Tender Value
₹98.1 L
EMD Value
₹99,000
Closing Date
28 Jul 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA Tiruchirappalli
Up gradation of 1 road in Thuraiyur Block in Tiruchirappalli District under Scheme Component of Pooled Assigned Revenue 2019-20 Additional Package No.1
2020_RDTN_172142_1
E1/1300/2020 Dated 17.07.2020
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹99,000
DRDA Tiruchirappalli
3 Aug 2020
21 Jul 2020
28 Jul 2020
21 Jul 2020
28 Jul 2020
21 Jul 2020
24 Jul 2020
90 days
Amount
Upgradation the road from Keerambur kurichi salai ricemill to Kothadimai colony km 0/0 - 2/0 Clearing the light jungle including al labour charges for cutting, burring, buried etc. complete. km 0/0-2/0
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A km 0/0-2/0
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) km 0/0-1/0
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) km 1/0-2/0
Collection and supply and laying of U.S.gravel including cost and conveyance of all materials and all labour charges etc. complete.side berms km 0/0-1/0
Collection and supply and laying of U.S.gravel including cost and conveyance of all materials and all labour charges etc. complete.side berms km 1/0-2/0
Providing and laying water bound macadam for 75mm consolidated thickness in second layer with Gr II graded IRC metal SSRB using 0.05Cum of 90 mm, 0.45 Cum of 63 mm, 0.425 Cum of 53mm, 0.05 Cum of 45mm,0.025 Cum of 22.40mm metal IRC size HBG metal confirming to IS 6579-1981 with 0.24cum of good gritty gravel as per job mix P.L.value not exceeding 6 as per IRC for blindage per 10sqm. including cost and conveyance of all of all materials from approved source to the work site and stacking them to standred departmental gauge for pre- measuerment including labour for laying . spreading hand packing to camber blinding with gravel watering with all leads for good water rollingforming edge bunds and consolidated by the department specification including hire and fule charges for power roller and all other tools and plants employer including all other incidental charges etc., complete. and as per IRC 19-1977 and 14-1977 and most specification clause km 0/0-1/0
Providing and laying water bound macadam for 75mm consolidated thickness in second layer with Gr II graded IRC metal SSRB using 0.05Cum of 90 mm, 0.45 Cum of 63 mm, 0.425 Cum of 53mm, 0.05 Cum of 45mm,0.025 Cum of 22.40mm metal IRC size HBG metal confirming to IS 6579-1981 with 0.24cum of good gritty gravel as per job mix P.L.value not exceeding 6 as per IRC for blindage per 10sqm. including cost and conveyance of all of all materials from approved source to the work site and stacking them to standred departmental gauge for pre- measuerment including labour for laying . spreading hand packing to camber blinding with gravel watering with all leads for good water rollingforming edge bunds and consolidated by the department specification including hire and fule charges for power roller and all other tools and plants employer including all other incidental charges etc., complete. and as per IRC 19-1977 and 14-1977 and most specification clause km 0/0-1/0
Providing and laying water bound macadam for 75mm consolidated thickness in second layer with Gr III graded IRC metal SSRB using 0.05Cum of 90 mm, 0.45 Cum of 63 mm, 0.425 Cum of 53mm, 0.05 Cum of 45mm,0.025 Cum of 22.40mm metal IRC size HBG metal confirming to IS 6579-1981 with 0.24cum of good gritty gravel as per job mix P.L.value not exceeding 6 as per IRC for blindage per 10sqm. including cost and conveyance of all of all materials from approved source to the work site and stacking them to standred departmental gauge for pre- measuerment including labour for laying . spreading hand packing to camber blinding with gravel watering with all leads for good water rollingforming edge bunds and consolidated by the department specification including hire and fule charges for power roller and all other tools and plants employer including all other incidental charges etc., complete. and as per IRC 19-1977 and 14-1977 and most specification clause km 0/0-1/0
Providing and laying water bound macadam for 75mm consolidated thickness in second layer with Gr III graded IRC metal SSRB using 0.05Cum of 90 mm, 0.45 Cum of 63 mm, 0.425 Cum of 53mm, 0.05 Cum of 45mm,0.025 Cum of 22.40mm metal IRC size HBG metal confirming to IS 6579-1981 with 0.24cum of good gritty gravel as per job mix P.L.value not exceeding 6 as per IRC for blindage per 10sqm. including cost and conveyance of all of all materials from approved source to the work site and stacking them to standred departmental gauge for pre- measuerment including labour for laying . spreading hand packing to camber blinding with gravel watering with all leads for good water rollingforming edge bunds and consolidated by the department specification including hire and fule charges for power roller and all other tools and plants employer including all other incidental charges etc., complete. and as per IRC 19-1977 and 14-1977 and most specification clause km 1/0-2/0
Providing and laying Tack Coat over the W.B.M surface using 4.00Kg of Emulsion Bitumen as Blinder for 10Sqm. area including cost and conveyance of bitumen which will be supplied departmentaly at departmental section store at union office and cost of the same which will be recovered from the contractors bill at the rates specified in the special condition appended here with including conveyance of bitumen from section store to work site handling charges of bitumen at both ends and including all labour charges for clearing surface before the application of bitumen blinder and heating the bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges bitumen sprayer (with self heating and pumping arrengment) and all other tools and plants employed and also as directly by the engineer incharge and all other incidental charges etc. complete as per clause 505 of most specification. km 0/0 - 1/0
Providing and laying Tack Coat over the W.B.M surface using 4.00Kg of Emulsion Bitumen as Blinder for 10Sqm. area including cost and conveyance of bitumen which will be supplied departmentaly at departmental section store at union office and cost of the same which will be recovered from the contractors bill at the rates specified in the special condition appended here with including conveyance of bitumen from section store to work site handling charges of bitumen at both ends and including all labour charges for clearing surface before the application of bitumen blinder and heating the bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges bitumen sprayer (with self heating and pumping arrengment) and all other tools and plants employed and also as directly by the engineer incharge and all other incidental charges etc. complete as per clause 505 of most specification. km 1/0-2/0
Providing and laying premix carpet with seal coat Type ‘ A for 20 thickness using 0.18cum of 13.2mm IRC,HBG metal and 0.09cum of 11.2mm IRC,HBG metal with 14.60Kg . of bitumen for premixing 10sqm . of premix carpet and 0.09cum of 6.7mm IRC, HBG metal with 9.80Kg . of bitumen for seal coat type ‘A per 10sqm . including cost and conveyance of materials to be work site and stacking them to the departmental metric gauge for pre mesurment, heating the bitumen in bitumen boilur , heating the aggregates , and mixing them with bitumen in mini hot mix plant for pre mix carpet only rolling by 60/70 KN power of premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet, including labour charges for spreading seal coat separately over premix carpet etc., including hire charges and fuel charges for mini hot mix plant, bitumen boiler, power roller and all other tools and plant employed etc., complete as per clause 509 of MOST specification . km 0/0-1/0
Providing and laying premix carpet with seal coat Type ‘ A for 20 thickness using 0.18cum of 13.2mm IRC,HBG metal and 0.09cum of 11.2mm IRC,HBG metal with 14.60Kg . of bitumen for premixing 10sqm . of premix carpet and 0.09cum of 6.7mm IRC, HBG metal with 9.80Kg . of bitumen for seal coat type ‘A per 10sqm . including cost and conveyance of materials to be work site and stacking them to the departmental metric gauge for pre mesurment, heating the bitumen in bitumen boilur , heating the aggregates , and mixing them with bitumen in mini hot mix plant for pre mix carpet only rolling by 60/70 KN power of premix carpet and seal coat separately including labour charges for spreading the mix for premix carpet, including labour charges for spreading seal coat separately over premix carpet etc., including hire charges and fuel charges for mini hot mix plant, bitumen boiler, power roller and all other tools and plant employed etc., complete as per clause 509 of MOST specification . km 1/0-2/0
Provision for KM stone
Provision for HM stone
Provision for Name Board
Construction of Causeway at Ch 1005m Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supply and filling of coarse sand from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete in the filter media over the layer of 20mm size of metal
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyances of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement Conrete 1:3:6 mix using 40 mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in etc.,
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Construction of Causeway at Ch 1420m Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supply and filling of coarse sand from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete in the filter media over the layer of 20mm size of metal
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyances of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement Conrete 1:3:6 mix using 40 mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in etc.,
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Construction of Causeway at Ch 1730m Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supply and filling of coarse sand from approved quarry including cost and conveyance of all materials to site and all labour charges etc complete in the filter media over the layer of 20mm size of metal
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyances of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement Conrete 1:3:6 mix using 40 mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in etc.,
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Construction of 3.00m span slab culvert at ch 348 Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Sand filling with good river sand including cost and conveyance of all materials to site incliding watering and compacting etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bedblock
Supplying and errection of centering for sides and soffits using country wood props and steel shutters etc Below GL
Supplying and errection of centering for sides and soffits using country wood props and steel shutters etc Above GL
Supplying and fabrication of steel including cost of steel and conveyance to site and all labour charges for cutting to length, bending to shape tying in position and forming grills for all RCC works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete. For Deck Slab
Supply and fixing of PVC Pipe Weep holes
Construction of 3.00m span slab culvert at ch 630 Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Sand filling with good river sand including cost and conveyance of all materials to site incliding watering and compacting etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bedblock
Supplying and errection of centering for sides and soffits using country wood props and steel shutters etc Below GL
Supplying and errection of centering for sides and soffits using country wood props and steel shutters etc Above GL
Supplying and fabrication of steel including cost of steel and conveyance to site and all labour charges for cutting to length, bending to shape tying in position and forming grills for all RCC works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete. For Deck Slab
Supply and fixing of PVC Pipe Weep holes
Construction of 3.00m span slab culvert at ch 700 Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Sand filling with good river sand including cost and conveyance of all materials to site incliding watering and compacting etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bedblock
Supplying and errection of centering for sides and soffits using country wood props and steel shutters etc Below GL
Supplying and errection of centering for sides and soffits using country wood props and steel shutters etc Above GL
Supplying and fabrication of steel including cost of steel and conveyance to site and all labour charges for cutting to length, bending to shape tying in position and forming grills for all RCC works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete. For Deck Slab
Supply and fixing of PVC Pipe Weep holes
Construction of 1.50m span slab culvert at ch 1605 Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Sand filling with good river sand including cost and conveyance of all materials to site incliding watering and compacting etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bedblock
Supplying and errection of centering for sides and soffits using country wood props and steel shutters etc Below GL
Supplying and errection of centering for sides and soffits using country wood props and steel shutters etc Above GL
Supplying and fabrication of steel including cost of steel and conveyance to site and all labour charges for cutting to length, bending to shape tying in position and forming grills for all RCC works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete. For Deck Slab
Supply and fixing of PVC Pipe Weep holes
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K SARAVANAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .