| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC | L1 | Accepted-AOC First lowest | |
| 2 | L2₹6.5 L+₹12,187.14 (1.92%)Rejected-AOC SAL SABEEL MANZIL H MANNA THALIPARAMBA PO KANNUR 670141 | THALIPARAMBA | KANNUR | KERALA | 670141 | L2 | Rejected-AOC Second lowest |
Tender Value
₹6.8 L
EMD Value
₹10,240
Closing Date
4 Jan 2022, 5:00 pmClosed
AE,Valanchery Municipality
Valanchery Municipality
Renovation of VCB
2021_LSGD_463226_1
09/ET/AE/VLY
Open Tender
Civil Works - Others
Item Rate
180 days
Valanchery
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,370
Yes
₹10,240
Yes
2 Feb 2022
27 Dec 2021
7 Jan 2022
27 Dec 2021
4 Jan 2022
27 Dec 2021
Amount
Parakkathodu VCB
50.9.13.3 : Supplying and fixing Vengai wood wrought and put up for roof members including cost and conveyance of materials etc. complete.
13.106 : Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade.
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
60.7.3 : DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
Pangattu VCB
50.9.13.3 : Supplying and fixing Vengai wood wrought and put up for roof members including cost and conveyance of materials etc. complete.
13.106 : Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade.
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Onnippadam Check dam
50.9.13.3 : Supplying and fixing Vengai wood wrought and put up for roof members including cost and conveyance of materials etc. complete.
13.106 : Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade.
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Palakkal thodu VCB
50.9.13.3 : Supplying and fixing Vengai wood wrought and put up for roof members including cost and conveyance of materials etc. complete.
13.106 : Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade.
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Akkipadam VCB
50.9.13.3 : Supplying and fixing Vengai wood wrought and put up for roof members including cost and conveyance of materials etc. complete.
13.106 : Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade.
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Narippatta Kalluvarambu VCB
50.9.13.3 : Supplying and fixing Vengai wood wrought and put up for roof members including cost and conveyance of materials etc. complete.
13.106 : Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade.
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
60.7.3 : DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
Moochithodu VCB
50.9.13.3 : Supplying and fixing Vengai wood wrought and put up for roof members including cost and conveyance of materials etc. complete.
13.106 : Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade.
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
Kadungad VCB
50.9.13.3 : Supplying and fixing Vengai wood wrought and put up for roof members including cost and conveyance of materials etc. complete.
13.106 : Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade.
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Kavumpuram Nilamthuruthi VCB
50.9.13.3 : Supplying and fixing Vengai wood wrought and put up for roof members including cost and conveyance of materials etc. complete.
13.106 : Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade.
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Pandarpadam VCB
50.9.13.3 : Supplying and fixing Vengai wood wrought and put up for roof members including cost and conveyance of materials etc. complete.
13.106 : Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade.
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Manakkal palam VCB (Kundoor VCB)
50.9.13.3 : Supplying and fixing Vengai wood wrought and put up for roof members including cost and conveyance of materials etc. complete.
13.106 : Painting (one or more coats) with black Japan paint of approved brand and manufacture to give an even shade.
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
ABDUL MAJEED K
Bidder Name
ABDUL MAJEED K
MASHOOD K
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_662976.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .