| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.0 LAdmitted-Finance | ₹60.0 L | L1 | Admitted-Finance |
| 2 | L2₹74.5 L+₹14.5 L (24.2%)Admitted-Finance | ₹74.5 L+₹14.5 L (24.2%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not qualified as per conditions of NIT and SBD |
| Sl No | Description | Qty | Unit | Trans Electro L1 | SHREE ABIRAMI ENGGINEERING WORKS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00Design,Engineering, Manufacture,workshop testing, supply including packing and forwarded, transportation, delivery at site storage charges of main equipment. | |||||
| 1.01 | Supply of new HV Bushing 145KV | 3 | No. | 2,15,000 ₹6,45,000 | 2,01,780 ₹6,05,340 Lowest |
| 1.02 | Supply of new HV Neutral Bushing type | 1 | No. | 55,000 ₹55,000 Lowest | 80,712 ₹80,712 |
| 1.03 | Supply of new LV Bushing type 36KV | 3 | No. | 75,000 ₹2,25,000 Lowest | 80,712 ₹2,42,136 |
| 1.04 | Supply of new LV Neutral Bushing type 36KV | 1 | No. | 75,000 ₹75,000 Lowest | 80,712 ₹80,712 |
| 1.05 | TJB along with WTI and OTI and M.Box ground mounting | 1 | No. | 34,500 ₹34,500 Lowest | 1,71,513 ₹1,71,513 |
| 1.06 | Breathers for transformers | 2 | No. | 7,500 ₹15,000 Lowest | 10,089 ₹20,178 |
| 1.07 | Cooling fan | 7 | No. | 9,500 ₹66,500 Lowest | 30,267 ₹2,11,869 |
| 1.08 | COPS Conservator | 1 | No. | 55,000 ₹55,000 Lowest | 2,82,492 ₹2,82,492 |
| 1.09 | External Paint | 30 | Ltrs | 1,550 ₹46,500 | 403.56 ₹12,106.8 Lowest |
Tender Value
₹60 L
EMD Value
₹1.2 L
Closing Date
12 Aug 2025, 4:00 pmClosed
Office of Executive Engineer, TLMD-V, JKPTCL, Ambe
Office of Executive Engineer, TLMD-V, JKPTCL, Ambedkar Chowk, Jammu
Overhauling of 50MVA Power Transformer-I at 2x50MVA, 132/33 KV Grid Station Bari-Brahmana-II
2025_PDD_282040_1
e-NIT No TLMD-V/J/05 OF 2025-26 Dated 22-07-2025
Open Tender
Electrical Works
Turn-key
180 days
Bari-Brahmana
as per NIT and SBD
2 documents required · 2 mandatory
₹2,360
Executive Engineer, TLMD-V, Jammu
₹1.2 L
Office of Executive Engineer, TLMD-V, JKPTCL, Ambe
22 Sept 2025
22 Jul 2025
18 Aug 2025
23 Jul 2025
12 Aug 2025
23 Jul 2025
25 Jul 2025
Amount
Design,Engineering, Manufacture,workshop testing, supply including packing and forwarded, transportation, delivery at site storage charges of main equipment.
Supply of new HV Bushing 145KV
Supply of new HV Neutral Bushing type
Supply of new LV Bushing type 36KV
Supply of new LV Neutral Bushing type 36KV
TJB along with WTI and OTI and M.Box ground mounting
Breathers for transformers
Cooling fan
COPS Conservator
External Paint
Internal Oil Resistant paint
Gasket
Set of Gasket(Nitrile+cork)
Set of valves
Bucholz Relay
Fresh Transformer Oil
Erection charges for supply of material for 132/33 KV BHEL Make Transformer rates are adopted as per LOA TLMD-II/JKPTCL/J/5247-50 dated 04-01-2024.
New HV Bushing 145KV
New HV Neutral Bushing type
New LV Bushing type 36KV
New LV Neutral Bushing type 36KV
TJB along with WTI and OTI and M.Box ground mounting
Breathers for transformers
Cooling fan
COPS Conservator
Gasket
Set of Gasket (Nitrile+cork)
Set of valves
Labour cost for inspection and repair /overhauling of 50MVA,132/33KV (BHEL make) power-Transformer rates adopted as per LOA TLMD-II/JKPTCL/J/5247-50 dated 04-01-2024.
Erection of temporary shed for dehydration of Transformer
Draining of complete oil i.e. 22400 L from the Transformer for carrying out Internal inspection and for replacement of all the gaskets of Transformer and filling of Nitrogen Gas in Main tank with the pressure of 0.4Kg/sq cm .
Dismantling of transformer Accessiories such as Bushings, bushing turrets, Pipe lines, Inspection covers, OLTC chamber covers, Radiator plugs for replacement of worn out gaskets with new one.
Cleaning of Transformer, dehydration of Transformer including use of vacuum pumps, filling of drained transformer oil, and fresh oil after filtration and obtaining accurate BDV values.
Erection of all Transformer Accessories as Bushings, bushing turrets, Pipe lines, Inspection covers, OLTC chamber covers Radiator plugs after replacement of worn out gaskets with new one and replacement of bucholz relay, PRV, magnetic oil level gauge , prismatic oil level gauge, temperature indicators (OTI and WTI), cooling fans, relay and contactor,etc after painting of Complete Transformer (with Zinc Chromate metal primer, epoxy paint of shade IS-631)
Misc. Works such as dismantling of jumpers/connectors and reconnection of same after carrying out job, testing of transformer, carriage/transportation of Filtration Plant, oil storage tanks their loading and unloading at site(L/S).
Repairing or overhauling of motor in Driving Mechanism of OLTC
Making RTCC Panel functional, checking cables,remote temperature indicators (WTI,OTI) in RTCC panel.Checking local and remote operation along with AVR relay and other allied works.
Checking repairing and functional auto control operation of cooling fans by way replacement of main switch,contactors, relay and placing new wiring in the existing old/replaced fan control cubical.
Final erection check and conducting various pre-commissioing tests on the transformer including DGA,BDV of oil,PPM , C and tan delta of oil , bushings and windings,interfacial tension, sludgde ratio test, short circuit test,winding resistance, insulation resistance etc for successful commissioning of transformer after repair/overhauling of the transformer
Write back of whole deteriorated transformer oil to the bidder
SHREE ABIRAMI ENGGINEERING WORKS PRIVATE LIMITED (BID ID -2439894)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .