Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.8 L+₹1,303.67 (0.06%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L2₹21.8 L+₹1,303.67 (0.06%)Rejected-AOC RAMPUR UTTAR PRADESH | BAREILLY | UTTAR PRADESH | 244701 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/S RAM BHAROSE CONTRACTOR L2 | ZAKIR ALI L2 | M.G.A CONTRACTOR L1 |
|---|---|---|---|---|---|---|
| 1.00Ward 19 me Wahid ke Hotel Se Punjab Tent tak RCC Nala Nirman karya (As per Estimate) | ||||||
| 1.01 | Earthwork in foundation or embankment in ordinary soil including earth from 5 km to the site. (Chapter 04, Sr. No. 251) | 164.78 | Nos | 180 ₹29,660.4 | 180 ₹29,660.4 | 179 ₹29,495.62 Lowest |
| 1.02 | Dismantling of old CC tiles road | 195 | Nos | 10 ₹1,950 | 10 ₹1,950 | 9 ₹1,755 Lowest |
| 1.03 | Laying of interlocking tiles (60 to 80 mm thick) including levelling and dressing of surface to required level and slope, filling joints with local sand. Includes all labour, tools & plants. (SOR Chapter 18/8) | 156 | Nos | 93 ₹14,508 | 93 ₹14,508 | 92 ₹14,352 Lowest |
| 1.04 | Providing & fixing interlocking CC tiles (80 mm thick, M-30 grade) over 20 to 40 mm sand layer, joints filled with dry fine sand. Includes all labour, tools & plants | 39 | Nos | 860 ₹33,540 | 860 ₹33,540 | 859 ₹33,501 Lowest |
| 1.05 | Cement concrete with 4 cm gauge stone ballast, fine sand (FM 1.25), and cement in 8:4:1 ratio. Includes labour, material, tools & plants. (SR No. 279 | 25.35 | Nos | 6,720 ₹1,70,352 | 6,720 ₹1,70,352 | 6,719 ₹1,70,326.65 Lowest |
| 1.06 | RCC work in 1:1.5:3 ratio with cement, approved coarse sand, and 20 mm gauge stone grit. Includes centering & shuttering. (Sl. No. 283 | 96.66 | Nos | 8,100 ₹7,82,946 | 8,100 ₹7,82,946 | 8,099 ₹7,82,849.34 Lowest |
| 1.07 | Mild steel or iron work in plain RCC/RB work including bending, supply of steel, wastage, and authorized overlapping. (Sl. No. 504 | 75.88 | Nos | 7,800 ₹5,91,864 | 7,800 ₹5,91,864 | 7,799 ₹5,91,788.12 Lowest |
| 1.08 | Providing and fixing RCC trench cover in 1:2:4 ratio, size 0.60 × 0.45 m. Includes centering & shuttering. (As per market rate | 550 | LTR | 1,000 ₹5,50,000 | 1,000 ₹5,50,000 | 999 ₹5,49,450 Lowest |
| 1.09 | Construction of information pillar in brickwork with black granite stone (size 3' × 2.5'), brickwork in 1:4 ratio in 1.20 m wide wall (23–35 cm thick), 1.35 m height above ground level, plaster in 1:4 ratio. Includes excavation, letter painting, and complete work with all materials, labour, and tools & plants | 1 | Job | 9,000 ₹9,000 | 9,000 ₹9,000 | 8,999 ₹8,999 Lowest |
Tender Value
Refer Docs
EMD Value
₹51,600
Closing Date
12 Jan 2026, 3:00 pmClosed
EO NPP Bilaspur
Office NPP Bilaspur
Ward 19 me Wahid ke Hotel Se Punjab Tent tak RCC Nala Nirman karya (As per Estimate)
2025_DOLBU_1102962_1
779/nppb/2025-2026/Swerage-4
Open Tender
Civil Works
Percentage
120 days
Bilaspur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,068
Executive Officer
₹51,600
21 Jan 2026
1 Jan 2026
12 Jan 2026
1 Jan 2026
12 Jan 2026
1 Jan 2026
Ward 19 me Wahid ke Hotel Se Punjab Tent tak RCC Nala Nirman karya (As per Estimate)
Earthwork in foundation or embankment in ordinary soil including earth from 5 km to the site. (Chapter 04, Sr. No. 251)
Dismantling of old CC tiles road
Laying of interlocking tiles (60 to 80 mm thick) including levelling and dressing of surface to required level and slope, filling joints with local sand. Includes all labour, tools & plants. (SOR Chapter 18/8)
Providing & fixing interlocking CC tiles (80 mm thick, M-30 grade) over 20 to 40 mm sand layer, joints filled with dry fine sand. Includes all labour, tools & plants
Cement concrete with 4 cm gauge stone ballast, fine sand (FM 1.25), and cement in 8:4:1 ratio. Includes labour, material, tools & plants. (SR No. 279
RCC work in 1:1.5:3 ratio with cement, approved coarse sand, and 20 mm gauge stone grit. Includes centering & shuttering. (Sl. No. 283
Mild steel or iron work in plain RCC/RB work including bending, supply of steel, wastage, and authorized overlapping. (Sl. No. 504
Providing and fixing RCC trench cover in 1:2:4 ratio, size 0.60 × 0.45 m. Includes centering & shuttering. (As per market rate
Construction of information pillar in brickwork with black granite stone (size 3' × 2.5'), brickwork in 1:4 ratio in 1.20 m wide wall (23–35 cm thick), 1.35 m height above ground level, plaster in 1:4 ratio. Includes excavation, letter painting, and complete work with all materials, labour, and tools & plants
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.27 MB
BOQ_2033824.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .