Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 3 7 PADI GALI VIKAS NAGAR DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | Admitted-Fee/PreQual/Technical |
| 3 | Not Admitted-Fee/PreQual/Technical 01 VIDYA VIHAR PHASE I KARGI ROAD DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | Not Admitted-Fee/PreQual/Technical Others-No hard copy received in Office of Tendering Authority i.e. E.E. (Civil), UJVNLTd., Lohiahead, Khatima |
Tender Value
₹1.5 Cr
EMD Value
₹3.8 L
Closing Date
16 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE (Civil), UJVNLtd., Lohiahead, Khatima
EE (Civil), UJVNLtd., Lohiahead, Khatima
Construction of Twin Badminton Court at Freedom Fighter Captain Karam Chand Stadium, Chuna Bhatta Banbasa, Distt. Champawat
2026_UJVN_101781_1
07/EE(Civil)/ Lohiahead/ Khatima/2026-27
Open Tender
Civil Works - Buildings
Percentage
365 days
Banbasa, Tanakpur
As per Tender Document
2 documents required · 2 mandatory
₹11,800
DGM (E and M-SHP), UJVNLtd., Pithoragarh
₹3.8 L
Lohiahead, Khatima
18 Nov 2026
30 Oct 2026
18 Nov 2026
30 Oct 2026
16 Nov 2026
30 Oct 2026
30 Oct 2026 - 6 Nov 2026
6 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m (DSR Item No 2.8.1 ) | 111 | Cum | 255.42 | ₹28,351.62 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.(DSR Item No 2.25 ) | 80 | Cum | 192.33 | ₹15,386.4 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (DSR Item No 4.1.8 ) | 56 | Cum | 6,684.25 | ₹3,74,318 |
| 4 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.All works upto plinth level (DSR item No.5.33.1.1) | 31 | Cum | 9,326.49 | ₹2,89,121.19 |
| 5 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.All works above plinth level upto floor V level (DSR item No.5.33.2.1) | 20 | Cum | 9,675.47 | ₹1,93,509.4 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.(DSR item No.5.9.1) | 54 | Sqm | 384.8 | ₹20,779.2 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers..(DSR item No.5.9.5) | 66 | Sqm | 722.59 | ₹47,690.94 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts(DSR item No.5.9.6) | 141 | Sqm | 943.27 | ₹1,33,001.07 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand)(DSR item No.6.1.2) | 6 | Cum | 6,998.48 | ₹41,990.88 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) (DSR Item No 6.4.2 ) | 50 | Cum | 8,935.17 | ₹4,46,758.5 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
TenderDocumentNIT07.pdf
Tender Documents • 1.24 MB
BOQ_119909.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .