Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.3 LAccepted-AOC | L1 | Accepted-AOC RATES ARE FOUND REASONABLE AND BEING L1 BIDDER | |
| 2 | L2₹19.7 L+₹2.4 L (14.0%)Rejected-Finance | L2 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | AKASH PRASAD GUPTA L2 | SALEMAN ALAM L1 |
|---|---|---|---|---|---|
| 1.00SCHEDULE 'A' PART-I (BUILDING & STRUCTURE) | |||||
| 1.01 | Lump sum price worked out by the contractor for BUILDING & STRUCTURE (Construction of RCC framed structure for single officer living accn (Capt & equivalent) (single storey) and Garrage in permanent RCC framed structure, ATT, mosquito proofing, roof treatment, seismic measure etc including scooter shed complete all as specified and shown on drawing/design) as listed in Schedule ‘A’ Part-I of (Representing ___________% _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-I on Serial Page No. 22(R). | 1 | Lumpsum | 13,30,936 ₹13,30,936 | 11,52,922 ₹11,52,922 Lowest |
| 2.00SCHEDULE 'A' PART-II (EARTH WORK AND EXCAVATION EXCLUDING BUILDING & STRUCTURE) | |||||
| 2.01 | Lump sum price worked out by the contractor for EARTH WORK AND EXCAVATION as listed in Schedule ‘A’ Part-II of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-II on Serial Page No. 23 to 24. | 1 | Lumpsum | 1,40,000 ₹1,40,000 | 1,30,657 ₹1,30,657 Lowest |
| 3.00SCHEDULE 'A' PART-III (ROAD PATH AND CULVERT) | |||||
| 3.01 | Lump sum price worked out by the contractor for ROAD PATH AND CULVERT as listed in Schedule ‘A’ Part-III of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-III on Serial Page No. 25(R). | 1 | Lumpsum | 1,80,000 ₹1,80,000 | 1,55,000 ₹1,55,000 Lowest |
| 4.00SCHEDULE 'A' PART-IV (AREA DRAINAGE) | |||||
| 4.01 | Lump sum price worked out by the contractor for AREA DRAINAGE as listed in Schedule ‘A’ Part-IV of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-IV on Serial Page No. 26(R). | 1 | Lumpsum | 26,709 ₹26,709 | 20,000 ₹20,000 Lowest |
| 5.00SCHEDULE 'A' PART-V (INTERNAL ELECTRIFICATION) | |||||
| 5.01 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-V of (Representing ________________% ______ _______________Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-V on Serial Page No. 27 to 32. | 1 | Lumpsum | 92,651 ₹92,651 | 90,000 ₹90,000 Lowest |
Tender Value
₹23 L
EMD Value
₹46,000
Closing Date
7 Jul 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE BINNAGURI
HQ CWE BINNAGURI, BINNAGURI CANTT, JALPAIGURI, WEST BENGAL, PIN-735232
PROVN OF SINGLE OFFICER ACCN (CAPT AND EQUIVALENT) IN SOUTH ZONE AT BINNAGURI MIL STN UNDER GE (SOUTH) BINNAGURI
2025_MES_706446_1
8228/E8
Open Tender
Civil Works
Lump-sum
180 days
BINNAGURI MIL STATION
AS PER NIT
8 documents required · 8 mandatory
₹500
GE (S) BINNAGURI
₹46,000
Yes
14 Aug 2025
2 May 2025
8 Jul 2025
2 May 2025
7 Jul 2025
18 Jun 2025
Amount
SCHEDULE 'A' PART-I (BUILDING & STRUCTURE)
Lump sum price worked out by the contractor for BUILDING & STRUCTURE (Construction of RCC framed structure for single officer living accn (Capt & equivalent) (single storey) and Garrage in permanent RCC framed structure, ATT, mosquito proofing, roof treatment, seismic measure etc including scooter shed complete all as specified and shown on drawing/design) as listed in Schedule ‘A’ Part-I of (Representing ___________% _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-I on Serial Page No. 22(R).
SCHEDULE 'A' PART-II (EARTH WORK AND EXCAVATION EXCLUDING BUILDING & STRUCTURE)
Lump sum price worked out by the contractor for EARTH WORK AND EXCAVATION as listed in Schedule ‘A’ Part-II of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-II on Serial Page No. 23 to 24.
SCHEDULE 'A' PART-III (ROAD PATH AND CULVERT)
Lump sum price worked out by the contractor for ROAD PATH AND CULVERT as listed in Schedule ‘A’ Part-III of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-III on Serial Page No. 25(R).
SCHEDULE 'A' PART-IV (AREA DRAINAGE)
Lump sum price worked out by the contractor for AREA DRAINAGE as listed in Schedule ‘A’ Part-IV of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-IV on Serial Page No. 26(R).
SCHEDULE 'A' PART-V (INTERNAL ELECTRIFICATION)
Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-V of (Representing ________________% ______ _______________Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-V on Serial Page No. 27 to 32.
SCHEDULE 'A' PART-VI (HOT WATER SUPPLY)
Lump sum price worked out by the contractor for (HOT WATER SUPPLY) as listed in Schedule ‘A’ Part-VI of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-VI on Serial Page No. 33.
SCHEDULE 'A' PART-VII (SEWAGE DISPOSAL)
Lump sum price worked out by the contractor for SEWAGE DISPOSAL as listed in Schedule ‘A’ Part-VII of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-VII on Serial Page No. 34(R) to 35(R).
SCHEDULE 'A' PART-VIII (EXTERNAL WATER SUPPLY)
Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-VIII of (Representing ________________% ________ _____________ Percentage) @ ABOVE/BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-VIII on Serial Page No. 36.
SCHEDULE 'A' PART-IX (INTERNAL WATER SUPPLY)
Lump sum price worked out by the contractor for (INTERNAL WATER SUPPLY) as listed in Schedule ‘A’ Part-IX of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-IX on Serial Page No. 37 to 40(R).
SCHEDULE 'A' PART-X (EXTERNAL ELECTRIFICATION)
Lump sum price worked out by the contractor for (EXTERNAL ELECTRIFICATION) as listed in Schedule ‘A’ Part-X of (Representing ________________% ____________________ Percentage) @ ABOVE/ BELOW the lump sum price of Estimated / Prepriced Amount inserted by the MES in Schedule ‘A’ Part-X on Serial Page No. 41(R).
SCHEDULE 'A' PART-XI (MISCELLANEOUS ITEMS REQUIRED FOR B/R & E/M SERVICES (TO BE QUOTED BY CONTRACTOR))
M & L for horizontal boring across the existing road without disturbing the road surface for inserting GI pipe, Complete all as specified and directed by Engineer-in-Charge. Note :- GI pipe Shall be measured and paid respective
S&F non-metallic rigid PVC medium grade 20mm dia conduit and conduit accessories (ISI Marked) concealed in wall, complete all as specified and as directed by Engineer-in-charge.
S&F of Modular TV socket, 1 module 6 Amp one way including back plate and top cover fixed flushed to wall, ISI marked, complete all as specified and as directed by Engineer-in-charge.
S&F of Modular telephone socket (RJ-11), 1 module including back plate and top cover fixed flushed to wall, ISI marked, complete all as specified and as directed by Engineer-in-charge.
S&F of modular Metal flush box 12 module, complete all as specified and as directed by Engineer-in-charge.
S&F of modular white cover plate with frame 12 module inclusive of inner & outer plate, complete all as specified and as directed by Engineer-in-charge.
S&F of wall bracket decorative LED light fitting with Lamp 5 Watt warm white wooden finish fixture with necessary connection, complete all as specified and as directed by Engineer-in-charge.
S&F of LED bed side light fitting of 3 Watt 3000K with necessary connection, complete all as specified and as directed by Engineer-in-charge.
AKASH PRASAD GUPTA (BID ID -3336665)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .