| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.2 CrAccepted-AOC | ₹69.2 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L2₹74.5 Cr+₹5.3 Cr (7.59%)Rejected-AOC | ₹74.5 Cr+₹5.3 Cr (7.59%) | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹74.6 Cr+₹5.4 Cr (7.78%)Rejected-Finance VIII 240 THERUVATH BUILDING UZHAVOOR P O KOTTAYAM KERALA 686634 | KOTTAYAM | KOTTAYAM | KERALA | 686634 | ₹74.6 Cr+₹5.4 Cr (7.78%) | L3 | Rejected-Finance Third Lowest |
| 4 | L4₹77.0 Cr+₹7.8 Cr (11.2%)Rejected-Finance WESTON ARCADE NO VI 723C MARKET P O VELLOORKUNNAM MUVATTUPUZHA 686673 | MUVATTUPUZHA | ERNAKULAM | KERALA | 686673 | ₹77.0 Cr+₹7.8 Cr (11.2%) | L4 | Rejected-Finance Forth lowest |
| 5 | L5₹80.4 Cr+₹11.2 Cr (16.1%)Rejected-Finance | ₹80.4 Cr+₹11.2 Cr (16.1%) | L5 | Rejected-Finance Fifth Lowest |
| Sl No | Description | Qty | Unit | AKSHAYABUILDERS L4 | PMR Construction Company L2 | SREEDHANYA CONSTRUCTION COMPANY L5 | Malabar Tech L6 | THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY L8 | ABDUL RAHIMAN T.A L1 | MALABAR ASSOCIATES L7 | THERUVATH BUILDERS L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SITE CLEARANCE AND DISMANTLING | |||||||||||
| 1.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 17.15 | Hectare | 50,000 ₹8,57,550 | 50,784.66 ₹8,71,007.7 | 50,000 ₹8,57,550 | 50,000 ₹8,57,550 | 46,000 ₹7,88,946 | 45,000 ₹7,71,795 | 44,300 ₹7,59,789.3 Lowest | 48,690 ₹8,35,082.19 |
| 1.00 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 3.36 | Hectare | 1,00,000 ₹3,36,000 | 48,644.04 ₹1,63,443.97 | 50,000 ₹1,68,000 | 50,000 ₹1,68,000 | 46,004 ₹1,54,573.44 | 45,000 ₹1,51,200 | 42,440 ₹1,42,598.4 Lowest | 46,639 ₹1,56,707.04 |
| 1.00 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 746.33 | cum | 500 ₹3,73,162.5 Lowest | 700.7 ₹5,22,949.93 | 500 ₹3,73,162.5 Lowest | 750 ₹5,59,743.75 | 1,113 ₹8,30,659.73 | 650 ₹4,85,111.25 | 610 ₹4,55,258.25 | 672 ₹5,01,530.4 |
| 1.00 | 2.4.10.C:Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry WorksAbove 900 mm | 70 | metre | 500 ₹35,000 Lowest | 1,169.53 ₹81,867.1 | 1,000 ₹70,000 | 1,200 ₹84,000 | 1,125 ₹78,750 | 1,100 ₹77,000 | 1,020 ₹71,400 | 1,121 ₹78,470 |
| 1.00 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 4,547.23 | cum | 450 ₹20,46,252.6 Lowest | 681.42 ₹30,98,572.1 | 500 ₹22,73,614 | 750 ₹34,10,421 | 590 ₹26,82,864.52 | 600 ₹27,28,336.8 | 590 ₹26,82,864.52 | 653 ₹29,69,339.88 |
| 1.01 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 373.03 | cum | 1,000 ₹3,73,026 Lowest | 1,382.78 ₹5,15,812.89 | 1,400 ₹5,22,236.4 | 1,500 ₹5,59,539 | 1,381 ₹5,15,148.91 | 1,250 ₹4,66,282.5 | 1,200 ₹4,47,631.2 | 1,326 ₹4,94,632.48 |
| 1.01 | 2.4.4.D:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Dry rubble masonry | 2,547 | cum | 400 ₹10,18,800 | 447.94 ₹11,40,903.18 | 500 ₹12,73,500 | 600 ₹15,28,200 | 403 ₹10,26,441 | 400 ₹10,18,800 | 390 ₹9,93,330 Lowest | 429 ₹10,92,663 |
| 1.01 | 2.8:Dismantling kerb stone by manual means and disposal of dismantled material with all lifts and up to a lead of 1000 metre | 1,000 | metre | 400 ₹4,00,000 | 24.05 ₹24,050 | 30 ₹30,000 | 30 ₹30,000 | 27 ₹27,000 | 22 ₹22,000 | 21 ₹21,000 Lowest | 23 ₹23,000 |
| 1.01 | 2.10.B:Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit Dismantling of Ordinary KM Stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit | 33 | each | 500 ₹16,500 | 531.68 ₹17,545.44 | 500 ₹16,500 | 750 ₹24,750 | 586 ₹19,338 | 450 ₹14,850 Lowest | 460 ₹15,180 | 510 ₹16,830 |
Tender Value
₹71.4 Cr
EMD Value
₹5 L
Closing Date
28 Apr 2025, 3:00 pmClosed
Project Director, PMU-KRFB, TVM
The Project Director, Kerala Road Fund Board, Project Management Unit, Ground Floor, BSNL Office Building at CGM(O), Doorsanchar Bhavan, PMG Junction Trivandrum 695033
Construction
2025_KRFB_760148_1
PWD/KR/TR/15008/2024_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
545 days
Palakkad
Please refer Tender documents.
8 documents required · 8 mandatory
₹19,518
Yes
₹5 L
Yes
Office of the Project Director, PMU-KRFB, TVM
14 Jul 2026
15 Apr 2025
30 Apr 2025
15 Apr 2025
28 Apr 2025
15 Apr 2025
22 Apr 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SITE CLEARANCE AND DISMANTLING | |||||
| 1.001 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 1 | Hectare | - | - |
| 1.002 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 1 | Hectare | - | - |
| 1.003 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | - | cum | - | - |
| 1.004 | 2.4.10.C:Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry WorksAbove 900 mm | - | metre | - | - |
| 1.005 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 0.2 | cum | - | - |
| 1.006 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 0.4 | cum | - | - |
| 1.007 | 2.4.4.D:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Dry rubble masonry | - | cum | - | - |
| 1.008 | 2.8:Dismantling kerb stone by manual means and disposal of dismantled material with all lifts and up to a lead of 1000 metre | - | metre | - | - |
| 1.009 | 2.10.B:Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit Dismantling of Ordinary KM Stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit | - | each | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
168295756.xls
BOQ Document • 0.37 MB
168295757.pdf
Tender Document • 0.06 MB
SBD.pdf
Tender Document • 2.39 MB
Requisitionfore-payment.pdf
Tender Document • 0.10 MB
168295759.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .