| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | L1 | Accepted-AOC Lowest Tender | |
| 2 | L2₹35,767.35−₹3.0 L (89.4%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest | |
| 3 | Rejected-Technical | - | Rejected-Technical L6 | |
| 4 | Rejected-Technical | - | Rejected-Technical L8 | |
| 5 | Rejected-Technical | - | Rejected-Technical L5 |
Tender Value
₹3.8 L
EMD Value
₹9,600
Closing Date
3 Aug 2021, 5:00 pmClosed
Chief Executive Officer
KASRS, Kottakkal
Construction of Badminton court and Retaining WALL FOR mens hostel
2021_DAME_431000_1
A4-547-/2021/KASRS-1
Open Tender
Civil Works - Others
Item Rate
90 days
Kottakkal
Please refer Tender documents.
7 documents required · 7 mandatory
₹800
₹9,600
Yes
20 Oct 2021
19 Jul 2021
5 Aug 2021
19 Jul 2021
3 Aug 2021
19 Jul 2021
Amount
Construction work
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge: All kinds of soil
Centering and shuttering including strutting, propping etc. and removal of form for all heights : Lintels, beams, plinth beams, girders, bressumers and cantilevers
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : "1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size).
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) : Flush/ Ruled pointing
Steel reinforcement for R.C.C. work including straightening, cutting , bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500 D or more.
Filling with Quarry Muck ,filling up low lying and water logged areas with local material / quarry muck,spreading in layers leveling the top at site and consolidation by ramming,etc complete for impoving CBR value of subgrade.
P. P. SIRAJUDHEEN
SULFIKKER ALI KK
NAJEEB PM
MOHAMMED FIROS K
ABDUL MAJEED T
Shaji KM
JAFER P
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_611753.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .