| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAdmitted-Finance V P O NALPUR P O KHARKHODA DISTT MEERUTH UP | MEERUT | UTTAR PRADESH | 245206 | ₹8.4 L | L1 | Admitted-Finance |
| 2 | L2₹10.2 LAdmitted-Finance DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | ₹10.2 L | L2 | Admitted-Finance |
| 3 | L3₹10.5 LAdmitted-Finance | ₹10.5 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Sanjay Kumar L2 | Sh. Dinesh Kumar L1 | Thakur Narender Co Pvt Ltd L3 |
|---|---|---|---|---|---|---|
| 1.00Preparation of Detailed Project Report (DPR) for establishment of Faecal Sludge and Septage Management (FSSM) system, including carrying out detailed field investigations such as confirmatory digital survey, preparation of KML files, mapping of existing infrastructure, and assessment of service area. The scope also includes conducting all necessary studies related to population projection, septage generation, collection and transportation mechanism, and selection of suitable treatment and disposal or reuse strategy. The DPR shall include complete process design based on appropriate and sustainable technology, in accordance with CPHEEO Manual, along with detailed hydraulic design of all unit operations such as receiving station, screening, grit removal, equalization, biological treatment units, sludge drying beds or mechanical dewatering systems, and tertiary treatment units. Process design of all components including tanks, foundations, and allied civil works shall be carried out as per relevant IS codes. The work further includes preparation of detailed cost estimates comprising quantity take-off, abstract cost, rate analysis, contingencies, and provision for operation and maintenance. All necessary drawings such as layout plan, process flow diagram, hydraulic profile, process drawings, and service network mapping shall be prepared and included in the DPR. The report shall incorporate all environmental and statutory compliances as per CPCB and HPPCB norms. The agency shall submit four sets of hard copies along with soft copy of the DPR and shall extend necessary support for obtaining approval from the competent authority, including incorporation of observations as directed by the Engineer-in-Charge. The proposed system shall be designed to meet the prescribed effluent discharge standards of pollution control authorities and shall ensure a technically sound, sustainable, and cost-effective solution in line with CPHEEO guidelines. | ||||||
| 1.01 | Survey and investigation for providing Faecal Sludge and Septage Management (FSSM) facility for establishment of FSSM system for treatment of faecal sludge generated from household sanitation facilities for adjoining Panchayats of Chail Chowk, Gohar and Bassa in Tehsil Chachiot, District Mandi, Himachal Pradesh, shall be carried out using advanced and modern survey techniques. The scope includes conducting detailed topographical and site surveys using Differential Global Positioning System (DGPS) and Total Station with a precision limit of up to 0.5 cm accuracy for preparation of detailed site plan, geotagging of households, marking of proposed alignments and infrastructure, and preparation of longitudinal sections (L-section) and cross-sections (X-section) as required based on site conditions. A comprehensive reconnaissance survey shall be undertaken for preparation of a digital contour plan with contour intervals of 1.00 meter, clearly depicting all physical features such as residential structures, roads, high tension (HT) lines, natural drains, and other significant benchmarks relevant for planning and design of the FSSM facility. The survey shall also include identification and finalization of suitable locations for development of FSSM infrastructure in accordance with latest applicable norms and guidelines. All engineering drawings including site layout, contour maps, alignment plans, and detailed sections shall be prepared using latest version of AutoCAD software, ensuring clarity, accuracy, and professional presentation. The complete set of drawings shall be submitted in four (04) hard copies duly bound, along with soft copies in PDF and Word format. The entire work shall be carried out in complete accordance with the directions and to the satisfaction of the Engineer-in-Charge, ensuring compliance with all applicable standards and project requirements. | 1 | Job | 4,49,000 ₹4,49,000 | 3,50,000 ₹3,50,000 | 4,58,888 ₹4,58,888 |
| 1.02 | Preparation of Detailed Project Report (DPR) for establishment of Faecal Sludge and Septage Management (FSSM) system for treatment of faecal sludge generated from household sanitation facilities for adjoining Panchayats of Chail Chowk, Gohar and Bassa in Tehsil Chachiot, District Mandi, Himachal Pradesh, using state-of-the-art and advanced technologies. The scope of work includes detailed planning, marking of proposed infrastructure, preparation of longitudinal sections (L-sections) and cross-sections (X-sections) as per site conditions, and development of a comprehensive and technically sound DPR in complete form. The DPR shall include complete proposal with detailed process design, hydraulic design of the FSSM system along with all associated components, supported by latest authentic technical references and guidelines. The report shall contain detailed drawings, design calculations, bill of quantities, detailed measurements, and abstract cost estimates for all components of the system. The proposed FSSM facility shall comprise, but not be limited to, Inlet Chamber, Screen Chamber, Grit Channel, Distribution Box, sludge dewatering and drying systems including planted and unplanted sludge drying beds (SDBs), solar sludge deactivation unit, constructed wetland (root zone system), polishing pond, multi media filter, chlorine contact tank, as well as all allied infrastructure such as fencing panels around the STP yard, steel gate, interconnecting pathways, railings, access ladders, plant building/chowkidar room, manholes, inspection chambers, and other necessary appurtenances required for effective operation of the system. All drawings including layout plan, process flow diagram, hydraulic profile, details, and service network shall be prepared using latest version of AutoCAD software, ensuring high level of accuracy and professional presentation. The complete DPR shall be submitted in four (04) sets of hard copies, duly bound, along with soft copies in editable and PDF format. The DPR shall be prepared in all respects as per the directions of the Engineer-in-Charge and shall be suitable for obtaining administrative approval and technical sanction. The technology proposed in the DPR shall strictly conform to the design parameters and guidelines of the CPHEEO Manual and shall be capable of achieving the prescribed effluent discharge standards as per CPCB and HPPCB norms, ensuring a sustainable, efficient, and environmentally compliant FSSM system. | 1 | Job | 5,69,000 ₹5,69,000 | 4,88,000 ₹4,88,000 | 5,88,888 ₹5,88,888 |
Tender Value
₹8.2 L
EMD Value
₹16,500
Closing Date
23 Apr 2026, 10:00 amClosed
EE
Executive Engineer JS Division Baggi Distt. Mandi H.P.
as per BOQ
2026_HPIPH_134311_1
EE-JSD-BGI/2026- 918-68 dt. 13/04/2026
Open Tender
Civil Works
90 days
Baggi
as per NIT
6 documents required · 6 mandatory
₹350
₹16,500
28 Apr 2026
15 Apr 2026
23 Apr 2026
15 Apr 2026
23 Apr 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Preparation of Detailed Project Report (DPR) for establishment of Faecal Sludge and Septage Management (FSSM) system, including carrying out detailed field investigations such as confirmatory digital survey, preparation of KML files, mapping of existing infrastructure, and assessment of service area. The scope also includes conducting all necessary studies related to population projection, septage generation, collection and transportation mechanism, and selection of suitable treatment and disposal or reuse strategy. The DPR shall include complete process design based on appropriate and sustainable technology, in accordance with CPHEEO Manual, along with detailed hydraulic design of all unit operations such as receiving station, screening, grit removal, equalization, biological treatment units, sludge drying beds or mechanical dewatering systems, and tertiary treatment units. Process design of all components including tanks, foundations, and allied civil works shall be carried out as per relevant IS codes. The work further includes preparation of detailed cost estimates comprising quantity take-off, abstract cost, rate analysis, contingencies, and provision for operation and maintenance. All necessary drawings such as layout plan, process flow diagram, hydraulic profile, process drawings, and service network mapping shall be prepared and included in the DPR. The report shall incorporate all environmental and statutory compliances as per CPCB and HPPCB norms. The agency shall submit four sets of hard copies along with soft copy of the DPR and shall extend necessary support for obtaining approval from the competent authority, including incorporation of observations as directed by the Engineer-in-Charge. The proposed system shall be designed to meet the prescribed effluent discharge standards of pollution control authorities and shall ensure a technically sound, sustainable, and cost-effective solution in line with CPHEEO guidelines. | |||||
| 1.01 | Survey and investigation for providing Faecal Sludge and Septage Management (FSSM) facility for establishment of FSSM system for treatment of faecal sludge generated from household sanitation facilities for adjoining Panchayats of Chail Chowk, Gohar and Bassa in Tehsil Chachiot, District Mandi, Himachal Pradesh, shall be carried out using advanced and modern survey techniques. The scope includes conducting detailed topographical and site surveys using Differential Global Positioning System (DGPS) and Total Station with a precision limit of up to 0.5 cm accuracy for preparation of detailed site plan, geotagging of households, marking of proposed alignments and infrastructure, and preparation of longitudinal sections (L-section) and cross-sections (X-section) as required based on site conditions. A comprehensive reconnaissance survey shall be undertaken for preparation of a digital contour plan with contour intervals of 1.00 meter, clearly depicting all physical features such as residential structures, roads, high tension (HT) lines, natural drains, and other significant benchmarks relevant for planning and design of the FSSM facility. The survey shall also include identification and finalization of suitable locations for development of FSSM infrastructure in accordance with latest applicable norms and guidelines. All engineering drawings including site layout, contour maps, alignment plans, and detailed sections shall be prepared using latest version of AutoCAD software, ensuring clarity, accuracy, and professional presentation. The complete set of drawings shall be submitted in four (04) hard copies duly bound, along with soft copies in PDF and Word format. The entire work shall be carried out in complete accordance with the directions and to the satisfaction of the Engineer-in-Charge, ensuring compliance with all applicable standards and project requirements. | - | Job | - | - |
| 1.02 | Preparation of Detailed Project Report (DPR) for establishment of Faecal Sludge and Septage Management (FSSM) system for treatment of faecal sludge generated from household sanitation facilities for adjoining Panchayats of Chail Chowk, Gohar and Bassa in Tehsil Chachiot, District Mandi, Himachal Pradesh, using state-of-the-art and advanced technologies. The scope of work includes detailed planning, marking of proposed infrastructure, preparation of longitudinal sections (L-sections) and cross-sections (X-sections) as per site conditions, and development of a comprehensive and technically sound DPR in complete form. The DPR shall include complete proposal with detailed process design, hydraulic design of the FSSM system along with all associated components, supported by latest authentic technical references and guidelines. The report shall contain detailed drawings, design calculations, bill of quantities, detailed measurements, and abstract cost estimates for all components of the system. The proposed FSSM facility shall comprise, but not be limited to, Inlet Chamber, Screen Chamber, Grit Channel, Distribution Box, sludge dewatering and drying systems including planted and unplanted sludge drying beds (SDBs), solar sludge deactivation unit, constructed wetland (root zone system), polishing pond, multi media filter, chlorine contact tank, as well as all allied infrastructure such as fencing panels around the STP yard, steel gate, interconnecting pathways, railings, access ladders, plant building/chowkidar room, manholes, inspection chambers, and other necessary appurtenances required for effective operation of the system. All drawings including layout plan, process flow diagram, hydraulic profile, details, and service network shall be prepared using latest version of AutoCAD software, ensuring high level of accuracy and professional presentation. The complete DPR shall be submitted in four (04) sets of hard copies, duly bound, along with soft copies in editable and PDF format. The DPR shall be prepared in all respects as per the directions of the Engineer-in-Charge and shall be suitable for obtaining administrative approval and technical sanction. The technology proposed in the DPR shall strictly conform to the design parameters and guidelines of the CPHEEO Manual and shall be capable of achieving the prescribed effluent discharge standards as per CPCB and HPPCB norms, ensuring a sustainable, efficient, and environmentally compliant FSSM system. | - | Job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
FORM6_11.pdf
Tender Documents • 0.45 MB
TC.pdf
Tender Documents • 0.14 MB
BOQ_198636.xls
BOQ • 3.10 MB