Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹72.2 LFinancial bid opened Consultancy services to carry out the feasibility study and preparation of detailed Project Report for Construction of Culverts and Fencing between BP No. 219/40-R to 231/6-S 28.305 KM at Malda District, West Bengal along Indo-Bangladesh Border (IBB) | Consultancy services to carry out the feasibility study and preparation of detailed Project Report for Construction of Culverts and Fencing between BP No. 219/40-R to 231/6-S 28.305 KM at Malda District, West Bengal along Indo-Bangladesh Border (IBB) | ₹72.2 L | L1 | Financial bid opened |
| 2 | L2₹78.9 L+₹6.8 L (9.39%) Consultancy services to carry out the feasibility study and preparation of detailed Project Report for Construction of Culverts and Fencing between BP No. 219/40-R to 231/6-S 28.305 KM at Malda District, West Bengal along Indo-Bangladesh Border (IBB) | Consultancy services to carry out the feasibility study and preparation of detailed Project Report for Construction of Culverts and Fencing between BP No. 219/40-R to 231/6-S 28.305 KM at Malda District, West Bengal along Indo-Bangladesh Border (IBB) | ₹78.9 L+₹6.8 L (9.39%) | L2 | - |
| 3 | L3₹86.4 L+₹14.3 L (19.8%) Consultancy services to carry out the feasibility study and preparation of detailed Project Report for Construction of Culverts and Fencing between BP No. 219/40-R to 231/6-S 28.305 KM at Malda District, West Bengal along Indo-Bangladesh Border (IBB) | Consultancy services to carry out the feasibility study and preparation of detailed Project Report for Construction of Culverts and Fencing between BP No. 219/40-R to 231/6-S 28.305 KM at Malda District, West Bengal along Indo-Bangladesh Border (IBB) | ₹86.4 L+₹14.3 L (19.8%) | L3 | - |
| 4 | - | - | - | - | |
| 5 | - | - | - | - |
| Sl No | Description | Qty | Unit | Sharma Construction L2 | Altatech Infrahydro Private Limited L1 | C. E. Testing Company Pvt. Ltd. L3 |
|---|---|---|---|---|---|---|
| 1 | Consultancy services to carry out the feasibility study and preparation of detailed Project Report for Construction of Culverts and Fencing between BP No. 219/40-R to 231/6-S 28.305 KM at Malda District, West Bengal along Indo-Bangladesh Border (IBB) | - | - | -13.69 ₹78,93,049.5 | -21.1 ₹72,15,405 Lowest | -5.5 ₹86,42,025 |
Tender Value
₹91.5 L
EMD Value
₹1.8 L
Closing Date
19 Nov 2024, 3:00 pmClosed
EE(C ), BFD-VII, Murshidabad
RANJAN CHAKRABORTY
BFD-VII, IBBZ-I, Cossimbazar, Murshidabad
Consultancy services to carry out the feasibility study and preparation of detailed Project Report for Construction of Culverts and Fencing between BP No. 219/40-R to 231/6-S 28.305 KM at Malda District, West Bengal along Indo-Bangladesh Border (IBB) Subwork/Packages: same as main work
94281
10/EE/NIT/BFD-VII/2024-25
OPEN
Consultancy Services
NCB
10 months
Maldah, West Bengal
4 documents required · 4 mandatory
₹1.8 L
Not Applicable
19 Nov 2024
12 Nov 2024
19 Nov 2024
19 Nov 2024
19 Nov 2024
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT+Hydrological+andTopographical+Survey+Malda.pdf
document • 20.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .