Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹10.9 L+₹16,661.82 (1.56%)Rejected-AOC | L2 | Rejected-AOC Second lowest | |
| 3 | L3₹12.3 L+₹1.6 L (15.0%)Rejected-AOC | L3 | Rejected-AOC Third lowest | |
| 4 | L4₹27.9 L+₹17.2 L (160.7%)Rejected-AOC | L4 | Rejected-AOC Fourth lowest |
Tender Value
₹10.7 L
EMD Value
₹26,724
Closing Date
24 Dec 2019, 3:00 pmClosed
Assistant Executive Engineer Building Sub Division
Office of the Assistant Executive Engineer Buildings Sub Division, Neyyattinkara
Providing fencing to existing compound wall on Goat farm, Parasuvaikkal
2019_PWD_328450_1
PWD/2019-2020/3523/NTABLSdn
Open Tender
Civil Works - Buildings
Item Rate
90 days
Parasuvaikkal
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
online
₹26,724
Yes
13 Jan 2020
10 Dec 2019
27 Dec 2019
10 Dec 2019
24 Dec 2019
10 Dec 2019
Amount
DETAILED ESTIMATE
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area clearedClearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
7.8.1 : Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level.Masonry work (first sort), in cement mortar 1:6 (1 cement : 6 coarse sand)
4.2.3 : Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
15.34.1 : Dismantling and stacking with in 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of :T or L iron or pipe
15.36 : Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead.Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead.
6.4.1 : Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in:Cement mortar 1:4 ( 1 cement : 4 coarse sand)
15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
16.18.1 : Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
16.19 : Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
13.4.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
13.46.1 : Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
13.61.1 : Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
SURESHKUMAR.K.R
VIJAYAKUMAR D
SUNIL.PB
Bidder Name
SUNIL.PB
SURESH KUMAR G S
SURESHKUMAR.K.R
VIJAYAKUMAR D
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_456059.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .