Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹33 L
EMD Value
₹33,000
Closing Date
26 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy.Minicipal Commissioner - West Zone
Construction RCC road and fixing interlocking Paver block work at Vasantkunjarea , Pritam nagar road area , Hira baag crossing area, Bhudarpura road area, Madalpur area and in different societies under MP /MLA/Councillor / Other budget in paldi ward in west zone.(ARC Tender)
365735
3/26-27 (T.N.30)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹1,500
Municipal Commissioner, Ahmedabad
₹33,000
16 Nov 2026
16 Nov 2026
16 Nov 2026
26 Nov 2026
16 Nov 2026
120 days
Name of Work :-Construction RCC road and fixing interlocking Paver block work
at Vasantkunjarea , Pritam nagar road area , Hira baag crossing area, Bhudarpura
road area, Madalpur area and in different societies under MP /MLA/Councillor /
Other budget in paldi ward in west zone.(ARC Tender)
Sr. Quantity Item Rate Unit Amount
Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as 205.35
directed upto 50Mt.lead.
CONVEYANCE CHARGES-FOR DIFFERENT TYPES OF
MATERIALS (A) lime murrum building rubbish earth
manure or sludge &execavated rock and rubbish [Lime -
murrum building rubbish]
a) Lead up to 1 Km.
b) Lead From 1Km to 2 Km.
c) Lead From 2 Km to 3 Km.
d) Lead From 3 Km to 4 Km.
e) Lead From 4 Km to 5 Km.
Dismantling thefollowing includingloading, unloading
and disposal of unserviceable material for all lead or as
3 directed by Engineer-In-Charge and stacking the
serviceable material and backfilling the resulting trenches
and pits complete.
central verge -kerb stone
Dismantling tiledor stonefloors laidin mortar including
b 500 stacking ofserviceable materialand disposalof Smt
uservicalble material with all lead and lifts. 47.25
Demolition & disposal of unservisable material with all
c 100 lead and lift for unreinforeced concrete. (AMC sor) Cmt
Demolition of brick work & stone masonry including
stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift (1) In cement 544.95
Demolition includingstacking ofserviceable materials and
e 100 disposal of unserviceable materials with alllead and lift. Cmt
(I) R.C.C work.
Extra rate over item of excavation of earth for excavation
of asphalt pavement /RCC ofthickness upto 0.20 meter
including demolishing the asphalt carpet, metal,s
oiling/cutting Reinforcement etc.comp. with stacking -
the material as directed. (Based on Previously approved
rate by C E sir )
up to 0.20 meter thickness (By Manual)
0.20 to 0.30 meter (By anytype ofBreaker Machine or
b 500 R.C.C.Cuttermachine includingcost ofoperator, fuel, & Smt
transportation etc complete.
0.30 meter& above (By anytype ofBreaker Machine or
c 150 R.C.C.Cutter machine including costof operator, fuel, & Smt
transportation etc complete.
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H
Kerb block for Footpath in M-20 grade using 20 mm
nominal size blacktrap aggregateof Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably
exposed finish/ formwork ,mould with well equipped with
vibratory system for kerbstones ofapproved
designincluding curing, etc. complete, including the cost
of formwork etc. complete. The rate shall also include
necessary cutting of asphalt, fixing the Kerb stones in line
and level on 5 cm thick sand bedding with necessary 350.89
equipments and materials. The rate shall also
include theflush pointingin CM (1:3) forall jointsof
thekerbstones. Filling ofzari alonethe sidesof thekerb
stonefixed withBituminous concretemixed inproper
position as directed by Engineer in change to form a
portable mixture. In any case Gravel or such type of
materials shall not be allowed for production. a) Laying on
5 cm thick Sand Bedding
Providing and Laying of Rubber Moulded Paver
Block Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks) usingblack trapgood
qualityaggragate of 20 mm nominal size for footpath,
parking areas, service lanes and other areas as
mentionedin thedrawing /instruction ofengineer in
charge. Cost includesformworks usingrubber mould,
Rateproviding and laying paver blocksas perrequired
gradingand specification. The paver block shall be
6 175 mechanically compacted. The work of paving blocks Smt
shallbe executedin lineand levelby skill mason of flooring
work only. It should be laid in such a way that theno
cuttingof thepaver blockto be necessary. if cutting
ofpaver blocknecessary thenit shouldbe cut by machine
onlyand carting. The finishedsurface ofthe paver block
shall have resonably good, plain finished. Paver blocks shall
be compacted and shall be relaid if necessary. Gravel or
such type of materials shall not be allowed for
Laying on 5cms thick sand beddding.
Providing and laying cement concrete 1:4:8 (1- Cement : 4-
7 140 fine sand : 8- graded brick bat aggregates 40mm nominal Cmt
size) and curing complete.
Providing and laying cement concrete 1:5:10 (1- Cement :
5- Coarse sand : 10- hand broken stone aggregates 40 mm
nominal size) and curing complete excluding cost of 2,492.51
formwork in (A) Foundation and Plinth
Providing TMT Bar FE500D reinforcement for R.C.C. Work
9 3990 including bending,binding and placing in position complete Kg
upto floor two level
ofRCCnosingincentralvergeusingM-
200gradecementconcrete.Theitemincludescos
10 2 tofcentering&shuttering,reinforcement,bothsi 4,812.72 No.
decementplasterinC:M1:3mortar&curingetc.c
omplete.Halfroundportionofthenosingshallbe
madebyusingmildsteel.
Providing and laying in position Ready Mixed M-200
grade concrete for reinforced cement conctere work,
using cement content as per approved Design Mix
manufactured in fully automatic batching plant and
transported to site of work intransit mixer for a lead
up to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade
for reinforced cement concrete work including
11 210 pumping of R.M.C. from transit mixer to site of Cmt
laying, excluding the cost of centering shuttering
finishing and reinforcement including cost of
admixtures in recommended proportions as per
IS:9103 to accelerate/ retard setting of concrete,
improve work ability without impairing strength and
durability as per direction of theEngineer-in-charge.
Without Fly Ash (Min cement level as per latest IS456
shall be maintained) (Cement level 400 kg )
Providing Formwork of ordinary timber planking so
as to give a rough finish including centering
shuttering strutting and propping etc. Height of
12 0 propping and centering below supporting floor to
ceiling not exceeding 4 M.and removal of the same
for in situ reinforced concrete and plain concrete
(A)Foundations Footings Bases of Columns etc. and
Mass concrete. 171.68
Providing & Applying Tri mix with Machine floater machine
13 1400 on constructed RCC work including Machine &Labouretc Smt
Comp as directed. 54.00
Making 15 mm groove in RCC work on road and filling it
14 467 with polysulfiedselant and finished it good incl.alllabour Rmt
charges etc comp as directed. 30.00
Hiring of tractor with trolley considering 8 Hrs. as working
15 25 day hours incl.Driver Day
Providing chotahathi or driver with fuel , to carry out
different works during day/night for 8 hrs. shift. Work shall
16 20 be carried out as per the instructions of Engineer in charge shift
4 Nos of labour all necessary permit etc. comp. (For 8 1,452.00
Providing & Supplying JCB Machine on rental basis in case
of emergency situation and break down type work & also
during unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel
andoperating charges and stacking of useful & non-useful 535.71 Hour
materials separately up to store. (No payment should be
allowed for non working condition of machinery and for
pipe line excavation and laying work)
Repairing damaged M.H. and rasing M.H. up to road level
incl. removing damaged brick work and repairing by brick
18 0 masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I.
steps and existing MH sheet cover, removing the debris
from MH and carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
(C) up to 0.65 mt. (@ Seven Coarse)
Repairing damaged I.C./ Raising removing damaged brick
work and repairing by brick masonry in C.M. 1:5 and
19 30 plaster in C.M. 1:3 and fixing C.I. steps and existing
chamber sheet cover, removing the debris from chamber
and carting the same as directed.
Providing F.R.C. MH seat cover incl. carting to the
work site etc. comp. Directed. -
F.R.C. Extra HeavyDuty (EHD-35) ManholeCovers &
Frames Cover : 728mm ø & 100 mm thick circular cover,
35.00 MT load design, 100x2mm MS flat allround, 16mm ø
plain round bar for lifting the cover & should be fitted with
a 25 plastic cups. Frame : 560 mm ø clear opening, outer size-
888x888x175 mm. On the upper periphery of frame 25 x
mm wide MS flat should be well embed in concrete to
protect the edges of frame. FRC E.H.D.-35 manhole cover
& frame described as above
F.R.C. Heavy Duty [HD-20] Machinehole Covers - 560 mm ø
b 28 clear opening, The dimension of frame and cover as per No.
mentioned in Amend No.1 to IS 12592 : 2002 table 1. 1,720.44
F.R.C. Medium Duty [MD-10] Machinehole Covers -
560mm ø clear opening, The dimension of frame and cover
as per mentioned in Amend No.1 to IS 12592 : 2002 table
F.R.C. Medium Duty [MD-10] Chamber Covers & Frame-
600 x 450 mm clear opening, The dimension of frame and
cover as per mentioned in Amend No.1 to IS 12592 : 2002
F.R.C. Light Duty [LD-2.5] Machinehole Covers & Frames-
560mm ø clear opening, The dimension of frame and cover
as per mentioned in Amend No.1 to IS 12592 : 2002 table
Carting and Fixing M.H., Chamber or Catchpite Seat and
Cover in line and level to match exisisting road level in C.C.
21 5 1:2:4 and finishing smooth, watering and protecting for
days etc. complete as directed. M.H. seat cover will be
supplied byA.M.C.(from any store)
Supplying, labour for break down repairing work for
22 0 activities like excavation, disliting, removing debris from
trench back filling etc. comp. as directed by Eng.in charge. -
Mazdoor at day /Night
Makadam/ supervision at day / Night
Constructing Bombay Pattern Type Catch Pit of size 0.60 x
0.60 depth up to 1 mt including excavation, B.B.C.C.
(1:5:10), 23 cms thick brick maso. wall in the prop. of CM
23 14 (1:6) with 40 mm thick IPS flooring in the prop M15 at
bottom and 15 mm thick cement plaster inside the catch
pit in the proportion of CM (1:3) with outjali etc. comp. as
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with
24 15 frame 600mm x 600mm clear opening etc. comp.. As No
directed by engineer in charge. 1,377.64
Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical
25 0 mix plant carriage of mixed Material by tipper to site,
laying in uniform layers in sub- base / base course on well
prepared surface and compacting with vibratory roller to
achieve the desired density as per Codal Provision.
a 50 Production & Supply of WMM Cmt
Labour work for fixing interlocking blocks / any kind of
pavement on up to 50 mm thick sand bedding,
levelling,watering and fixing in line & level as well cleaning 68.64
the site etc.comp. as directed.
Labour work of fixing kurb any design of central verge,
(both side) footpathkurb, itemsincludes necessary
excavation, asphalt cutting of any thickness, erecting in
27 100 line and position and pointing with cement mortar (1:3), Rmt
watering, etc complete, filling with zari along the side of
the kurb, the kurb stone fix prepared with bitumnious top
surface, as directed by engineer in charge.
Providing and supplying ISI Standard RCC pipes (of
sulphate resisting Cement )in standard lengths of following
class and diameter suitable for rubber ring joints (socket
28 and spigot) including all taxes,insurance,
transportation,treightcharges,octroi,inspection charges, -
loading,unloading, conveyance to departmental stores,
stacking etc. complete
Class NP3 Test pressure 0.7 Kg/Sq.Cm
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2 of
following diameters in proper position , grade and
29 alignment at all level as directed by Engineer-in- charge
including conveyance from stone to site of work, labour
giving hydraulic testing as per ISI code.
Removing and refixing of kerb Removal of existing
kerb stones of any type, any size, any thickness in safe
manner with base PCC including excavation etc and refix
the same as desired location as per drawing and as
directed by Engineer in charge. Rate shall be inclusive of
removing with all subbase (including excavtion), refixed
30 100 the same (approved before reuse) on existing base PCC, Rmt
addition kerb of same profile (if required and shall be paid
relevant tender item), disposal unserviceable material with
all lifts and up to any lead at non objectional place and
stacking the serviceable material (paver) upto AMC store
including loading, unloading as directed by Engineer-in-
Filling Zari Filling of Zari along the sides of the
kerbstone fixed, prepared with Bituminous
Concrete mixed in proper proportion as directed
by Engineer- In - Charge to form a pourable 50.00
mixture. (Street Devlopment of Dehgam
Road FromDevi Cinema road tender)
Pre cast Cylindrical Bollard Providing and fixing
cylinder pre cast bollard with exposed/ fair
finished made in M-30. Bollard is precast with
cement concrete of M-30 grade by providing
no of 12 mm dia. tor steel by vibro compaction
method using FRP/steel mould for
achiveshutttring finish as directed and approved
by EIC. Sample shall be approved. Approximate
size of bollard is 900 to 1000mm height x 225 to
300mm dia. Rate shall be inclusive of concrete,
reinforcements as stated in the item description,
necessary moulds, pouring, placing, compaction, 1,084.49
necessary curing, all accessories required for
fixing, with all taxes, transportation, loading and
unloading charges. Additional reinforcement, if
any shall be measured and paid for in the
relevant tender item. The rate shall also include
for erecting and fixing the pieces in position etc
complete as per drawing. The rate shall also
include the cost of excavation, base PCC M15
grade and finish good, curing etc complete as
directed by engineer in charge.
Providing and laying for approved for approved
33 1400 quantity (ISO certified Brand) floor Harderner @ smt
Contractor'sSign Addl.C.E.
MobilNo:- (westzone)
AMC Financedept.circular No –41,Dt.08/02/2022
(A) GuaranteesissuedbyfollowingbankswillbeacceptedasSD/EMDonpermanentbasis.
(1) AllNationalizedBanks
(B) GuaranteesissuedbyfollowingbankswillbeacceptedasSD/EMDfortheperioduptoMarch-
31,2022.Thevalidity
cutoffdateintheGRiswithrespecttothedateofissueofBankGuaranteeirrespectiveofthedateofterminati
onofBankGuarantee.GuaranteesissuedorAuthorizedbyAhmedabadBranchOnly.
(1) CommercialBanks:
(5) KotakMahindraBank
(6) IndudIndbank
(8) TamilnaduMercantileBank
(9) UjjivanSmallFinancebank
(10) AUSmallFinanceBank
(11) FedaralBankBank
(12) EquitasSmallFinancebank
(13) BandhanBank
(14) StandardCharteredBank
(2) Co-Operative&RuralBanksofGujarat
1. TheMehsanaUrbanCo-operativeBankLtd
2. TheAhmedabadMercantileCo-OperativeBankLtd
3. NutannagrikSahakariBankLtd
4. TheKalupurCommericalCo-operativeBankLtd
5. RajkotNagarikSahakariBankLimited
6. TheGujaratStateCo-OperativeBank
8. SaurashtraGraminBank
SealandSignatureoftheBidder AddlCityEngineer
AHMEDABADMUNICIPALCORPORATION
SpecialCondition
Name of Work:“Construction RCC road and fixing interlocking Paver block work at
Vasantkunjarea , Pritam nagar road area , Hira baag crossing area, Bhudarpura road area,
Madalpur area and in different societies under MP /MLA/Councillor / Other budget in
paldi ward in west zone.(ARC Tender)with 50% paver block Material from Amdavad Enviro Project Pvt.
Ltd. at PALDI ward, WEST zone."
Special condition of contract for ( Providing and Laying of Rubber Moulded Paver Block Grey 60 mm thick,
M-35 Grade, Any size and shape of Interlocking paver block M-35 Grade, 300 mm-L x 150 mm-B x
mm-H Kerb block for Footpath in M-20 grade using 20 mm nominal size,).
Successful bidder of this tender shall have to purchase 50 % of total quantity of paver block from
Amdavad Enviro Projects Pvt. Ltd. directly. The paver blocks shall be as per tender BOQ & tender
specifications. Payment of such 50% quantity shall be made to Amdavad Enviro Projects Pvt. Ltd.
directly by the successful bidder on mutual agreement of rate between successful bidder &Amdavad
Enviro Projects Pvt. Ltd.. AMC shall not be responsible for any kind of dispute between Amdavad
Enviro ProjectsPvt.Ltd.&successfulbidderofthistender.Thesuccessfulbidderwill be paid by AMC as
per tender BOQ item rate + premium.
Thequality,size,shape,compressivestrength&othertechnicalparametersofPaverBlockshall be as per IS
standards & tender specifications and shall be completely successful bidder’s responsibility.
IfincaseoffailureofPaverBlockorifPaverBlocksarenotasperthestandards,thesameshall be rejected.
Successful bidder shall remove such failed paver blocks immediately from site and fix new paver
blocks as per standards.
The successful bidder shall produce a certificate / bill from Amdavad Enviro Projects Pvt. Ltd.
showing quantity of Paver Block, which should be minimum 50% of total quantity.
1.AlltherelevantClausesmentionedintheTenderwhicharerelatedtoaboveclausesshallbe read as
mentioned in above Special Condition.
Dy.CityEngineer Addl.CityEngineer
(West Zone) (west Zone)
AHMEDABADMUNICIPALCORPORATIONENGINEERDEPARTMEN
TECHNICALSPECIFICATION
NameofWork:-Construction RCC road and fixing interlocking Paver block
work at Vasantkunjarea , Pritam nagar road area , Hira baag crossing
area, Bhudarpura road area, Madalpur area and in different societies
under MP /MLA/Councillor / Other budget in paldi ward in west
zone.(ARC Tender)
GeneralTechnicalSpecificationSection
FollowingtechnicalspecificationsshallbeapplicabletotherelevantitemsofBOQ
Box cutting the road surface to proper slopeand camber for making a base for road workincluding removing
the excavated stuff anddepositing on the road side slope as directedupto50Mt.lead..
Themodeofpaymentforthisitemshall beon Cmt. Basis.
Conveyance charge of earth, lime, murrum, building rubbish,
manure, arbage, sludge, excavatedrock, flyash, aggregates
of any kind Including spreading & levelling etc. complete.
Themodeofpaymentforthisitemshall beon Cmt. Basis.
Dismantling the following including loading, unloading and disposal of unserviceable material for all lead or as
directed byEngineer-In-Chargeand stackingtheserviceable materialandbackfillingthe
resultingtrenchesandpitscomplete.
a. centralverge-kerbstone.
b. Dismantlingtiledorstonefloorslaidinmortarincludingstackingofserviceablematerialanddisposalo
funserviceablematerialwith all lead andlifts.
c. Demolition&disposalofunserviceablematerialwithallleadandliftforunreinforcedconcrete.
d. Demolitionofbrickwork&stonemasonryincludingstackingofserviceablematerialsanddisposalofu
nserviceablematerialswithalllead andlift(1)In cementmortar.
e. Demolitionincludingstackingofserviceablematerialsanddisposalofunserviceablematerialswithal
lleadandlift.(I)R.C.C work.
Thedemolitionshallconsistofdemolitionofoneormorepartsofthestructureasspecifiedorshowninthedrawings.Dem
olition implies taking up or down or breaking up. This shall consist of demolishing whole or part of work
including all relevantitemasspecified or shownin the drawings.
The demolition shall always be planned before hand and shall be done in reverse order of the one in which the
structure wasconstructed.Contractorisfully responsibleforproperandsafedemolition.
Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining work or
property, which is to beleft intact, before dismantling and demolishing is taken up and the work shall be carried
out in such a way that no damages iscaused tothe adjoiningproperty.
Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary precautions shall be
taken to keep thedust nuisance downasandwhere necessary.
Dismantling shall be commenced in a systematic manner. All materials which are likely to be damaged by
dropping from a heightor demolishing roof, masonry etc. shall be carefully dismantled first. The dismantled
articles shall be properly stacked as directed.All materials obtained from demolition shall be the property of
Government unless otherwise d shall be kept in safe custody untilhanded over totheEngineer-in-charge.
Any serviceable materials, obtained during dismantling or demolition shall be separated out and stacked
properly as directed,withalllead andlift.Allunserviceablematerials, rubbishetc.shallbstacked asdirectedby
theEngineer-in-charge.
Oncompletionofwork,thesiteshallbeclearedofalldebrisrubbishandcleanedasdirected.
Modeofmeasurements&payment:
Measurementsofallworkexcepthiddenworkshallbetakenbeforedemolitiondismantlingandnoallowanceforincreas
einbulk shall be allowed. The demolition of lime concrete shall be measured under this item. Specification for
deduction for voids,openingsetc.shall beonsamebasisasthat employedforconstructionofwork.
All work shall be measured in decimal system as fixed in its place subject to the following limits, unless
otherwise statedhereinafter : (a) Dimensions shall be measured to the nearest 0.01 mt. (b) Area shall be worked
out to the nearest 0.01 sq. mt.(c,d,e)Cubicalconnectionshallbe worked outto the nearest 0.01 Cu.m.
Therateshallincludecostofalllabourinvolvedandtoolsusedindemolishinganddismantlingincludingscaffolding.Thera
teshall also include the charges for separating out and stacking the serviceable materials properly and disposing
the unserviceablematerials with all lead and lift. The rate also includes for temporary storing for the safety of
the portion not required to be pulleddownorofadjoiningpropertyandprovidingtemporary enclosuresorpartitions
whereconsidered necessary.
The rate shall be for a unit of
one cubic metre.For
Dismantlingof Tiled Floor:
The relevant specifications shall be followed except the dismantling of tiled or stone floors laid on mortars shall
be doneDismantling implies carefully taking up or down or these are fixed by nail screws bolts etc. the shall be
taken out with propertools.
Modeofmeasurement&Payment:
Thesupportingmaterials suchas joints beams if
anyetc.shallbemeasuredseparately.Therateshallincludestackingtheunserviceablematerialsasdirectedwillleadandlif
Therateshallbeforaunitof(a)RMT(b)one sq.Meter(C) CMT(d)Cu.m(e)Cu.m
Extra rate over item of excavation of earth for excavation of asphaltpavement / RCC of thickness up to
meter includingdemolishing the asphalt carpet, metal, soiling/cutting Reinforcement etc. comp. with stacking
the material as directed. (a) upto 0.20 meter thickness (By Manual)(b) 0.20 to 0.30 meter (By any type
ofBreaker Machine or R.C.C.Cutter machine includingcost of operator, fuel, & transportation etccomplete.(c)
0.30 meter & above (By any type of Breaker Machine or
R.C.C.Cuttermachineincludingcostofoperator,fuel,&transportationetc complete.
TheItemshallbecarriedoutasperItemdescriptionandasperinstructionofEngineer-in-
Chargeand/orhisauthorizedrepresentative.
Therateincludesthecostofexcavationofbituminousmacadami.e.bituminouslayersonlylikeDBM,BCetcincludingthela
bours,tools,equipmentandallotherincidentalexpenses.NonBituminousSub-
layer/Subbasearenotconsideredinthisitem.
WorkshallbecarriedoutmanuallyorbyMachineryaspersiterequir
ements.Themodeofpaymentforthisitemshall beon Smt. Basis.
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb block for Footpath in M-20 grade using 20 mm
nominal size blacktrap aggregateof Sevaliya/Timba or equivalent quality for pre-cast blocks, reasonably
exposed finish/ formwork ,mould with well equipped with vibratory system for kerbstones ofapproved
designincluding curing, etc. complete, including the cost of formwork etc. complete. The rate shall also include
necessary cutting of asphalt, fixing the Kerb stones in line and level on 5 cm thick sand bedding with necessary
equipments and materials. The rate shall also include theflush pointingin CM (1:3) forall jointsof
thekerbstones. Filling ofzari alonethe sidesof thekerb stonefixed withBituminous concretemixed inproper
position as directed by Engineer in change to form a portable mixture. In any case Gravel or such type of
materials shall not be allowed for production. a) Laying on 5 cm thick Sand Bedding .
SpecificationasperItem No. 5 onlysizeofkerbasmentionedinAbstract.
Themodeofpaymentforthisitemshall beon Rmt. Basis.
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of 20 mm nominal size for footpath,
parking areas, service lanes andother areas as mentioned in the drawing / instruction of Engineer-in-Charge
and/or his authorized representative. Costincludes formworks using rubber mould, Rate providing and laying
paver blocks as per required grading and specification. Thepaver block shall be mechanically compacted. The
work of paving blocks shall be executed in line and level by skill mason offlooring work only. It should be laid
in such a way that the no cutting of the paver block to be necessary. if cutting of paverblock necessary then it
should be cut by machine only and carting. The finished surface of the paver block shall have resonablygood,
plain finished. Paver blocks shall be compacted and shall be relaid if necessary. Gravel or such type of
materials shall notbe allowedfor production.Layingon50mmthick sandbedding.
• Layingon50mmthicksandbedding.
Excavation and compaction up to 300 mm in height for footpath paving in all sorts of soil murrum
includingsorting outsandstackingofusefulmaterialsstuffupto 50mt.
The scope of work includes manufacturing, supplying, and lying of precast paver blocks at various Retail outlets.
The workincludes: Verification of the existing site condition and advising our project in charge to lay suitable
base course if required.Contractors are required to satisfy themselves with quality of sub grade, sub-base
course before the paver blocks are laid andsuggest strengthening ifrequired.
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks. Manufacturing
of paver blocks inyour plant as per requirements in technical specification enclosed. Supplying of paver blocks at
site, including handling at bothends.
Laying of paver blocks at site as per requirement in technical specification on 50 mm thick sand bedding, within
shortest possibletime the site is public place hence care should be taken to ensure that the routine activities
should not be disturbed. The job oflayingmayrequired tobe carried outduringnightalso.
TestingofpaverblocksshallthroughreputedGovt./NonGovt.Testhouseonlyandsubmissionoftestresultsasperrequir
ements in Technical Specifications. AMC reserves the right to carryout test at random. Cost for such tests to be
borne byparty. The contractor shall guarantee that all material and components designed, fabricated, supplied,
and laid by him shall befree from any type of defect due to faulty material and/or workmanship/erection for a
period of One year from the date ofcompletion ofwork.However,thecontractorone year'sshallrender
freemaintenance.
TECHNICALSPECIFICATIONS:
PaverBlockManufacturingFacilities:
ThePaverBlock shallbemadeinfactorywithfollowingminimumfacilities:
ConcreteBlockmakingMachines:
The machine shouldbe capable of producinghighqualityPaverBlocks byobtaininghighlevelof
compactionbyapplication of hydraulic compaction and also by high intensity vibration to the moulds.
The machine should haveautomaticcontrol panel
foruniformityinstrength.
ConcreteBatching&MixingPlant:(Notessential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient
should be mixed inconcrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The plant
should equipped with automaticcontrol panel formaintaining watercement ratiofrombatch to batch to
obtain concrete of uniform quality
andstrength.Theplantshouldbeequippedwithadequatemechanismformechanizedloadingofrawmaterials
andconveyorbeltfortransportationofconcretefrommixertoconcreteblockmakingmachinetomaintainqualit
Thefactoryshouldhavewelldesignedcuringareatoensureadequatecuringofpaverblocks.
Laboratory(Desirablebutnotessential):
The testing equipment should have required in the Laboratory as
perthe following:ACompression testingmachineofadequate
Othertoolsandequipmentfortestingrawmaterialsandpaverblocks.
Systematic record of test results of various paver blocks
manufactured in the factory.ConcreteMixDesignfor
variousgradeofconcreteusedformakingofpaverblocks.
SpecificationsForColouredPaverBlocks:
Coloured concrete paver blocks shall be manufactured as per attached specifications using or
approvedcolourPigmentof“BAYER”Make“BAYFERROXIRONOXIDEPIGMENTS”withminimumcolourpigme
ntof3%byweightof cement. The colour shade shall be “RED” as selected by AMC before
commencement of the work. White cement shallbe used for colored pavers to obtain the desired
colour shade. The job also includes providing 50 mm thick sand beddingto matchthe shadeofthe
Thecolourofthepaverblockshallbeguaranteedagainstfadingofcolourforperiodof12monthsfromthedateofla
yingofthe sameatsite.
Allothertechnicalspecifications&Procedurefortesting,laying&samplingofcolouredpaverswillbeasperattach
PaversBlockCharacteristics:
The concrete pavers should have perpendicularities after release from the mould and the same should
be retained untilthe laying. The surface should be reasonably smooth and of anti skid and anti glare
type. The paver should have uniformchamfers to facilitate easy drainage surface run off. The pavers
should have uniform interlocking space of 2mm to 3mmto ensure compacted sand filling after vibration
on the paver Surface. The concrete mix design should be followed foreach batch of materials
separately and automatic batching plant is to be used to achieve uniformity in strength andquality.The
pavers shall be manufactured in single layer only. Skilled labour should be employed for laying blocks
toensure line and level of laying, desired shape of the surface and adequate compaction of the sand in
the joints. Thepavers shall be of cement gray colour without any pigment & for coloured pavers refer
“specifications for colouredpave`” The pavers are to be skirted all round with kerbing using solid
concrete blocks of size 150mm X 250mm X 380mm.The kerbing should be embedded for 100mm
depth. The concrete used for kerbing shall be cured properly for 7 daysminimum.
PaverBlockDimensions:
Shape Unipaver,IshapeordirectedbyAddl.C.E.
Chamfer 4mmto6mmalongtopedges
Colour Naturalcementgreycolourwithoutuseofanypigment.
Forcolouredpaversrefer“specificationsforcolouredpavers”
DimensionalTolerance (+/-)2mmforlength&width,
(+/-)3mmforHeight(Thickness)
TestingofPaverBlocks:
SR.NO *TEST AverageValues Frequency
1. CompressiveStrength Min.35N/Sqmmfor60mm 250Smt/1Test
2. FlexuralStrength Minimum4.5N/Sqmm
3. AbrasionResistance Maximum1.5
4. WaterAbsorption Maximum5.80%
*Samplingandtestingprocedureasperenclosedspecifications
SamplingandTestingProcedureforPaverBlocks
INTERNAL–Averageofminimum3samplesper 5000Blocks.
SamplingforTesting
SamplingofPaverblocks.
Methodofsampling :
Before laying paver blocks, each designated section comprising not more than 50000 blocks, shall be divided into
tenapproximately equalgroups. Threeblocksshallbe drawnfrom each group.
Markingandidentification:
All samples shall be clearly marked at the time of sampling in such a way that the designated section of part
thereof, andtheconsignmentrepresentedbythesample,areclearlydefined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid damage to the paving
intransit. Protect the paving from damage and contamination until they have been tested. The testing shall be
carried assoon as possible, after the sample has been taken. As soon as practicable after sampling. The samples
shall be stored inwaterat20degreeC5 degreeC for24 hourspriortotesting.
The item is to be executed as per instructions and to the entire satisfaction of Engineer-in-Charge and/or his
authorizedrepresentativeusingRubbermould andTablevibratorforKerb instead ofmechanicalpresssystem.
Extra rate for excavation of asphalt payment of any thickness including demolishing the asphalt carpet, metal,
soling etc.complete with stacking the materials as directed. The road surface of asphalt shall carefully be opened
to full width asdirected by the Engineer-in-Chargeand/or hisauthorizedrepresentative.
Excavationareashallbeproperlyidentifiedandmarkedinrectangularshape.Theroadcrustshallbeopeneduptoentire
depth i.e. including soling. All the materials shall be separately deposited in such a way and in places as may
bedetermined by the Engineer-in-Charge and/or his authorized representative. In case rubble not being so
deposited orbeing mixed up with the excavated materials will not be allowed for refilling. The cost of materials
shall be charged fromthecontractor.The decision oftheC.E.shall befinal and bindingtothecontract
For detailed specification for Laying of Paver Block on sand bedding, refer R & B Department booklet for
GeneralTechnicalSpecificationforbuilding works.
Therate shallbefor aunitofSMT
Providing and laying cement concrete 1:4:8 (1- Cement :4- fine sand :8- graded brick bat aggregates 40mm
nominal size) and curingcomplete.
ModeofmeasurementsshallbeonCMTbasis
Providing and laying cement concrete 1:5:10 (1- Cement : 5- Coarse sand : 10- hand broken stone aggregates
mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth
ModeofmeasurementsshallbeonCMTbasis
ProvidingTMTBarFE500DreinforcementforR.C.C.Workincludingbending,bindingandplacinginpositioncompleteu
ptofloortwolevel.
ForrelevantSpecificationofItemasperitemdescription&instructionofEngineer-in-
Chargeand/orhisauthorizedrepresentative.
Modeofmeasurementsshall beonKgbasis.
Construction ofRCCnosingincentralvergeusingM-
200gradecementconcrete.Theitemincludescostofcentering&shuttering,reinforcement,bothsidecementplaste
rinC:M1:3mortar&curingetc.complete.Halfroundportionofthenosingshallbemadebyusingmildsteel.
Providing and laying in position Ready Mixed M-200 grade concrete for reinforced cement conctere work, using
cement content as per approved Design Mix manufactured in fully automatic batching plant and transported to
site of work intransit mixer for a lead up to 10 kms having continuous agitated mixer, manufactured as per mix
design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to
site of laying, excluding the cost of centering shuttering finishing and reinforcement including cost of admixtures
in recommended proportions as per IS:9103 to accelerate/ retard setting of concrete, improve work ability
without impairing strength and durability as per direction of theEngineer-in-charge. Without Fly Ash (Min
cement level as per latest IS456 shall be maintained) (Cement level 400 kg )
Modeofmeasurementsshall beonCMTbasis.
Provdg. Form work of ordinary timber planking so as to give a rough finish incl. centering, shuttering, strutting
and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 M &
removal of the same for in situ reinforced concrete and plain concrete work in
Modeofmeasurementsshall beon SMT.basis.
P/A Trimix with dewatering machine and floater machine on constructed RCC work incl.cost of machine and
labouretc comp as directed.
Modeofmeasurementsshall beon SMT.basis.
Making 15 mm groove in RCC work on road and filling it with polysulfiedselant and finished it good incl.alllabour
charges etc comp as directed.
Modeofmeasurementsshall beon RMT.basis.
Hiring of tractor with trolley considering 8 Hrs. as working day hours incl.Driver
Modeofmeasurementsshall beon DAY.basis.
Providing chotahathi or driver with fuel , to carry out different works during day/night for 8 hrs. shift. Work shall
be carried out as per the instructions of Engineer in charge 4 Nos of labour all necessary permit etc. comp. (For
Modeofmeasurementsshall beon SHIFT.basis.
Providing & Supplying JCB Machine on rental basis in case of emergency situation and break down type work &
also during unavoidable condition as per instruction of engg.incharge , rate includes all nece. shifting, fuel
andoperating charges and stacking of useful & non-useful materials separately up to store. (No payment should
be allowed for non working condition of machinery and for pipe line excavation and laying work)
Modeofmeasurementsshall beon HOUR.basis.
Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick work and repairing by
brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing MH sheet cover, removing the
debris from MH and carting the same as directed.
Modeofmeasurementsshall beonNOS.basis.
Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick masonry in C.M. 1:5 and
plaster in C.M. 1:3 and fixing C.I. steps and existing chamber sheet cover, removing the debris from chamber
and carting the same as directed.
Modeofmeasurementsshall beonNOS.basis.
Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
A. F.R.C. Extra HeavyDuty (EHD-35) ManholeCovers & Frames Cover : 728mm ø & 100 mm thick circular
cover, 35.00 MT load design, 100x2mm MS flat allround, 16mm ø plain round bar for lifting the cover &
should be fitted with plastic cups. Frame : 560 mm ø clear opening, outer size- 888x888x175 mm. On the
upper periphery of frame 25 x 3 mm wide MS flat should be well embed in concrete to protect the edges of
frame. FRC E.H.D.-35 manhole cover & frame described as above
B. F.R.C. Heavy Duty [HD-20] Machinehole Covers - 560 mm ø clear opening, The dimension of frame and cover
as per mentioned in Amend No.1 to IS 12592 : 2002 table
C. F.R.C. Medium Duty [MD-10] Machinehole Covers - 560mm ø clear opening, The dimension of frame and
cover as per mentioned in Amend No.1 to IS 12592 : 2002 table 1..
D. F.R.C. Medium Duty [MD-10] Chamber Covers & Frame- 600 x 450 mm clear opening, The dimension of
frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
E. F.R.C. Light Duty [LD-2.5] Machinehole Covers & Frames-560mm ø clear opening, The dimension of frame
and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
Modeofmeasurementsshall beonNOS.basis.
Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to match exisisting road level in
C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days etc. complete as directed. M.H. seat cover
will be supplied byA.M.C.(from any store)
Modeofmeasurementsshall beonNOS.basis.
Supplying, labour for break down repairing work for activities like excavation, disliting, removing debris from
trench back filling etc. comp. as directed by Eng.in charge.
Modeofmeasurementsshall beonNOS.basis.
Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt including excavation, B.B.C.C.
(1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6) with 40 mm thick IPS flooring in the prop M15 at
bottom and 15 mm thick cement plaster inside the catch pit in the proportion of CM (1:3) with outjali etc. comp.
Modeofmeasurementsshall beonNOS.basis.
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening etc. comp.. As
directed by engineer in charge.
Modeofmeasurementsshall beonNOS.basis.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site,
laying in uniform layers in sub- base / base course on well prepared surface and compacting with vibratory roller
to achieve the desired density as per Codal Provision.
Production & Supply of
worksLayingof WMM
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular material,
premixed with water, toa dense mass on a prepared sub-grade/sub- base/ base or existing pavement as the
case may be in accordance with therequirements of these Specifications. The material shall be laid in one or
more layers as necessary to lines, grades and cross-sectionsshownon the approved drawingsorasdirected
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When vibrating or
other approvedtypes of compacting equipment are used, the compacteddepth of a single layer of the sub-base
coursemay be upto 200 mmwith the approval ofthe Engineer.
PhysicalRequirements
Coarseaggregatesshallbecrushedstone.TheaggregatesshallconformtothephysicalrequirementssetforthinTable19-
Sevaliya/Timba/Ankodiyaspecialaggregateisonlyacceptable.
Ifthewaterabsorptionvalueofthecoarseaggregateisgreaterthan2percent,thesoundnesstestshallbecarriedoutonthe
materialdeliveredto site asperIS:2386 (Part-5).
Table19-1:PhysicalRequirementsofCoarseAggregatesforWetMixMacadamforSub-base/BaseCourses
S.No. Test TestMethod Requirements
1. LosAngelesAbrasionvalueorA IS:2386(Part-4) 40percent(Max.)
ggregateImpact value
IS:2386(Part- 30percent(Max.)
2. CombinedFlakinessandElongationindices(To IS:2386(Part-1) 35percent(Max.)*
* To determine this combined proportion, the flaky stone from a representative sample should first beseparated out. Flakiness index
is weight of flakystone metal divided by weight of stone sample. Only the elongated particles be separated out from the remaining (non-
flaky) stone metal. Elongation index isweightofelongatedparticlesdividedbytotalnon-
flakyparticles.Thevaluesofflakinessindexandelongationindexsofoundareaddedup
GradingRequirements
TheaggregatesshallconformtothegradinggiveninTable19-
Table19-2:GradingRequirementsofAggregatesforWetMixMacadam
ISSieveDesignation PercentbyweightpassingtheISSieve
Materialfinerthan425 micronshallhavePlasticityIndex(PI)notexceeding6.
The final gradation approved within these limits shall be graded from coarse to fine and shall not vary from the
low limit on onesievetothehighlimit ontheadjacentsieve orviceversa.
The surface of the sub-grade/sub-base/base toreceive the Wetmixmacadam courseshall be preparedtothe
specifiedgradeand camber and cleaned of dust, dirt and other extraneous material. Any ruts or soft yielding
places shall be corrected in anapproved manner and rolleduntil firmsurface isobtained.
Where the Wet mix macadam is to be laid on an existing metalled road, damaged area including depressions
and potholes shallbe repaired and made good with the suitable material. The existing surface shall be scarified
and re-shaped to the required gradeand camberbeforespreadingthe coarseaggregate forWetmixmacadam.
PreparationofMix
WetMixMacadamshouldbepreparedinanapprovedmixingplantofsuitablecapacityhavingprovisionforcontrolledad
ditionof water and forced/positive mixing arrangement like pugmill or pan type mixer of concrete batching
plant.For small quantity ofwet mixwork,theEngineermay permitthemixingtobedone in concrete mixers.
Quantityof watershouldnotvaryfrom OMC determinedas perIS : 2720 (partVIII)bymore thanagreedlimit.The
mixedmaterialshould be uniformly wetand nosegregation should be permitted.
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared
subgrade/sub-base/base inrequired quantities. In no case should these be dumped in heaps directly on the area
where these are to be laid nor shall theirhaulingover a partlycompleted stretchbe permitted.
The mix may be spread either by a paver finisher or motor grader or as per instruction of Engineer-in-Charge
and/or hisauthorized representative. For portions where mechanical means cannot be used, manual means as
approved by the Engineershall be used.The motor grader shall be capable of spreading the material uniformly all
over the surface. Its blade shall havehydrauliccontrolsuitableforinitialadjustmentsandmaintainingthesame
soasto achievethespecifiedslopeand grade.
Thepaver finishershallbeself-propelled,havingthefollowingfeatures:
(i) Loadinghoppersandsuitabledistributionmechanism
screedshallhavetampingandvibratingarrangementforinitialcompactiontothelayerasitisspreadwithoutruttingorot
herwisemarringthe surface profile.
(iii) Thepavershallbeequippedwithnecessarycontrol mechanismsoas toensurethatthefinishedsurfaceisfreefrom
surfaceblemishes.
The surface of the aggregate shall be carefullycheckedwithtemplates andall high or low sports
remediedbyremoving oradding aggregate as may be required. The layer may be tested by depth blocks during
construction. No segregation of layer
andfineparticlesshouldbeallowed.Theaggregatesasspreadshouldbeofuniformgradationwithnopocketsoffinemate
Afterthemixhasbeenlaidtotherequiredthickness,gradeandcrossfall/camberthesameshallbeuniformlycompacted,to
thefulldepthwithsuitableroller.Ifthethicknessofsinglecompactedlayerdoesnotexceed100mm,smoothwheelrollerof
100 kN weight may be used. For a compacted single layer upto 200 mm, the compaction shall be done with the
help of vibratoryrollerofminimum
staticweightof80to100kNorequivalentcapacityroller.Thespeedoftherollershallnotexceed5km/h.
In portions having unidirectional cross fall/superelevation, rolling shall commence from the lower edge and
progress graduallytowards the upper edge. Thereafter, roller should progress parallel to the centre line of the
road, uniformly over-lapping eachpreceding trackbyatleastone thirdwidthuntil theentire surfacehas
beenrolled.Alternate trips of the rollershallbeterminated instopsatleast 1m away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and backward until the
edges have beenfirmly compacted. The roller shall then progress gradually towards the centre parallel to the
centre line of the road uniformlyoverlappingeach oftheprecedingtrack by at least one-third width
untiltheentiresurfacehasbeen rolled.
Any displacement occurring as a result of reversing of the direction of a roller or from any other cause shall be
corrected at onceasspecifiedand/or removedandmade good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly
compacted with mechanicaltampers or a plate compactor. Skin patching of an area without scarifying the
surface to permit proper bonding of the addedmaterialshall notbepermitted.
Rolling should not be done when the subgrade is soft or yielding or when it causes a wave-like motion in the
sub-base/basecourse or subgrade. If irregularities develop during rolling which exceed 12 mm when tested with
a 3 metre straight edge, thesurface should be loosened and premixed material added or removed as required
before rolling again so as to achieve a
uniformsurfaceconformingtothedesiredgradeandcrossfall.Innocaseshouldtheuseofunmixedmaterialbepermitted
tomakeupthe depressions.Rolling shall be continued till the density achieved is at least 98 per cent of the
maximum dry density for thematerialasdetermined by the method outlinedin IS :2720(Part-8).
Aftercompletion,thesurfaceofanyfinishedlayershallbewell-
closed,freefrommovementundercompactionequipmentorany compaction planes, ridges, cracks and loose
material. All loose, segregated or otherwise defective areas shall be made goodto the fullthicknessofthelayer
andrecompacted.
Settinganddrying:
Afterfinalcompactionofwet mixmacadamcourse,theroadshallbeallowedtodryfor24hours.
OpeningtoTraffic
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix macadam surface till it has
dried and thewearingcourse laid.
Surface Finish and Quality
Control of WorkSurface
ThesurfacefinishofconstructionshallconformtotherequirementsofClauseinItemNo.16&17&18.
Qualitycontrol:
ControlonthequalityofmaterialsandworksshallbeexercisedbytheEngineerasperTable19-3.
Table19-3:TestandFrequencyforMaterialsforWetMixMacadam
Type Test Frequency ISCode
ofConstructi (Asper CircularNo.66)
Wet Gradation Onetestper200Cu.m. IS:2386,Part-I-1963
MixMacada AggregateImpactValue Onetestper1000Cu.m. IS:2386,Part-IV
Combined Flakiness Onetestper500Cu.m. IS:2386,Part-I
andElongationIndices
Atterberg Limits of portion Onetestper200Cu.m. IS:2720,Part-V
ofaggregatespassing
Densityofcompactedlayer Onesetofthreetestsper IS:2720,Part-VIII
RectificationofSurfaceIrregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances or where the
course isotherwise defective due to subgrade soil getting mixed with the aggregates, the full thickness of the
layer shall be scarified overthe affected area, reshaped with added premixed material or removed and replaced
with fresh premixed material as applicableand recompacted. The area treated in the aforesaid manner shall not
be less than 5 m long and 2 m wide. In no case shalldepressionsbefilledup withunmixed andungraded materialor
ArrangementforTraffic
Duringtheperiodofconstruction,arrangementsforthetrafficshallbeprovided.TheContractorshalltakeallnecessarym
easures for the safety of traffic during construction and provide, erect and maintain such barricades, including
signs, marking,flags, lightsand flagmenasper instruction oftheEngineer-in-charge.
MeasurementsforPayment
Therateshallbe foraunit ofonecubic meter.
A. Labour work for fixing interlocking blocks / any kind of pavement on up to 50 mm thick sand bedding,
levelling,watering and fixing in line & level as well cleaning the site etc.comp. as
B. directed.(AMC approved Rate )
Therateshallbe foraunit ofRMT/SMT BASIS.
Labour work of fixing kurb any design of central verge, (both side) footpathkurb, itemsincludes necessary
excavation, asphalt cutting of any thickness, erecting in line and position and pointing with cement mortar
(1:3), watering, etc complete, filling with zari along the side of the kurb, the kurb stone fix prepared with
bitumnious top surface, as directed by engineer
Therateshallbe foraunit ofRMT BASIS.
Providing and supplying ISI Standard RCC pipes (of sulphate resisting Cement )in standard lengths of following
class and diameter suitable for rubber ring joints (socket and spigot) including all taxes,insurance,
transportation,treightcharges,octroi,inspection charges, loading,unloading, conveyance to departmental stores,
stacking etc. complete (GWSSB SOR 2021-22) Therateshallbe foraunit ofRMT BASIS.
Lowering, laying and jointing R.C.C. pipes in C.M.1:1 1/2 of following diameters in proper position , grade and
alignment at all level as directed by Engineer-in- charge including conveyance from stone to site of work,
labour giving hydraulic testing as per ISI code. (GWSSB SOR 2021-22)
Therateshallbe foraunit ofRMT BASIS.
Removing and refixing of kerb Removal of existing kerb stones of any type, any size, any thickness in
safe manner with base PCC including excavation etc and refix the same as desired location as per drawing and
as directed by Engineer in charge. Rate shall be inclusive of removing with all subbase (including excavtion),
refixed the same (approved before reuse) on existing base PCC, addition kerb of same profile (if required and
shall be paid relevant tender item), disposal unserviceable material with all lifts and up to any lead at non
objectional place and stacking the serviceable material (paver) upto AMC store including loading, unloading as
directed by Engineer-in-charge.
Therateshallbe foraunit ofRMT BASIS.
Filling of Zari along the sides of the kerbstone fixed, prepared with Bituminous Concrete mixed in proper
proportion as directed by Engineer- In - Charge to form a pourable mixture. (Street Devlopment of Dehgam
Cinema road tender).
Therateshallbe foraunit ofRMT BASIS.
Pre cast Cylindrical Bollard Providing and fixing cylinder pre cast bollard with exposed/ fairfinished made in M-30.
Bollard is precast with cement concrete of M-30 grade by providing 4 no of 12 mm dia. tor steel by vibro compaction
method using FRP/steel mould for achiveshutttring finish as directed and approved by EIC. Sample shall be
approved. Approximate size of bollard is 900 to 1000mm height x 225 to 300mm dia. Rate shall be inclusive of
concrete, reinforcements as stated in the item description, necessary moulds, pouring, placing, compaction,
necessary curing, all accessories required for fixing, with all taxes, transportation, loading and unloading charges.
Additional reinforcement, if any shall be measured and paid for in the relevant tender item. The rate shall also
include for erecting and fixing the pieces in position etc complete as per drawing. The rate shall also include the cost
of excavation, base PCC M15 grade and finish good, curing etc complete as directed by engineer in charge.(C G Road
Therateshallbe foraunit ofNO. BASIS.
Providing and laying for approved for approved quantity (ISO certified Brand) floor Harderner @ 3.0 Kg/Smt
ThecolourandworkmanshipshallbeinaccordancewiththeCodeofPracticeforpainting,andasspecifiedinthedrawingsor
asdirected bythe Engineer
Materials:SyntheticenamelpaintshallconformtoIS.
The materials required for work of painting work shall be obtained directly from approved manufacturers or
approved dealer andbrought tothesite in maker'sdrums, kegsetc.withseal unbroken.
All materials not in actual use shall be kept properly protected, lids of containers shall be kept closed and
surface of paint in openor partially open containers covered with a thin layer of turpentine to prevent formation
of skin. The materials which havebecome stale or flat due to improper and long storage shall not be used. The
paint shall be stirred thoroughly in its containerbefore pouring into small containers. While applying also the
paint shall be continuously stirred in smaller container. No left overpaint shallbeput back intostocktins.When
not in use, thecontainersshallbekept properly closed.
Ifforanyseasons,thinningisnecessary,thebrandofthinnerrecommendedbythemanufacturershallbeused.
The surface to be painted shall be thoroughly cleaned and dusted. All rust, dirt and grease shall be thoroughly
removed beforepainting is started. No painting on exterior or other exposed parts of the work shall be carried
out in wet, damp of otherwiseunfavorableweatherand all thesurfacesshallbe thoroughly dry beforepainting
work isstarted.
Brushing operations are to be adjusted to the spreading capacity advised by the manufacture of particular paint.
The paint shallbe applied evenly and smoothly by means of crossing and laying off. The crossing and laying off
consists of covering the area overwith paint, brushing the surface hard for the first time over and then brushing
alternately in opposite directions two or threetimesand thenfinally brushing lightly in directionat rightanglesto
In this process, no brushmarks shallbe left afterthe laying off isfinished. The fullprocess of crossing and laying
offwillconstituteone coat.
Each coat shall be allowed to dry completely and lightly rubbed with very fine grade of sand paper and loose
particles brushed offbefore next coat is applied. Each coat shall vary slightly in shade and shall be got approved
from Engineer-in-charge before nextcoat isstarted.
Each coat except the last cost shall be lightly rubbed down with sand-paper of fine pumice stone and cleaned of
dust before thenext coat is applied. No hair marks from the brush or clogging of paint puddles in the corners of
panels angles of mouldings etc.shallbe lefton the work.
Approvedbestqualitybrushesshallbeused.
Modeofmeasurements&payment:
AnytypeofC.C.Centralvergescurbssurfaceshallbe measuredunderthisitem.
All theworkshall be measurednot inthe decimalsystemas executedsubject to thefollowing limits unless
otherwisestatedhereinafter:
(a) dimensionsshallbemeasuredtothenearest0.01metre.
(b) Areasshallbeworkedouttothenearest0.01Sq.metre.
No deductions shallbe madeforopenings not exceeding0.5 sq.mt. eachandnoadditionshallbe madeforpainting
tobeadings,mouldings, edges,jambs, soffits,etc. ofsuchopening.
Thedifferentsurfacesshallbegroupedintoonegeneralitem,areasofunevensurfacebeingconvertedintoequiv
alentplain areasinaccordancewiththemode ofmeasurementforpayment.
The rate shall be for a
unit of one SMT..
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER STANDARD P.W.D.
TECHNICAL SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE BOOK OF THE SAME) AND AGREE TO
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE, SPECIFICATION
GIVEN BY THE ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY
SealandSignatureoftheBidder Add.CityEngineer(WestZone)
AmdavadMunicipalCorporation
ybœtJtœBgwÂlÂmvjftuvtuohuNl
bntldhmuJtmœl–vrùbÍtul
vrùbÍtulÍtuljytuVem,
1. Wvhtuf<xuLzhtusu<u JdobtkbtLghSMx[uNl ^htJ<t ftuLx[tfxh©eytuyuChJt.
2. xuLzhlerlg<xuLzh Ve <&t R.yub.ze. ck^ fJhbtkkWvhltmhltbuÁcÁ / hSMxhyu.ze./MvezvtuMx/
fwhegh&erlg<mbgbtkbtufjJtlthnuNu.
3. ftuLx[tfxh©eytuyuxuLzhlemt&uBGþrlrmvjbtLghSMx[uNlle/ dJobuLxhSMx[uNlleftuve, (xuLzhftuve<&t yLgvwhtJtmt&u)
yawfmtbujfhJtlehnuNuylufJhWvhxuLzhlkch<&t ftuLxufxlkchsYhMvМNtoJJtltu hnuNu.ck^ fhJhWvhxuLzhltuxemlkch,
xuLzhlkch, ftblwkltb<&t, ftuLx[[tfxhlemkM&tlwkltb<&t ftuLxufxlkchyJ~gœNtoJJtlthnuNu. ftuLx[tfxhtuyuxuLzhbtcukflwltb,
Ft<t lkch, btRfhlkchylumhltbwMvÐyûthtubtkjFJw.
4. xuLzh Ve vu ytuzoh / zebtLzz[tVx&eaqfJJtlehnuNu. œhufxuLzhœeXyjdxuLzhxuLzhVeChJtlehnuNu.
5. ytuAehfblexuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltltxuLzhtuhœct<j (fuLmj) dKtNu.
6. xuLzhmt&uBþfJtbtkytJ<e yluoMxble, xuLzhlehfblt 1% «btKucukfduhLxe / zebtLzz[tVx / vu ytuzoh / jtufjbtRfhauf&e s
MJefthJtbtkytJNu. œhufxuLzhœeXyjdR.yub.ze. ChJtlehnuNu. R.yub.ze. hfbYt.
yuffhtuzmwDeleykœtS<hfbltftbbtxujtufjbtRfh auf, rzbtLzz[tVx, vu ytuzoh fu cukfduhkxeltMJYvbtk<&t Yt.
yuffhtuz&eWvhleykœtS<hfbltftbbtxuR.yub.ze.lehfbbtºtrzbtLzz[tVx, vu ytuzoh fu ckufduhkxeltMJYvbtkytvJtlehnuNu.
7. cukfduhuLxebtºtybœtJtœNnuhle s MJefthJtbtkytJNu.
8. xuLzh Ve <&t R.yub.ze.lehfbltze.ze./auflevtA¤ ftuLx[tfxh©eyuvtu<tlemkM&tlwkltb<&t
btuctRjlkchyJ~gjFJtltuhnuNu. ftuLx[t¾xhu vtu<tlemkkM&tlt auf <&t ze.ze. xuLzhR~gw><theFctœlt s ytvJt.
9. Nh<e xuLzhtuhœct<j dKtNu.
10. stuxuLzhbtkMvÐWÕjuFfhtgujntug<tuatubtmtlufthKu Ft<tfegMËaltyLJgußgthußgthuftb ck^ htFJtLþk&tg<u
mbgluftbleBþÆ<btkbshuytvJtbtkytJNu. vhkðþytyLJguftuECtJJ^thtuytvJtbtkytJNulne. suleltuk^ >hufxuLzhhujuJe.
11. xuuLzhtuftuEvKfthKytÃgtrmJtgMJefthJt fu lrnkMJefthJt<ule mkÃËKom•ttBGþrlrmvjfrbNlh©elehnuNu.
12. xuLzhbtkstuftuRmwDthtJDthtntug<tu<u ykdxuLzh Ch<t vnujtAuÕjuœJmurlg<JucmtRxy&JtfauheyusYhe<vtmfhelu s
13. mefgtuhexezevtuÍex/ vVtuboLmduhuLxelehfbYt. yuffhtuzmwDeleykœtS<hfbltftbbtxujtufjbtRfh auf, rzbtLzz[tVx, vu ytuzoh
fu cukfduhkxeltMJYvbtk<&t Yt. yuffhtuz&eWvhleykœtS<hfbltftbbtxumefgtuhexezevtuÍex/
vhVtuboLmduhkxelehfbbtºtrzbtLzz[tVx, vu ytuzoh fu ckufduhkxeltMJYvbtkytvJtlehnuNu.
14. ytuljtRlyul-«tufgwhJucmtRxvh&eChJtlt&<t xuLzhbtkftuLx[tfxh/
yusLmeyuxuLzhlentzoftuvebtkCtJCgtoJdhlemnemefftfhemcbexfhJtlehnuNu.
stu<ubtkCtJChujnNu<tu<uJtxuLzhhœfhJtbtkytJNu.
15. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu
zebtLzz[tVx / auf “BgwÂlÂmvjfÂb§h©e, ybœtJtœ” ltltbltufZtJJtu.
ybœtJtœBgwÂlÂmvjftuvtuohuNl
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtkJfoytuzhytÃgtctœftb NY fhJtlembgbgtoœtbtkftuLx[tfxhîthtftb NY
fhJtleòKfgtoctœ 24 fjtfltftb NY
lrnfhJtbtkytJu<tuyLgftuLx[tfxhvtmubtfuoxhux&eftuLx[tfxhltFaouylustuFbuftbdehefhtJJtbtkytJNu.
2. ftuLx[tfxhluJfoytuzohytÃgtctœ yu.yth.me. «fthlkwxuLzhntuRftblesYhegt<bwscxujeVtulefòKfhesu<u
ftb NY fhJtfnuJtbtkytJNuylusuftbleòKfgtolt 24 fjtfbtk NY
fhJtbtklrnytJuylurlg<mbgbgtoœtbtkvwKofhJtbtklrnytJu<tusu<u ytRxbltSOR CtJ&e
dKevulÕxeJmwjjuJtbtkytJNu.
3. ºtK fu J^wJthWvhbwscleyLgftuLx[tfxhvtmu&eftbdehefhtJJtleVhsvzNuylu/y&Jt ºtK fu
J^wJthvulÕxefhJtleVhsvzNu<tu<u mkstudtubtkftuLx[tfxhluçjufjeMxfhJtbtkytJNusuleykr<b m•tt
Bgw.frb¹lh©elu hnuNu.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour
Prohibition and Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide
lines. If child labour is employed on the site work, the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw
enty thousand only) in the child labour welfare fund. If the employer refuses to deposit then action will be taken for
contempt of Supreme Court Judgement and also will be prosecuted by concerned authority. Because of the breach
of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal Corporation
becomes liable to pay any amount then the Municipal Corporation shall recover the said amount from the
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No.
1783 Date 06--02-97, but the Municipal Corporation Board has recently decided that the actual testing charge is
taken and the remaining amount is refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to
follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain
regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C.
The same shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the
tender duly signed. These shall form a part of tender. The tenderer shall not add or amend the text of any of the
documents except in so far as may be necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the
contract documents. The full consideration shall be given to such addendum or corrigendum or correction before
submission tender duly filled in by the contractor. Therefore, the contractor shall have to watch such addendum or
corrigendum or correction published by A.M.C through its website www.egovamc.com. Tenderes shall verify the
number of addendum issued and enclose the same with the tender documents,failing which the tender shall be
liable for rejection and no any complaint in respect to this shall be entertained under any circumstances.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP ( West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
PERCENTAGE RATE TENDER AND CONTRACT FOR WORKSADDITIONAL INSTRUCTIONS TO PERSONS
1. Competency of Tendered: No contract will be awarded except to responsible bidder capable for
performing the class of work completed. Before the award of the contract, any bidder may be required to
show that he has the necessary facilities, experience, ability and financial resources to perform the work
in satisfactory manner within the time stipulated. Contractor may be required to furnish the department
with the statement as to their experience and their financial status.
2. Tenderer will be deemed to have inspected the site and to have satisfied himself as to the nature of all
works, all existing roads water - way and other means of communication and access to and from the
site of work and the building that may be required for temporary purpose in connection with the
construction, completion and maintenance fo the works and must make his own enquiries as to work
yard, sites, depot and dumps and as to the acquisition of such additional sites and areas as may be
necessary for temporary purpose for constructing, completing and maintaining the works.
3. Payment: - The tenderer must understand clearly the rates quoted are for completed works and include all
cost due to labour, scaffolding plant, supervision, service work, power, royalties and octroi etc. and include all
extras to cover the cost of night work if an when required. No claim for additional payment beyond the prices
or rates quoted will be entertained and the tender will not be entitled subsequently to make may claim on the
ground of misrepresentation or on the ground that he was supplied with information given by any person
(whether the member is the employee of Engineering Department of Corporation or not). Any failure on his
part to obtain all necessary information for the purpose of making his tender and filling the several prices and
rates therein shall not relieve him from any risks or liabilities arising out o, or consequent upon the submission
4. Tender Forms: - the tenderer must fill up every blank in the form of tender and in the schedule and he must
return the documents sent here with.
5. Erasures: - Persons tendering are informed that no erasures of alternations by them in the text of the
documents sent herewith will be allowed and any such erasures or alternations will be disregarded. If there is
any error in writing no over-writing should be done, the wrong words or a figure should be struck out and the
correct one written above or near it in unambiguous way, each correction should be initialed.
TENDER CONDITION FOR ARC CONTRACTOR OF FOORTPATH
SCHEDULE OF MAINTANANCE WORK OF RCC ROAD AND PAVER BLOCK &
(1) THE AGENCY WILL HAVE TO CONDUCT A SURVEY AS PER SCHEDULE ACCORDING TO AREA AND INFORM
THE AHMEDABAD MUNICIPAL CORPORATION OFFICER .
(1) THE AGENCY WILL HAVE TO DEPLOY LABOUR GANG / GANGS WITHIN 24 HOUR OF SITE
SHOWN BY THE AMC OFFICER .
(2) THE AGENCY WILL HAVE TO START THE WORK WITHIN 24 HRS AFTER SHOWING THE
SITE BY THE AMC OFFICER
(3) THE AGENCY WILL HAVE TO START THE WORK AS PER THE INSTRUCTION OF THE AMC
OFFICER FROM THE NEXT DAY , OTHERWISE I THE WORK STARTED LATE , A PENALTY OF
RS.500/ DAY WILL BE IMPOSED.
(4) IF THE AGENCY IS ASKED BY THE AMC OFICER TO EXECUTE ANY ADDITIONAL WORK
OTHER THAN THE SCHEDULE , THE ADDITIONAL WORK WILL HAVE TO BE DONE BY
ANOTHER LABOUR GANG AS PER REQUIREMENT .
(5) IF THE QUANTITY OF WORK TO BE DONE AS PER THE SCHEDULE IS HIGH , THE WORK
WILL HAVE TO BE DONE AT ALL LOCATIONS SIMULTANEOUSLY WITH DIFFERENT GANGS
(6) DURING FESTIVALS LIKE HOLI, RAKSHA BANDHAN , JANMASHTAMI AND DIWALI , AT
LEAST ONE LABOUR GANG WILL HAVE TO BE KEPT AVAILABLE.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP ( West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 30.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .