| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | L1 | Accepted-AOC AGREEMENT EXECIUTED |
Tender Value
₹7.8 L
EMD Value
₹19,505
Closing Date
6 Jan 2024, 12:00 pmClosed
SE,KOLLAM CORPORATION
SE,KOLLAM CORPORATION
308 2023 24Vadakkevila zonal Punthalathazham Division no 31Tagor nagar Punthalathazham nagar shilpa nagar lane road concreting interlocking
2023_LSGD_626136_13
PC4/16546/23
Open Tender
Civil Works - Roads
Item Rate
120 days
KOLLAM CORPORATION
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,560
Yes
₹19,505
Yes
8 Aug 2024
23 Dec 2023
8 Jan 2024
23 Dec 2023
6 Jan 2024
23 Dec 2023
23 Dec 2023 - 6 Jan 2024
Amount
RECONCRETING
3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.
75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
Retarring
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.9.3.pb.pa:Plastic roads- Packed Bitumen Rate 20mm thick Open-Graded Premix Carpetusing Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65 -Packed Bitumen and Shredded Plastic Providing, laying and rolling of opengradedpremix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregateseither using penetration grade bitumen or emulsion to required line, grade and level toserve as wearing course on a previously prepared base, using HM Plant attached withopen pugmilll.Heating of aggregate at 150 degree Celsius to 170 degree Celsius, thentransferring the hot aggregate to pugmill and add shredded plastic @10.22 kg/100m2mixing well to form a uniform thin layer of plastic over - hot aggregate and adding hotbitumen (150 to 165 degree Celsius) @ 13.578 Kg/10m2 and mix well, laying and rollingwith a. three wheel 80-100 kN static roller capacity, finished to required level and gradesto be- followed by seal coat of either Type A or Type B or Type C as per TechnicalSpecification Clause 508 Case - I By Manual Means (II) Bitumen (S-65),including supplying and stacking of materials.
75.5.12.A.3.2pb:Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case III : Type C <br> (II) Bitumen (S-65)
INTERLOCKING
OD21576/2023-2024:od98677/2019-20:Mord:Filling with contractor own earth excluding rock in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering , lead upto 50m and lift upto 1.5m as per direction of site engineer in-charge
2.6.B:Dismantling Brick/Tile Work<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. <br>(B) Cement mortar
OD23752/2023-2024:od36086/2019-2020: Mord: Surface dressing of the ground in Allkinds of soil including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50m.
OD174809/2023-2024:Interlocking Concrete Block Pavement Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504.
OD158583/2023-2024:Providing Plain cement concrete for Berm work CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course, mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4).
Bidder Name
RAHIM A
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_965034.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .