Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹26.7 L+₹8,136.25 (0.31%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹28.2 L+₹1.7 L (6.29%)Rejected-AOC | L3 | Rejected-AOC L4 | |
| 4 | L4₹29.0 L+₹2.5 L (9.28%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹30.1 L+₹3.6 L (13.4%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
₹34.6 L
EMD Value
₹50,000
Closing Date
18 Jan 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, MI Division Palakkad
Executive Engineer, MI Division Palakkad
GENERAL-Kozhiyode Akampadam chal At Erimayoor G.P-Side protection works to Kozhiyode Akampadam chal at Kuthirappara in Erimayoor Gramapanchayath in Palakkad District. -General Civil Work
2024_Irrig_643296_1
IRR/IA/TR/8219/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Erimayur Panchayath
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
14 Feb 2024
11 Jan 2024
22 Jan 2024
11 Jan 2024
18 Jan 2024
11 Jan 2024
11 Jan 2024 - 15 Jan 2024
Amount
Akampadam chal at Kozhiyode
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
OD22104/2022-2023:Providing and laying in cement concrete 1:2:4 without the cost for vibrator(cost for item 4.1.3= 5073.95 deducting Rs.25.90 as vibrator hire charges including cost index
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
Tractor cross and UT
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
OD22103/2022-2023:Providing and laying cement concrete 1:2:4 without the cost of vibrator (cost of item = Rs 5073.95 deducting Rs 25.90 as vibrator hire charges including Cost Index
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
BIJU. K
C MUKUNDAN
KRISHNAN.K.K
RAJALEKSHMY B.
JAMES P J
Bidder Name
JAMES P J
BIJU. K
C MUKUNDAN
RAJALEKSHMY B.
KRISHNAN.K.K
TARIKH ANVAR E
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_983402.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .