| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | ₹1.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹1.6 L+₹1,098.28 (0.71%)Rejected-Finance | ₹1.6 L+₹1,098.28 (0.71%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | VINOD KUMAR GOVT CONTRACTOR L2 | VED RAJ NEGI L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation in foundations trenches etc. in all kind of soil in all leads and lifts such as pick work, jumper work in saturated /un saturated soil including bailing out water, blasting work in hard/soft rock or chiseling in hard/soft rock where blasting is prohibited in all leads and lifts stacking the excavated earth more than 3mtr.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and disposing of all surplus excavated earth as directed within all leads and lifts and handing over the usable materials available from excavation to department free of cost as per direction of Engineer-in-Charge within all leads and lifts. | 6.46 | Cum | 390 ₹2,519.4 Lowest | 395 ₹2,551.7 |
| 2.00 | Providing and laying cement concrete 1:6:12 (1cement: 6 sand: 12 graded stone agg.40mm nominal size) and curing complete excluding cost of centering and shuttering including all leads and lifts. a) Foundation and plinth. | 0.88 | Cum | 6,521 ₹5,738.48 | 6,500 ₹5,720 Lowest |
| 3.00 | Random Rubble Masonary / Polygonal rubble masonary brought two coat with hard stone of approved quality in foundation and plinth including levelling up cement concrete 1:6:12 ( 1cement: 6 sand:12 aggregate )in plinth level/ super structure complete in all respect within all lead and lifts as per the direction of Engineer-in-Charge. | 11.95 | Cum | 6,745 ₹80,602.75 Lowest | 6,750 ₹80,662.5 |
| 4.00 | Wire crate made of interlink chain filled with boulder with square cut faces against the wire ( Boulder filling to be measured and paid separately) interlinked chain 5mm thick corresponding to SWG. 6 (15cmX 15cm) mesh as per the direction of Engineer-in-Charge. (TR) | 78.13 | Sqm | 290 ₹22,657.7 | 285 ₹22,267.05 Lowest |
| 5.00 | Wire crate made of Interlink chain filled with boulders with square cut faces against the wire (Wire crate to be measured and paid for separately)in all leads and lifts as per the direction of Engineer-in-Charge. | 19.53 | Cum | 2,240 ₹43,747.2 | 2,200 ₹42,966 Lowest |
Tender Value
₹1.5 L
EMD Value
₹3,082
Closing Date
8 Apr 2026, 5:00 pmClosed
E.E. JSV Division Anni
E.E. JSV Division Anni
SH Co Retaining wall 6.50 mtrs, Edge wall 4.30 mtrs. and Crate wire work Under PDNA.
2026_HPIPH_133219_1
1-50
Open Tender
Civil Works
Item Rate
60 days
Nirmand
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹3,082
20 Jul 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
8 Apr 2026
2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundations trenches etc. in all kind of soil in all leads and lifts such as pick work, jumper work in saturated /un saturated soil including bailing out water, blasting work in hard/soft rock or chiseling in hard/soft rock where blasting is prohibited in all leads and lifts stacking the excavated earth more than 3mtr.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and disposing of all surplus excavated earth as directed within all leads and lifts and handing over the usable materials available from excavation to department free of cost as per direction of Engineer-in-Charge within all leads and lifts. | - | Cum | - | - |
| 2 | Providing and laying cement concrete 1:6:12 (1cement: 6 sand: 12 graded stone agg.40mm nominal size) and curing complete excluding cost of centering and shuttering including all leads and lifts. a) Foundation and plinth. | 1 | Cum | - | - |
| 3 | Random Rubble Masonary / Polygonal rubble masonary brought two coat with hard stone of approved quality in foundation and plinth including levelling up cement concrete 1:6:12 ( 1cement: 6 sand:12 aggregate )in plinth level/ super structure complete in all respect within all lead and lifts as per the direction of Engineer-in-Charge. | 1 | Cum | - | - |
| 4 | Wire crate made of interlink chain filled with boulder with square cut faces against the wire ( Boulder filling to be measured and paid separately) interlinked chain 5mm thick corresponding to SWG. 6 (15cmX 15cm) mesh as per the direction of Engineer-in-Charge. (TR) | 1 | Sqm | - | - |
| 5 | Wire crate made of Interlink chain filled with boulders with square cut faces against the wire (Wire crate to be measured and paid for separately)in all leads and lifts as per the direction of Engineer-in-Charge. | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
form6.pdf
Tender Documents • 0.37 MB
form8.pdf
Tender Documents • 1.27 MB
terms.pdf
Tender Documents • 0.45 MB
BOQ_197018.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .