Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC GRAM BHARATPUR UGAPUR ORAI JANPAD BHADOHI | ₹10.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹10.3 LRejected-AOC BHADOHI | UTTAR PRADESH | 221301 | ₹10.3 L | L2 | Rejected-AOC Accepted |
| 3 | L3₹11.2 LRejected-AOC GRAM JAMUNIPUR COLONY BIDA BHADOHI DISTRICT BHADOHI | ₹11.2 L | L3 | Rejected-AOC Accepted |
| 4 | L4₹12.6 LRejected-AOC M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹12.6 L | L4 | Rejected-AOC Accepted |
| 5 | L5₹13.0 LRejected-Finance | ₹13.0 L | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | M/S KAMLA COMNUCATION L2 | M/S BADRI SINGH L4 | RAM PYRE SINGH L3 | VIRAT BANDHU CONSTRUCTION L1 | CHIRANJIV CHAUHAN L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00A | ||||||||
| 1.01 | Prepration of subgrade excluding cost of earth work including cost of labour and T&P, etc. charges etc complete | 98.49 | sqm | 14.8 ₹1,457.65 | 13 ₹1,280.37 | 12 ₹1,181.88 | 10.66 ₹1,049.90 | 14 ₹1,378.86 |
| 1.02 | Earth work in foundation in dry ordinary soil (Loam, clay or sand) including lift upto 1.50m and lead upto 30 m and including filling, watering and ramming of excavated earth. | 103.75 | cum | 118 ₹12,242.50 | 90 ₹9,337.50 | 100 ₹10,375 | 84.96 ₹8,814.60 | 112 ₹11,620 |
| 1.03 | Laying C.C. 1:4:8 with coarse sand dala stone grit of 20-40mm size including cost of all material, labour and T&P etc. required for proper completion of work. | 28.05 | cum | 4,900 ₹1.4 L | 6,000 ₹1.7 L | 6,000 ₹1.7 L | 3,700 ₹1.0 L | 6,000 ₹1.7 L |
| 1.04 | Laying CC 1:2:4 Coarse sand with mechanical mixing by batching plant including all cost of materials, labour and T&P etc. required for proper completion of work. | 17.29 | cum | 5,000 ₹86,450 | 7,000 ₹1.2 L | 8,000 ₹1.4 L | 5,300 ₹91,637 | 8,135 ₹1.4 L |
| 1.05 | Laying CC 1:1.5:3 Coarse sand with mechanical mixing by batching plant including all cost of materials, labour and T&P etc. required for proper completion of work. | 1.72 | cum | 7,000 ₹12,040 | 8,000 ₹13,760 | 9,000 ₹15,480 | 6,800 ₹11,696 | 9,443 ₹16,241.96 |
| 1.06 | Ist Class brick work in 1:4 C.M. with coarse sand and cement including all cost of materials, labour and T&P etc. required for proper completion of work. | 49.83 | cum | 4,000 ₹2.0 L | 6,100 ₹3.0 L | 5,500 ₹2.7 L | 3,600 ₹1.8 L | 5,962 ₹3.0 L |
| 1.07 | Bending, Binding, Cutting and Placing of reinforcement including cost of binding wire but excluding cost of steel. | 0.13 | MT | 83,282 ₹10,826.66 | 99,200 ₹12,896 | 80,000 ₹10,400 | 91,261 ₹11,863.93 | 94,752 ₹12,317.76 |
| 1.08 | Fabrication of mild steel iron grill work including cutting, drilling, welding / Revetting where necessory and Fixing in position including cost of all material labour , T & P etc. Required of proper complition of work with two coat of red oxide primer and erection of steel Gate at site. | 232.4 | kg | 105 ₹24,402 | 90 ₹20,916 | 100 ₹23,240 | 96.07 ₹22,326.67 | 100 ₹23,240 |
| 1.09 | Earth work in Canals with manual compaction and dressing including cost of labour and T&P etc | 333 | cum | 82 ₹27,306 | 70 ₹23,310 | 80 ₹26,640 | 59 ₹19,647 | 78 ₹25,974 |
Tender Value
₹13.7 L
EMD Value
₹1.4 L
Closing Date
5 May 2026, 11:00 amClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER GYANPUR CANAL DIVISIION BHADOHI
CONSTRUCTION OF DURAGANJ X-REGULATOR AT BHADOHI DY KM 24.620
2026_UPIDC_1142865_1
01/EE/GCD/2026-27
Open Tender
Civil Works
45 days
Durgaganj Abholi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,773
₹1.4 L
Yes
13 May 2026
28 Apr 2026
5 May 2026
28 Apr 2026
5 May 2026
28 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1A | ||||||
| 1.01 | Prepration of subgrade excluding cost of earth work including cost of labour and T&P, etc. charges etc complete | 1 | sqm | - | - | BI01010001010000000000000515BI0100001113 |
| 1.02 | Earth work in foundation in dry ordinary soil (Loam, clay or sand) including lift upto 1.50m and lead upto 30 m and including filling, watering and ramming of excavated earth. | - | cum | - | - | BI01010001010000000000000515BI0100001114 |
| 1.03 | Laying C.C. 1:4:8 with coarse sand dala stone grit of 20-40mm size including cost of all material, labour and T&P etc. required for proper completion of work. | - | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 1.04 | Laying CC 1:2:4 Coarse sand with mechanical mixing by batching plant including all cost of materials, labour and T&P etc. required for proper completion of work. | 1 | cum | - | - | BI01010001010000000000000515BI0100001116 |
| 1.05 | Laying CC 1:1.5:3 Coarse sand with mechanical mixing by batching plant including all cost of materials, labour and T&P etc. required for proper completion of work. | - | cum | - | - | BI01010001010000000000000515BI0100001117 |
| 1.06 | Ist Class brick work in 1:4 C.M. with coarse sand and cement including all cost of materials, labour and T&P etc. required for proper completion of work. | 1 | cum | - | - | BI01010001010000000000000515BI0100001118 |
| 1.07 | Bending, Binding, Cutting and Placing of reinforcement including cost of binding wire but excluding cost of steel. | - | MT | - | - | BI01010001010000000000000515BI0100001119 |
| 1.08 | Fabrication of mild steel iron grill work including cutting, drilling, welding / Revetting where necessory and Fixing in position including cost of all material labour , T & P etc. Required of proper complition of work with two coat of red oxide primer and erection of steel Gate at site. | - | kg | - | - | BI01010001010000000000000515BI0100001120 |
| 1.09 | Earth work in Canals with manual compaction and dressing including cost of labour and T&P etc | - | cum | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Tender_Set_Lot_01.pdf
Tender Documents • 1.39 MB
BOQ_2134449.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid