Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.2 LAccepted-AOC | 1 | Accepted-AOC accept | |
| 2 | 2₹7.2 L+₹6,050 (0.84%)Rejected-Finance | 2 | Rejected-Finance 2 | |
| 3 | 3₹7.5 L+₹29,600 (4.13%)Rejected-Finance | 3 | Rejected-Finance 3 | |
| 4 | 4₹7.7 L+₹49,850 (6.96%)Rejected-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | 4 | Rejected-Finance 4 | |
| 5 | 5₹7.9 L+₹72,240 (10.1%)Rejected-Finance | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | M/S SUMAN ENTERPRISES L8 | M/S FAIR CONSTRUCTION L1 | MITTAL BROTHERS L2 | M/S BHASKAR SHARMA CONTRACTOR L3 | Rajiv Stone Supplier L7 | M/S BUNESH CHOUDHARY L5 | GOMATINETRA CONSTRUCTIONS L4 | M/S SHIVAM SINGH CONTRACTOR L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismentling R.C.C including Stacking of Dismentaled Material with in 60 M Distance including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 2.6 | Cum | 600 ₹1,560 | 300 ₹780 | 500 ₹1,300 | 200 ₹520 | 495 ₹1,287 | 100 ₹260 Lowest | 300 ₹780 | 200 ₹520 |
| 2.00 | Dismentling R.B.Work including stacking of material within 60 Metre including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 10 | Cum | 500 ₹5,000 | 200 ₹2,000 | 500 ₹5,000 | 200 ₹2,000 | 378 ₹3,780 | 100 ₹1,000 Lowest | 300 ₹3,000 | 300 ₹3,000 |
| 3.00 | Earthwork in excavation in foundation in ordinary soil including all lead and lift with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 126 | Cum | 100 ₹12,600 | 40 ₹5,040 Lowest | 60 ₹7,560 | 40 ₹5,040 Lowest | 72 ₹9,072 | 50 ₹6,300 | 50 ₹6,300 | 50 ₹6,300 |
| 4.00 | Providing and laying C.C 1:3:6 with coarse sand aggregate in foundation with all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 25 | Cum | 6,200 ₹1,55,000 | 4,700 ₹1,17,500 | 4,500 ₹1,12,500 | 5,100 ₹1,27,500 | 5,115 ₹1,27,875 | 4,000 ₹1,00,000 Lowest | 4,200 ₹1,05,000 | 5,000 ₹1,25,000 |
| 5.00 | Brick (M-100) Work in 1:4 cement, coarse sand mortar i/c cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 62 | Cum | 5,700 ₹3,53,400 | 4,750 ₹2,94,500 | 4,800 ₹2,97,600 | 4,700 ₹2,91,400 Lowest | 5,500 ₹3,41,000 | 5,700 ₹3,53,400 | 5,100 ₹3,16,200 | 5,500 ₹3,41,000 |
| 6.00 | Centering and shuttering for C.C. work including all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 29 | Sqm | 575 ₹16,675 | 100 ₹2,900 Lowest | 550 ₹15,950 | 400 ₹11,600 | 468 ₹13,572 | 200 ₹5,800 | 250 ₹7,250 | 500 ₹14,500 |
| 7.00 | Centering and shuttering for R.C.C work including all Cost of Material, Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 38 | Sqm | 800 ₹30,400 | 120 ₹4,560 Lowest | 550 ₹20,900 | 400 ₹15,200 | 612 ₹23,256 | 400 ₹15,200 | 250 ₹9,500 | 600 ₹22,800 |
| 8.00 | 12.5 mm Cement Plaster on brick masonry in 1:4 C.M. including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 66 | Sqm | 200 ₹13,200 | 100 ₹6,600 Lowest | 120 ₹7,920 | 150 ₹9,900 | 147 ₹9,702 | 150 ₹9,900 | 700 ₹46,200 | 100 ₹6,600 Lowest |
| 9.00 | Providing and laying R.C.C 1:1:2 with coarse sand & aggregate including mechanical mixing and all Cost of Material, Labour and T&P But excluding cost of steel reinforcement complete all as specified and as directed by Engineer-in-charge. | 17 | Cum | 9,000 ₹1,53,000 | 8,500 ₹1,44,500 | 6,400 ₹1,08,800 | 6,000 ₹1,02,000 Lowest | 7,712 ₹1,31,104 | 7,000 ₹1,19,000 | 6,400 ₹1,08,800 | 8,000 ₹1,36,000 |
| 10.00 | Providing and laying C.C 1:2:4 with coarse sand & aggregate including mechanical mixing and all Cost of Material, Labour and T&P But excluding cost of steel reinforcement complete all as specified and as directed by Engineer-in-charge. | 6 | Cum | 6,900 ₹41,400 | 5,400 ₹32,400 | 5,000 ₹30,000 Lowest | 5,100 ₹30,600 | 5,812 ₹34,872 | 5,500 ₹33,000 | 5,200 ₹31,200 | 6,500 ₹39,000 |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
22 Aug 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
U.M.B.C.D.G.C. Khurja
Construction of V.R.B.
2025_UPIDC_1065054_3
08/E.E./2025-26
Open Tender
Civil Works
Item Rate
90 days
U.M.B.C.D.G.C. Khurja
Please refer Tender documents.
3 documents required · 3 mandatory
₹866
₹20,000
18 Oct 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .