Completion Date (for the whole works or the
milestone as stated in the contract data). The total amount of liquidated
milestone as stated in the contract data). The total amount of liquidated
damages shall not exceed the amount defined in the Contract Data. The
Employer may deduct liquidated damages from payment due to the
Contractor. Payment of liquidated damages does not affect the
Contractor’s liabilities.
49.2 If the Intended Completion Date is extended after liquidated damages
have been paid, the Engineer shall correct any overpayment of
liquidated damages by the Contractor by adjusting the next payment
certificate. The Contractor shall not be entitled for any interest on the
over payment calculated from the date of payment to the date of
49.3 If the contractor fails to comply with the time for completion as
stipulated in the tender, then the contractor shall pay to the employer the
relevant sum stated in the Contract Data as Liquidated damages for such
default and not as penalty for everyday or part of day which shall elapse
between relevant time for completion and the date stated in the taking
over certificate of the whole of the works on the relevant section, subject
to the limit stated in the contract data.
The employer may, without prejudice to any other method of
recovery deduct the amount of such damages from any monies due or to
Become due to the contractor. The payment or deduction of such
damages shall not relieve the contractor from his obligation to complete
Sign. of the Contractor Sign. of the Executive Engineer
the works on from any other of his obligations and liabilities under the
49.4 If, before the Time for Completion of the whole of the Works or, if
applicable any Section, a Taking Over Certificate has been issued for
any part of the Works or of a Section, the liquidated damages for delay
in completion of the remainder of the Works or of that Section shall, for
any period of delay after the date stated in such Taking-Over-Certificate,
and in the absence of alternative provisions in the Contract, be reduced
in the proportion which the value of the part so certified bears to the
value of the whole of the Works or Section, as applicable. The
provisions of this Sub-clause shall only apply to the rate of liquidated
damages and shall not affect the limit thereof.
50.1 If the contractor achieves completion of the whole of the works prior to
the intended Completion Date prescribed in Contract Data the Employer
shall pay to the contractor a sum stated in Contract Data as bonus for
every completed month but subjected to maximum amount as stated
in Contract Data; which shall elapse between the date of completion
of all items of works as stipulated in the contract, including variations
ordered by the Engineer and the time prescribed in Clause
50.2 Bonus shall be paid only to works amounting to above INR 5 crore with
time limit of the works is equal or more than 1 month. The bonus would
be paid as under
%of Time %of Initial Contract
Saved Price entitled for
Less than 10% 0%
51. Advance Payment.
Sign. of the Contractor Sign. of the Executive Engineer
51.1 The Employer shall make advance payment (not to be paid less than two
installments except in special circumstances for which the reason to be
Recorded in writing) to the Contractor of the amounts stated in the
Contract Date by the date stated in the Contract Date, against provision
by the Contactor of an Unconditional Bank Guarantee in a form and by
a bank acceptable to the Employer in amounts and currencies equal to
be at least 110% of the advance payment. The guarantee shall remain
effective until the advance payment has been repaid, but the amount of
the guarantee shall be progressively reduced by the amounts repaid by
the Contractor. The Mobilization advance would be deemed as interest
bearing advance at an interest rate of 10 % to be compounded, quarterly.
51.2 The Contractor is to use the advance payment only to pay for
Equipment, plant and Mobilization expenses required specifically for
execution of the Works. The Contractor shall demonstrate that advance
payment has been used in this way by supplying copies of invoices or
other documents to the engineer.
51.3 The advance payment shall be repaid by deduction proportionate
amount from payments otherwise due to the Contractor, following the
schedule of completed percentages of the Works on a payment basis. No
account shall be taken of the advance payment or its repayment in
assessing valuations of work done, variations, price adjustments,
Compensation Events, or Liquidated damages.
52.1 The performance Security (including additional security for unbalanced
bids) shall be provided to the Employer no later than the date specified
in the Letter of Acceptance and shall be issued in an amount and form
and by a bank or surety acceptable to the Employer, and denominated in
Indian Rupees. The performance Security shall be valid until a date
days from the date of expiry of Defects Liability Period and the
additional security for unbalanced bids shall be valid until a date 28 days
from the date of issue of the certificate of completion.
54. Cost of Repairs.
54.1 Loss or damage to the Works or Materials to be incorporated in the
Sign. of the Contractor Sign. of the Executive Engineer
Works between the Start date and the end of Defects Correction periods
shall be remedied by the Contractor at the Contractor’s cost if the loss
or damages arises from the Contractor’s acts or omissions.
Sign. of the Contractor Sign. of the Executive Engineer
E. FINISHING THE CONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate of
Completion of the works and the Engineer will do so upon deciding that
the work is completed.
56. Taking Over
56.1 The Employer shall take over the Site and the Works within seven days
of the Engineer issuing a certificate of Completion.
57. Final Account
57.1 The Contractor shall supply to the Engineer a detailed final account of
thetotalamountthattheContractorconsiderspayableasfullandfinalsettlem
ent of all claims under the Contract for items before the end of the
Defects Liability Period. The Engineer shall issue a Defect Liability
Certificate and certify any final payment that is due to the Contractor
within 56 days of receiving the Contractor's account if it is correct and
complete. If it is not, the Engineer shall issue within 56 days a schedule
that states the scope of the corrections or additions that are necessary. If
the Final Account is still unsatisfactory after it has been resubmitted, the
Engineer shall decide on the amount payable to the Contractor and issue
a payment certificate, within 56 days of receiving the Contractor’s
revised account.
57.2 If reversal in characteristic of tender(L1becomingL2)on account of
excesses and savings in final account is observed, the
Engineer/Employer shall be at liberty to restrict the final payment of
BOQ items to the lowest amount evaluated of the bids considering the
final quantities and the rates quoted including the rebates if any.
Payment of variation items shall however be made at the rates approved
by the Employer, within 90 days from the physical completion of work.
58. Operating and Maintenance Manuals
58.1 If “as built” drawings and/or operating and maintenance manuals are
required, the Contractor shall supply them by the dates stated in the
58.2 If the Contractor does not supply the Drawings and/or manuals by the
dates stated in the Contract data, or they do not receive the Engineer’s
Sign. of the Contractor Sign. of the Executive Engineer
approval, the Engineer shall withhold the amount stated in the Contract
Data from payments due to the Contractor.
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the other
party causes a fundamental breach of the Contract.
59.2 Fundamental breaches of Contract include, but shall not be limited to
1. The contractor stops work for 28 days when no stoppage of work is
shown on the current programme and the stoppage has not been
authorized by the Engineer
2. The Engineer instructs the Contractor to delay the progress of the
Works and the instructions is not withdrawn within 28 days;
3. The Employer or the Contractor is made bankrupt or goes into
liquidation other than for a reconstructions or amalgamation
4. A payment certified by the Engineer is not paid by the Employer to
the Contractor within 56 days of the date of the Engineer’s certificate
5. The Engineer gives Notice that failure to correct a particular Defect
is a fundamental breach of Contract and the Contractor fails to
correct it within a reasonable period of time determined by the
6. The Contractor does not maintain a security which is required;
7. The Contractor has delayed the completion of works by the number
of days for which the maximum amount of liquidated damages can
be paid as defined in the Contract data; and
8. If the Contractor, in the judgment of the Employer has engaged in
corrupt or fraudulent practices in competing for or in executing the
For the purpose of this paragraph: “corrupt practice” means the
offering, giving, receiving or soliciting of anything of value to influence
the action of a public official in the procurement process or in contract
execution. “Fraudulent practice” means a mis representation of facts in
order to influence a procurement process or the execution of a contract
to the detriment of the borrower, and includes collusive practice among
Bidders (prior to or after bid submission) designed to establish bid prices
at artificial non-competitive levels and to deprive the Borrower of the
benefits of free and open competition.
Sign. of the Contractor Sign. of the Executive Engineer
59.3 When either party to the Contract gives notice of a breach of contract to
the Engineer for a cause other than those listed under Sub Clause
above, the Engineer shall decide whether the breach is fundamental or
59.4 Notwithstanding the above, the employer may terminate the Contract
for convenience.
60. Payment upon Termination
60.1 If the Contract is terminated because of a fundamental breach of
Contract by the Contractor, the Engineer shall issue a Certificate for the
value of the work done less advance payments received up to the date
of the issue of the certificate, less other recoveries due in terms of the
contract, less taxes due to deducted at source as per applicable law and
less the percentage to apply to the work not completed as indicated in
the Contract data. Additional Liquidated Damages shall not apply. If the
total amount due to the Employer exceeds any payment due to the
total amount due to the Employer exceeds any payment due to the
Contractor the difference shall be a debt payable to the Employer.
60.2 If the Contract is terminated at the Employer’s convenience or because
of a fundamental breach of Contract by the Employer, the Engineer shall
issue a certificate for the value of the work done, the cost of balance
material brought by the contractor and available at site, the reasonable
cost of removal of equipment, repatriation of the Contractor’s personnel
employed solely on the works, and the Contractor’s cost of protecting
and securing the Works and less advance payment received up to the
date of the certificate, less other recoveries due in terms of the contract
and less taxes due to deducted at source as per applicable law.
61.1 All materials on the Site, Plant Equipment’s, Temporary Works and
Works are deemed to be property of the Employer, if the Contract is
terminated because of a Contractor’s default.
62. Release from Performance
62.1 If the Contract is frustrated by the outbreak of war of by any other event
Sign. of the Contractor Sign. of the Executive Engineer
entirely outside the control of either the Employer or the Contractor the
Engineer shall certify that the Contract has been frustrated. The
Contractor shall make the Site safe and stop work as quickly as possible
after receiving this certificate and shall be paid for all work carried out
before receiving it and for any work carried out afterwards to which
commitment was made.
Sign. of the Contractor Sign. of the Executive Engineer
F. SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract,
make his own arrangements for the engagement of all staff and labour,
local or other, and for their payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the
Engineer a return in detail, in such form and at such intervals as the
Engineer may prescribe, showing the staff and the numbers of the
several classes of labour from time to time employed by the Contractor
on the site and such other information as the Engineer may require.
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub-
contractor shall abide at all times by all existing labour enactments and
rules made there under, regulations, notification and byelaws of the
State or central Government or local authority and any other labour law
(including rules), regulations, bye laws that may be passed or
notifications that may be issued under any labour law in future either by
the State or the Central Government or the local authority. Salient
features of some of the major labour laws that are applicable to the
construction industry are given below. The Contractor shall keep the
Employer indemnified in case any action is taken against the Employer
by the competent authority on account of contravention of any of the
provisions of any Act or rules made thereunder, regulations or
notifications including amendments. If the Employer is caused to pay or
reimburse, such amounts as may be necessary to cause or observe, or for
observance of the provisions stipulated in the notifications/bye
laws/Acts/Rules/regulations including amendments, if any, on the part
of the Contractor, the Engineer/employer shall have the right to deduct
any money due to the Contractor including his amount of performance
security. The Employer/Engineer shall also have the right to recover
from the Contractor any sum required or estimated to be required for
making good the loss or damage suffered by the Employer.
The employees of the Contractor and the Sub-Contractor in no case
shall be treated as the employees of the Employer at any point to time.
Sign. of the Contractor Sign. of the Executive Engineer
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER
LAWS APPLICABLE TO ESTABLISHMENTS ENGAGED IN
BUILDING AND OTHER CONSTRUCTIONS WORK
A) Workmen Compensation Act 1923:- The Act provides for compensation
incase of injury by accident arising out of and during the course of
B) Payment of Gratuity Act. 1972:- Gratuity is payable to an employee under
the Act on satisfaction of certain conditions on separation if an employee
has completed 5 years service or more on death, the rate of 15 days wages
for every completed year of service. The Act is applicable to all
establishments employing 10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952:-The Act
Provides for monthly contributions by the employer plus workers @ 10%
or 8.33% The benefits payable under the Act are :
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :- The Act provides for leave and some other
benefits to women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970: The Act provides
for certain welfare measures to be provided by the Contractor to contract
labour and in case the Contractor fails to provide, the same are required to
be provided, by the Principal Employer by Law. The principal Employer is
required to take Certificate of Registration and the Contractor is required to
take license from the designated Officer. The Act is applicable to the
establishments or Contractor of Principal Employer, if they employ 20 or
more contract labour.
F) Minimum Wages Act 1948 :-The Employer is supposed to pay not less
than the Minimum Wages fixed by appropriate Government as per
provisions of the Act, if the employment is a scheduled employment.
Construction of Building, Roads, Runways are scheduled employment.
G) Payments of wages Act 1936:-It lays down as to by what date the wages
are to be paid, when it will be paid and what deductions can be made from
the wages of the workers.
H) Equal remunerations Act 1979 :- The Act provides for payment of equal
wages for work of equal nature to Male and Female workers and for not
Sign. of the Contractor Sign. of the Executive Engineer
making discrimination against female employees in the matter of transfer,
training and promotions etc.
I) Payments of Bonus Act 1965:- The Actis applicable to all establishments
employing 20 or more employees. The Act provides for payments of
annual bonus subject to a minimum of 8.33% of wages and maximum of
20 % of wages to employees drawing Rs. 3500/- per month or less. The
bonus to be paid to employees getting Rs, 2500/- per month or above Rs.
3500/- per month shall be worked out by taking wages as Rs.2500/- per
month only. The Act does not apply to certain establishments. The newly
set-up establishments are exempted for five years in certain circumstances.
Some of the State Governments have reduced the employment size from
20 to 10 for the purpose of applicability of this Act.
J) Industrial Disputes Act 1947 :- The Act lays down the machinery and
procedure for resolutions of Industrial disputes, in what situations a strike
or lock-out becomes illegal and what are the requirements for laying off or
retrenching the employees or closing down the establishment.
K) Industrial employment (standing Orders) Act 1946 :- It is applicable to
all establishments employing 100 or more workmen (employment size
reduced by some of the State and Central Government to 50). The Act
provides for laying down rules governing the conditions of employment
by the Employer on matters provided in the Act and get the same certified
by the designated Authority.
L) Trade Unions Act 1926:-The Act lays the procedure for registration of
trade unions of workmen and employers. The Trade Unions registered
under the Act have given certain immunities from civil and criminal
M) Child Labour (Prohibition &Regulation Act 1986 :-The Act prohibits
employment of children below 14 years of age in certain occupations and
process and provides for regulation of employment of children in all other
occupations and processes. Employment of Child labour is prohibited in
Building and Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment &
Conditionsof service) Act 1979:-The Act is applicable to an
establishment which employs 5 or more inter-state migrant workmen
through an intermediary (who has recruited workmen in one state for
employment in the establishment situated in another state).The inter-state
Sign. of the Contractor Sign. of the Executive Engineer
migrant workmen, is an establishment to which
thisActbecomesapplicable,arerequiredtobeprovidedcertainfacilitiessuchas
housing, medical aid, traveling expenses from home up to the
establishment and back, etc.
O) The Building and Other Construction workers(Regulation of
employmentand Conditions of Service) Act 1996 and the Cess Act of
1996:-All the establishments who carry on any building or other
constructions work and employ 10 or more workers are covered under this
All such establishments are required to pay cess at the rate not exceeding
2% of the cost of construction as may be modified by the government. The
Employer of the establishment is required to provide safety measures at
the Building or construction work and other welfare measures, such as
canteens, First Aid facilities, Ambulance, Housing accommodations for
workers near the workplace etc. The Employer to whom the Act applies
has to obtain a registration certificate from the Registering Officers
appointed by the Government.
P) Factories Act 1948 :-The Act lays down the procedure for approval of
plans before setting up a factory, health and safety provisions, welfare
provisions, working hours, annual earned leave and rendering information
regarding accidents or dangerous occurrences to designated authorities. It
is applicable to premises employing 10 persons or more with aid of power
or 20 or more persons without the aid of power engaged in the
manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent
authority as per rule. The royalty charges paid shall be borne by the
contractor and shall not be reimbursed by the Employer.
R) Following Pollution control Acts and amendments made there of from
time to time shall be applicable.
1. Water (Preservation and control of Pollution)Act,1974
2. Air (Prevention and Control of Pollution Act1981
3. Environmental (Protection)Act1986
The contractor must commit to adopting Environmental management
plan for best energy use, waste management, the reduction of pollution as
in EMS (Environmental Management system)ISO-14001-
65. ARBITRATION (GCCClause24)
The procedure for arbitration will be as follows:-
Sign. of the Contractor Sign. of the Executive Engineer
24.1 If the Contractor is of the view that a decision taken by the Engineer was
either outside the authority given to the Engineer by the Contract or that
the decision was wrongly taken, the decision shall be referred to
#Superintending Engineer (Higher Authority) within 14 days of the
notification of the Engineer's decision. If the issue is not resolved, any
party can refer the matter for conciliation within 15 days from the
decision given by the #Superintending Engineer.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied
with the decision of the #Superintending Engineer, both the parties
have to refer to the #Chief Engineer concerned for the conciliation
(b) For the work more than Rs.100 Cr., if any of the parties is not
satisfied with the decision of the Superintending Engineer, both
parties have to refer to the #Secretary, Roads & Building
Department, Government of Gujarat for the conciliation process.
If the dispute is not resolved through the conciliation process,
contractor may refer the dispute to Gujarat Public Works Contract
Dispute Arbitration Tribunal. If the Contractor fails to refer a claim/
dispute to the Higher Authority within 14 days of the notification of
the Engineer's decision, the Contractor shall not be entitled to any
additional payment/claim if he doesn’t follow the above sequence in
stipulated time. However, during such period, he would not stop the
work in any case.
Sign. of the Contractor Sign. of the Executive Engineer
Sign. of the Contractor Sign. of the Executive Engineer
Clause Reference With respect To section
Item marked “N/A” do not apply to this Contract.
1. The Employers is [CL.1.1]
Name: Executive Engineer, Ver-2 Project Division, Vyara
Address: Executive Engineer, Ver-2 Project Division, Vyara,
Dist-Tapi, Surat-Dhulia Road, Opposite of Judge Bunglow.
Name of authorized Representative(will be intimated later)
2. The Engineer is The Executive Engineer, Ver-2 Project
Division, Vyara
Name of Authorized Representative: Deputy Executive
Engineer, Ver Project Sub Division No. 1, Chopadvav.
3. The Defects Liability Period is 12(Twelve) Months from the [CL.1.1&33]
date of completion.
4. The Start Date shall be 1stdays for the date of issue of the [CL.1.1]
Notice to proceed with the work.
5. The Intended Completion Date for the whole of the work is 3 [CL.1.1,17&2]
(three) Month after start of work.
Physical works to be completed Period from the start date
Milestone i.e. 100% 3 Month.
6. The Site is located at KodbA Village,Chopadvav Dam , [CL.1.1]
Sagbara Taluka of Narmada District.
7. The name and identification number of the Contract is: [CL.1.1]
8. The works consist of Clearing the Vegitation growth on earthen [CL.1.1]
Dam and Dam Colony of Chopadvav Irrigation Scheme
The works shall ,interalia ,include the following, as Specified or
Sign. of the Contractor Sign. of the Executive Engineer
Site clearance; setting – out and layout; Construction and Maintenance of all types
of dams and its component, earthen dam; spillway; installation of gate; excavation
and earth work, approach road, Inspection Bunglows, checkdams, bandhara, T.R.,
weir, barrages, Flood Protection & Anti Sea Erosion work, canal lining and
structures, CD Works, structure repairing, Jungle cutting, Desilting, etc. other WRD
For this workExcavation for Foundation in soil, soft rock and hard rock, drilling
holes and providing and laying concrete, supplying and laying gabion, providing
sand layer below gabion, providing weep holes, providing sand filter diversion of
river during construction work, etc.
(B) Road Works :
Site clearance; setting out and layout widening of existing carriageway and
strengthening including camber corrections; construction of new road/ Parallel
service road; bituminous pavements remodeling/construction of Junctions,
intersections, bus bays, lay-bays; supplying and placing of drainage Channels,
flumes, guard posts and guard other related items; construction/extension of cross
drainage works, bridge, approaches and other related stones; protective works for
E.E. of various components of the works;
roads/bridge; all aspects of quality assurance
rectification of The defects in the completed works during the Defects Liability
Period; submission of “As- built’’ drawings and any other related documents; and
other item of work as may be required to be carried out for completing the work in
accordance with the drawings and the provisions of the contract and to ensure
(C ) Bridge Works
Provision of foundations, piers abutments and bearing; prestressed/reinforced
cement concrete superstructure; wearing coat, hand railings, expansion joints,
approach slabs, drainages spouts/ downtake pipes, arrangements for fixing light
posts, water mains, utilities etc; provision of suitably designed protective works;
providing wing/return walls; provision of road markings, road signs etc.; all aspects
of quality assurance; clearing the site and
E.E.handing over the works on completion;
rectification of the defects during the Defects Liability Period and submission of
“As-built” drawings and other related documents; and other items of work as may
be required to be carried out for completing the works in accordance with the
drawings and the provisions of the contract and to Insure safety
Sign. of the Contractor Sign. of the Executive Engineer
(D ) Other items
Any Other Items as required to fulfill all contractual obligations
as per the Bid documents.
10. The following documents also form part of the Contract:
Asperclause2-3 Addendum/Corrigendum/undertaking given by [CL.2.3(9)
contractor (If any)
11. The law which applies to the Contract is the law of Union of India [CL.3.1]
12. The language of the Contract documents is English [CL.3.1]
13. Limit of subcontracting 25% of the Initial Contract Price [CL.7.1]
14. The Schedule of Other Contractors [CL.8]
15. The Schedule of Key Personnel As per Annex–II to Section I [CL.9]
16. The minimum insurance cover for physical property, injury and [CL13]
death is Rs. 5 lakhs per occurrence with the number of
occurrences limited to four. After each occurrence, the contractor
will pay an additional premium necessary to make insurance valid
for four occurrences always.
17. Site Investigation report [CL.14]
18. The Site Possession dates shall be Available from 1stday of Work Order
19. The period for submission of programme for approval of the [CL.27.1]
engineer shall be 21 days from the issue of Letter of Acceptance.
20. The period between program updates will be 30 days. [CL.27.3]
Sign. of the Contractor Sign. of the Executive Engineer
21. The amount to be withheld for late submission of an updated programme shall be
Rs 2.00 lakhs[CL.27.3]
22. Testing Charges ................... Not Applicable …………… [CL.44]
23. The following events shall also be Compensation Events
Substantially adverse ground conditions encountered during the course of
execution of work not provided for in the bidding
(i) Removal of underground utilities detected subsequently
(ii) Significant changes in classification of soil requiring additional
mobilization by the contractor ,e.g. ordinary soil to rock excavation,
(iii) Removal of unsuitable material like marsh, debris dumps, etc. not caused
by the contractor.
(iv) Artesian conditions
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(vii) Presence of historical, archeological or religious structures, monuments
interfering with the works
(viii) Restriction of access to ground imposed by civil, judicial, or military
24. The currency of the Contract is Indian Rupees [CL. 46]
25. The formula (e) for adjustment of prices are as under:
If any of the commodities like Cement, Steel or Bitumen are not found applicable
in a work, the weight component of that commodities {i.e. ‘Cement’ (Pc), ‘Steel’
(Ps) or ‘Bitumen' (Pb) as indicated in SBD for the purpose of Price Adjustment}
shall be clubbed with the weight component of ‘Other Material’ (Pm), such that the
gross % weight of the components shall remain as 100% .
R = value of work as defined in Clause 47.1 of Conditions of Contract
Adjustment for labour component N.A.
(i) Price adjustment for increase or decrease in the cost due to labour shall be paid
in accordance with the following formula:
VL = Increase or decrease in the cost of work during the month
under consideration due to changes in rates for local labour
L0 = The consumer price index for industrial workers for the State
on 28 days preceding the scheduled date of opening of
technical Bids as published by Labour Bureau, Ministry of
Labour, Government of India
Sign. of the Contractor Sign. of the Executive Engineer
Li = The consumer price index for industrial workers for the State
for the month under consideration as published by the
Labour Bureau, Ministry of Labour, Government of India.
Pl = Percentage of labor component of the work
Adjustment for cement component.
Pricesadjustmentforincreaseordecreaseinthecostofcementprocuredbyth
Vc=0.85x(Pc/100)xRx(Ci–C0)/C0
Vc=Increase or decrease in the cost of work during themonth under
consideration due to changes in ratesforcement.
C0=The allIndiawholesale price index for
OrdinaryPortlandCementon28daysprecedingthescheduleddateofopeni
ngoftechnicalbidaspublishedbytheOfficeoftheEconomicAdviser,
Department for Promotion of Industry and
InternalTrade,Ministry ofCommerce &Industry.
Ci =The all India average wholesale price index for Ordinary Portland
Cement for the month under consideration as published by Office
of the Economic Adviser,Department for Promotion of
Industry and Internal Trade,E.E.Ministry of Commerce &
Pc=Percentageofcementcomponentofthework
Adjustmentforsteel component
(iii) Priceadjustmentforincreaseordecreaseinthecostofsteelprocuredbythe
contractor shall be paid in accordance with the following formula
Vs=Increase or decrease in the cost of work during the month under
consideration due to changes in the rates for steel
So=TheallIndiawholesalepriceindexforsteel(MildSteel-LongProducts
Rebars, Steel flats) on 28 days preceding the date of opening of Bids
as published by the Office of the Economic Adviser, Department
for Promotion of Industry and Internal Trade, Ministry of
Commerce & Industry.
Sign. of the Contractor Sign. of the Executive Engineer
Si=The all India average wholesale price index for steel (Mild Steel -
Long Products Rebars ,Steel flats) for the month under
consideration as published byOffice of the Economic Adviser,
Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Ps=Percentageofsteelcomponentofthework
Note:Fortheapplicationofthisclause,theindexofMildSteel-Long
productsRebars, Steel
flatshasbeenchosentorepresentthesteel group.
Adjustmentsofbitumencomponent
(iv) Priceadjustmentforincreaseinthecostofbitumenshallbepaidin
accordance with the following formula
Vb=Increaseordecreaseinthecostofworkduringthemonthunder
consideration due tochangesin rates for bitumen.
Bo= The official retail price of bitumen at the IOC depot at the
nearest centre on the day 28 days prior to the scheduled date
ofopening of technical bid. E.E.
Bi=The official retail price of bitumen of IOC depot at the nearest
centre for the 15thday of the month under consideration.
Pb=Percentageofbitumencomponentofthework
AdjustmentofPOL(fuelandlubricant)component
(v) Price adjustment for increase or decrease in cost of POL (fuel and
lubricant) shall be paid in accordance with the following formula
Vf=0.85x(Pf/100)xRx(Fi–F0)/F0
Vf=Increaseordecreaseinthecostofworkduringthemonthunder
consideration due to changes in ratesfor fuel and lubricants.
Fo=The official retail price of High Speed Diesel (HSD) at the
existing consumer pumps of IOC at the nearest centre on the day
28 prior tothe date of opening of Bids.
Sign. of the Contractor Sign. of the Executive Engineer
Fi=The official retail price of HSD at the existing consumer
pumps of IOC at the nearest centre for the 15thdayof the month
of the under consideration.
Pf=Percentageoffuel andlubricantscomponentofthework
Note: For the application of this clause, the price of High-Speed diesel
Oil has been chosen to represent the fuel and lubricants group .
AdjustmentforConstructionMachinery
(vi) Price adjustment for increase or decrease in the cost of plant and
Machinery spare procured by the Contractor shall be paid in
accordance with the following formula
Vp=0.85x(Pp/100) xRx(Pi–P0)/P0
Vp=Increaseordecreaseinthecostofworkduringthemonthunder
considerationduetochangesinratesforplantandmachineryspares
P0= The all India wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the
month under consideration as published Office of the Economic
Adviser, Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Pi= The all India average wholesale price index for
manufacturer of machinery for mining, quarrying and
Construction for the month under consideration as published
Office of the Economic Adviser, Department for Promotion
of Industry and Internal Trade, Ministry of Commerce &
Pp=Percentageofplantandmachinerysparescomponentofthework.
Note:Fortheapplicationofthisclause,indexofHeavyMachineryandparts
has been chosen to represent the Plant and Machinery Spares
Sign. of the Contractor Sign. of the Executive Engineer
AdjustmentofothermaterialsComponent
(vii) Price adjustment for increase or decrease in cost of local materials other than
cement, steel, bitumen and POL procured by the contractor shall be paid in
accordance with the following formula
Vm=Increase or decrease in the cost of work during the month under
consideration due to change in rates for local materials other than cement,
steel, bitumen and POL. N.A.
M0= The all India wholesale price index (all commodities)on 28 days
preceding the scheduled date of opening
of technical Bids, as published by
the office of the economic advisor, department for promotion of industry and
internal trade, ministry of commerce and industry.
Mi=The all India wholesale price index (all commodities) for the month
under consideration as published by the office of the economic advisor,
department for promotion of industry and internal trade, ministry of
commerce and industry.
Pm=Percentageoflocalmaterialcomponents(otherthancement, steel, bitumen
and POL) of the work.
The following percentage will governthepriceadjustmentforthe
entire contract:
6. Plant&MachinerySparesPp ....................0.00%
25. The proportion of payments retained (retention money) shall be
6%{CL.48} from each bill subject to a maximum of 5% of final contract
26. Amount of Liquidated damages For Whole of work {CL.49}
delay in completion of works (1/2000)thof the Initial contract
price, rounded off to the nearest Thousand, per day. For
sectional Completion (wherever specified In item 6 of Contract
data)(1/2000)th of initial contract price for #5 km Section,
rounded off to the nearest thousand per day.
Sign. of the Contractor Sign. of the Executive Engineer
27. Maximum limit of liquidated damages 10 percent of the Initial{CL. 49}
For delay in completion work Contract Price rounded off to
The nearest thousand
28. Amount of Bonus for early completion Amount of bonus for early
Completion of work shall be
given as per CL.50 of Section-
29. Maximum limit of bonus for early 5 percent of the
Contract{CL.50} Completion of work Price
30. The amount of the advance payment are:{CL. 51&52}
#Nature of Advances
Amount(Rs.)Conditio
nsto Be fulfilled
i Mobilization10% of the contract
Onsubmissionofuncondition
al Price Bank Guarantee. (to be
before the end of 20% of the
contract period). The
mayfurnishfourbankguarantees
of 2.5 % of each valid for the
ii Equipment 90% for new and 50% Afterequipmentisbroughttosite
of depreciated value for (provided the Engineer is
old equipment. Total satisfied That the equipment is
amount will be subject required for performance of the
to a maximum of 5% of contract) and on submission of
the Contract Price unconditionalBankGuaranteef
amountof advance
iii Secured Deleted
Sign. of the Contractor Sign. of the Executive Engineer
(TheadvancepaymentwillbepaidtotheContractornolaterthan28daysafter fulfillment of the
above conditions).
31. Repaymentofadvancepaymentformobilizationandequipment{CL.51.3}
The advance loan shall be repaid with percentage deduction from the
interim payments certified by the Engineer under the Contract. Deduction
commenceinthenextInterimPaymentCertificatefollowingthatinwhichthetot
al of all such payments to the Contractor has reached not less than
percent of the Contract Price or 1 (one) month from the date of payment of
first installment of advance, whichever period concludes earlier, and shall
be made at the rate of 20 percent (collectively for both Mobilization
Advance andEquipment Advance)of the amounts of all Interim Payment
Certificate until such time as the loan has been repaid, always provided that
the loan shallbe
completelyrepaidpriortotheexpiryoftheoriginaltimeforcompletionpursuant
to Clause 17 and
33. The securities shall be for the following minimum amounts equivalent
{CL.52} As a percentage of the Contract Price:
Performance Security for 5 percent of contract price (Rs.2049883.00) plus
Rs. …………….. (to be decided after evaluation of the bid) as additional
security in terms of ITB Clause
The standard form of Performance security acceptable to the Employer
shall be an unconditional Bank Guarantee of the type as presented in
Section 8 of the Bidding Documents.
34. The Schedule of Operating and maintenance Manuals…..N/A. {CL. 58}
35. The date by which “as– built” drawings (in scale as directed) in 2 sets{CL.
58} are required within 28 days of the issue of certificate of completion of
the whole or section of the work, as the case may be.
36. The amount to be withheld for failing to supply “as built” drawings {CL.
58} by the Date required is Rs.2.0 Lakhs.
Sign. of the Contractor Sign. of the Executive Engineer
37. The following events shall also be fundamentals breach of
contract:{CL.59.2} “The Contractor has contravened Sub- clause 7.1 and
Clause 9 of GCC”
38. The percentage to apply the value of the work not completed
representing{Cl60} the Employer’s additional cost for completing the
Works shall be 20 per cent.
Sign. of the Contractor Sign. of the Executive Engineer
TECHNICAL SPECIFICATION
----- Attached separately -----
Sign. of the Contractor Sign. of the Executive Engineer
Sign. of the Contractor Sign. of the Executive Engineer
Description of the Works:
Clearing the Vegitation growth on earthen dam of Kakdiamba Irrigation
1. We offer to execute the Works described above and remedy any defects
therein in conformity with the conditions of Contract, specification, drawings,
Bill of Quantities and Addenda for the sum (s) of
2. We undertake, if our Bid is accepted, to commence the Works as soon as is
reasonably possible after the receipt of the Engineer’s notice to commence,
and to complete the whole of the Works in the Contact within the time stated
in the document.
3. We agree to abide by this Bid for the period of 120 Days from the date fixed
for receiving the same, and it shall remain binding upon it and may be
accepted at any time before the expiration of that period.
4. Unless and until a formal Agreement is prepared and executed this Bid,
together with your written acceptance thereof, shall constitute a binding
contract between us.
5. We understand that you are not bound to accept the lowest or any tender you
-------duly authorized to sign bids for and on behalf of-----------------------
(in block capitals or typed)
Sign. of the Contractor Sign. of the Executive Engineer
Sign. of the Contractor Sign. of the Executive Engineer
BILL OF QUANTITIES
Sign. of the Contractor Sign. of the Executive Engineer
BILL OF QUANTITIES
(A) Percentage Rate Tender( Upto INR 50Cr.)
:: SCHEDULE -B ::
( For Contractor)
Name Of Work:- Clearing the Vegitation growth on earthen Dam and Dam Colony of Chopadvav Irrigation Scheme
Quantities Rate
Item estimated but
Item of work Unit Amount
No. may be more In Fig. In Words
Dismentalling the rubble pitching including sorting
out and stacking of the useful materials on site Rupees One
including removing the rubbish etc. complete as Hundred Sixteen
directed. and fifty Paise
(B) Dismentalling dry rubble pitching. Only
(c) 45 cm thick.
Clearing the canal land width including removing
the shrub, bushes, cactus, weeds other vegetation
Rupees fourteen
including cutting down trees upot 0.50cm girth and
2 21725.00 14.60 and Sixty Paise SM
depositing the removed materials outside the canal
land width up to lead of 50 meter as directed etc.
complete. (Without water pool)
Re-arranging the disturbed rubble rip rap on
upstream slope of earthen dam in correct slope in Rupees Sixty-
3 4074.00 following thickness including necessary packing to 68.00 SM
the required depth etc.complete.
(B) For 45 cm thickness
Providing videography on the ocassion of function or Rupees One
for on going construction work including Thousand Two
4 dubbing,titeling etc. complete including cost of 1230.51 Hundred Thirty 4 Hrs
cassette/CD and fifty-one
(b) Up to 4.00 hours Paise Only
Sign. of the Contractor Sign. of the Executive Engineer
I/We am/ are willing to carry out the work at… ................ %above/below percent (Should be written in figures and words) of the estimated
rate mentioned above. Amount of my/our tender works out as under.
Estimated amount put to tender Rs. 10,70,068.51 Estimated amount put to tender Rs.
Deduct………%below Add………%Above
In words In words
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which
no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rulesi.e.1%of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the
cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all
Deputy Executive Engineer, Divisional Accountant, Executive Engineer,
Ver Project Sub Dn.No-1 Ver-II Project Division Ver-II Project Division
Chopadvav Vyara Vyara
Sign. of the Contractor Sign. of the Executive Engineer
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to
Bidder, Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional,
and are given to provide a common basis for bidding. The basis of payment
will be the actual quantities of work ordered and carried out, as measured
by the Contractor and verified by the Engineer and valued at the rates and
prices tendered in the priced Bill of Quantities, where applicable, and
otherwise at such rates and prices as the Engineer may fix within the terms
of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except
in so far as it is otherwise provided under the Contract, include all
constructional plant, layout, supervision, materials, erection, maintenance,
insurance, profit, taxes and duties, together with all general risks, liabilities
and obligations set out or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities,
whether quantities are stated or not. The cost of Items against which
Contractor has failed to enter a rate or price shall be deemed to be covered
by other rates and prices entered in the Bill of Quantities (in case of Item
rate contract).
6. The whole cost of complying with the provisions of the Contract shall be
included in the items provided in the priced Bill of Quantities, and where
no Items are provided the cost shall be deemed to be distributed among the
rates and prices entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates
or prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications
for building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
Sign. of the Contractor Sign. of the Executive Engineer
10. Rock is defined as all materials which, in the opinion of the Engineer,
required blasting, or the use of metal wedges and sledgehammers, or the
use of compressed air drilling for its removal, and which cannot be
extracted by ripping with a tractor of at least 150 kw with a single rear
mounted heavy duty ripper.
(B) For Item Rate Tender(For above INR 50Cr.):
Ite Description of Item Quantity Unit Rat Amount
m (with brief e
No specification In In
andreferencetobookof
specifications)
(A)TotalTenderedAmount
(B)Rebateonabovetenderedamount(ifany)%(infigure)……………………
(C)NetTenderedAmount(A-B)(infigure)………………………………
1 The Contractor shall exhibit a board with detailed specification and details of
work as directed by the Engineer-In-Charge for which no extra payment shall be
2 The labour cess will be deducted as per prevailing rulesi.e.1%of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been
taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/C
Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a
change as per actual mix design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate of input rate
mentioned in all the tender.
Sign. of the Contractor Sign. of the Executive Engineer
SECURITIES AND OTHER FORMS
Sign. of the Contractor Sign. of the Executive Engineer
BID SECURITY (BANK GUARANTEE)
WHEREAS, ---------------------------------------- (name of Bidder) (hereinafter
called the “The Bidder”) has submitted his bid Dated ------------------------
(Date) for the construction of -------------(Name of Contractor hereinafter
called “the Bid”)
KNOW ALL PEOPLE by these presents that We--------------------------------------
(name of Bank)of --------------------------------------(name of country)having our
registered office at-------------------------------------------------------(here in after
called “the bank”)are bound unto--------------------------------------------(name of
(here in after called “The Employer”)in the sum of ------------------------------ *
For which payment well and truly to be made to the said Employer the Bank
itself, his successors and assigns by these presents.
SEALED with the Common Seal of the said Bank this---------------------- day of
THE CONDITIONS of these obligations are:
(1) If after Bid opening the Bidder with draws his bid during the period of Bid
validity specified in the Form of Bid;
(2) If the Bidder has been notified of the acceptance of his bid by the Employer
during the period of Bid Validity:
A Fails or refuses to execute the Form of Agreement in accordance with
the Instructions to Bidders, if required; or
B. Fails or refuse to furnish the Performance Security, in accordance with the
Instructions to Bidders; or
C. does not accept the correction of the Bid Price pursuant to Clause27
(Correction of Errors)
Sign. of the Contractor Sign. of the Executive Engineer
We undertake to pay to the Employer up to the above amount
upon receipt of his first written demand, without the employer having to
substantiate his demand, provided that in his demand the Employer will
note that the amount claimed by him is due to him owing to the occurrence
of one or any of the three conditions, specifying the occurred conditions
This Guarantee will remain in force up to and including the date --------- **
days after the deadline for submission of Bids as such the deadline is stated
in the Instructions to Bidders or as it maybe extended by the Employer,
notice of which extension (s) to the Bank is hereby waived. Any demand in
respect of this guarantee should reach the Bank not later than the above date
(Signature, name and address)
* The Bidder should insert the amount of the guarantee in words and figures
denominated in Indian Rupees. This figure should be the same as shown
in Clause 16.1(Bid Security) of the Instructions to Bidders.
**1 (one) Month after the end of the validity period of the Bid. Date
should be inserted by the Employer before the Bidding documents are
Sign. of the Contractor Sign. of the Executive Engineer
PERFORMANCE SECURITY
of contractor) (hereafter called “the Contractor”) has undertaken, in pursuance
of Contracts No. ------------------------- dates -------------------------- to execute ---
----------------------- (name of Contract and brief description of Works)
(hereinafter called “The Contract”)
AND WHEREAS it has been stipulated by you in the said Contract that
the Contractor shall furnish you with a Bank Guarantee by a recognized bank
for the sum specified therein as security for compliance with his obligation in
accordance with the Contract.
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and
responsible to you on behalf of the Contractor, up to a total of-------------------
----------------(amount of guarantee)*(in words),such sum being payable in
types and proportions of currencies in which the Contract prices is payable,
and we undertake to pay you, upon your first written demand and without cavil
or argument, any sum or sums within the limits of--------------------------------
(amount of guarantee) as aforesaid without your needing to prove or to show
grounds or reasons for your demand for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from
The contractor before presenting is with the demand.
We further agree that no change or addition to or other modification of the
terms of the Contract to of the Works to be performed thereunder or of any of
the Contract documents which may be made between your and the Contractor
shall in any way release us from any liability under this guarantee, and we
hereby waive notice of any such charge, addition or modifications.
This guarantee shall be valid until 60 days from the date of expiring of
the Defect Liabilities period.
Signature and Seal of the guarant or-------------------------
*An amount shall be inserted by the Guarant or ,representing the percentage the
Contract price specified in the Contract denominated in Indian Rupees.
Sign. of the Contractor Sign. of the Executive Engineer
ADDITIONAL PERFORMANCE SECURITY
[Clause34.1.(A)]
of contractor) (hereafter called “The Contractor”) has undertaken, in pursuance
of Contracts No. ------------------------- dates -------------------------- to execute ---
----------------------- (Name of Contract and brief description of Works)
(hereinafter called “The Contract”)
AND WHEREAS it has been stipulated by you in the said Contract that
the Contractor shall furnish you with a Bank Guarantee by a re cognized bank
for the sum specified therein as security for compliance with his obligation in
accordance with the Contract.
AND WHEREAS we have agreed to give the Contractors such a bank Guarantee:
NOW THEREFORE we hereby affirm that we are the Guarantor and
responsible to you on behalf of the Contractor, up to a total of-------------------
-----------------(amount of guarantee)(in words),such sum being payable in
types and proportions of currencies in which the Contract prices is payable,
and we undertake to pay you, upon your first written demand and without cavil
or argument, any sum or sums within the limits of---------------------------------
------------(amount of guarantee) as aforesaid without your needing to prove or
to show grounds or reasons for your demand for the sum specified therein.
We here by waive the necessity of your demanding the said debt from the
contractor before presenting is with the demand
We further agree that no change or addition to or other modification of the
terms of the Contract to of the Works to be performed thereunder or of any of
the Contract documents which may be made between your and the Contractor
shall in any way release us from any liability under this guarantee, and we
hereby waive notice of any such charge, addition or modifications.
This guarantee shall be valid until 28 days from the project completion date.
Signature and Seal of the guarantor--------------------------
Sign. of the Contractor Sign. of the Executive Engineer
BANKGUARANTEEFORADVANCEPAYMENT
InaccordancewiththeprovisionsoftheConditionsofContract,sub-clause
51.1(“Advance Payment”) ofthe abovementionedContract,-------------------------------
------------------- (name and addressofContractor)(hereinaftercalled ---------- “the
Contractor”)shalldepositwith (nameof
Employer)abankguaranteehisproperandfaithfulperformanceunderthesaid
ClauseoftheContractinanamountof----------------------------------- (amount ofGuarantee)*-
We,the ----------------------------------- (bankoffinancialinstitution),asinstructed
by the Contractor, agree unconditionally and irrevocably to guarantee as primary obligator
and not as Surety merely, the payment to ---------------------------------------- (name of
Employer) on his first demand without whatsoever rightof obligation on
ourpartandwithouthisfirstclaimtotheContractor, intheamountnotexceeding---
We further agree that no change or addition to or other modifications of the terms of the
Contractor or Works to be performed thereunder or of any of the Contract documents which
may be made between --------------------------------- (name of Employer) and the Contractor,
shall in any way release us from any liability under this guarantee, and we hereby waive
notice of any such change, addition or modifications.
This guarantee shall remain valid and in full effect from the date of the advance
payment under the Contract until -------------------------------------- (name of employer)
receives full repayment of the same amount from the contractor.
Signature and Seal Name
of Bank/ Financial Institution
*AnamountshallbeinsertedbythatBankorFinancialInstitutionrepresentingthe amount of the
Advance Payment, and denominated in Indian Rupees.
Sign. of the Contractor Sign. of the Executive Engineer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01. Jungle cutting Chopadvav Checklist.pdf
02. Clearing the Vegitation Chopadvav Irrigation Scheme SBD.pdf
03. Technical Specification Clearing Dam Jungle Chopadvav Dam 2025.pdf
B.O.Q - Jungle cutting Chopadvav.pdf
E Tender Notice No.21 of 2025-26.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .