Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | L1 | Accepted-AOC Accepted Vide Resolution No 20 (1) dtd 21-1-2026 of Thalayolaparambu GP | |
| 2 | L2₹4.3 L+₹32,828.65 (8.32%)Rejected-AOC | L2 | Rejected-AOC Higher rate and hence rejected | |
| 3 | L3₹4.3 L+₹35,540.17 (9.01%)Rejected-Finance | L3 | Rejected-Finance Higher rate and hence not admitted | |
| 4 | L4₹4.3 L+₹37,581.34 (9.53%)Rejected-Finance | L4 | Rejected-Finance Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | Babu L1 | Riju k jamal pwd contractor L4 | T G GIREESAN L2 | CASTRO. V V L3 |
|---|---|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF TOILET | |||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 5.47 | cum | 328.42 ₹1,797.11 Lowest | 359.72 ₹1,968.39 | 355.76 ₹1,946.72 | 358.79 ₹1,963.3 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.08 | cum | 7,242.73 ₹15,079.36 Lowest | 7,932.89 ₹16,516.28 | 7,845.63 ₹16,334.6 | 7,929.5 ₹16,509.22 |
| 1.00 | OD382328/2025-2026:Random rubble masonry with hard stone in foundation and plinth up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 6.69 | cum | 6,871.24 ₹45,954.85 Lowest | 7,526 ₹50,333.89 | 7,443.21 ₹49,780.19 | 7,524.1 ₹50,321.18 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 8.08 | sqm | 352.56 ₹2,848.68 Lowest | 386.16 ₹3,120.17 | 381.91 ₹3,085.83 | 386 ₹3,118.88 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.26 | cum | 9,576.25 ₹12,104.38 Lowest | 10,488.77 ₹13,257.81 | 10,373.39 ₹13,111.96 | 10,448 ₹13,206.27 |
| 1.01 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 6.73 | cum | 7,042.46 ₹47,395.76 Lowest | 7,713.54 ₹51,912.12 | 7,628.69 ₹51,341.08 | 7,703.1 ₹51,841.86 |
| 1.01 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 1.12 | cum | 6,236.83 ₹7,016.43 Lowest | 6,831.14 ₹7,685.03 | 6,756 ₹7,600.5 | 6,830 ₹7,683.75 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 4.56 | sqm | 696.51 ₹3,176.09 Lowest | 762.88 ₹3,478.73 | 754.49 ₹3,440.47 | 761.77 ₹3,473.67 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 21.46 | sqm | 877.61 ₹18,837.9 Lowest | 961.24 ₹20,633.02 | 950.67 ₹20,406.13 | 950 ₹20,391.75 |
Tender Value
₹4.3 L
EMD Value
₹10,799
Closing Date
15 Nov 2025, 2:00 pmClosed
SOUMYA.V.S
Office of the Assistant Engineer LIDEW Section Thalayolaparambu Grama Panchayat
TLP 2025-26 Pro.129/26 Kitchen Construction of Govt UPS Thalayolaparambu
2025_LSGD_819361_1
55/2025-26/AE/LSGD/TLP
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thalayolaparambu GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹955
Yes
₹10,799
Yes
18 Apr 2026
7 Nov 2025
17 Nov 2025
7 Nov 2025
15 Nov 2025
7 Nov 2025
stage.html
html • 0.04 MB
techsummary_1373411.pdf
finsummary_1373411.pdf
aoc.pdf
finance_1373411.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Tendernotice_2.pdf
PDF • 0.02 MB
Tendernotice_3.pdf
PDF • 0.02 MB
BOQ_1373411.xls
BOQ • 0.32 MB
PRELIMcompressed.pdf
Tender Documents • 0.04 MB
sbdcompresse.pdf
Tender Documents • 0.73 MB
FOTcompress1.pdf
Tender Documents • 0.01 MB
Affidcompres1.pdf
Tender Documents • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .