Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Design Plus L1 |
|---|---|---|---|---|
| 1.00 | Survey and Investigations of the existing galleries, roofing, indoor halls, track and field; documentation of existing utilities (water, drainage, electrical, Air conditioning in Indoor, fire-fighting). Preparation and submission of Inception Report covering survey findings, analysis of survey and condition assessment; identification of deficiencies in existing | 1 | Job | 7,50,000 ₹7,50,000 Lowest |
| 2.00 | Preparation of minimum 3 conceptual drawing & design options for modernization of galleries, seating, roofing, football ground and other sports facilities such as cricket practise net, Kabadi court, handball court, etc., office buildings, Gym, Medic centre, Physiotherapy centre and indoor facilities; circulation and zoning improvements; parking and landscaping options; Multifunctional halls & Provisions for Electrical/Genset rendered views and 3D walkthroughs; incorporation of energy efficiency and universal accessibility; submission of Conceptual Drawing & Design Report | 1 | Job | 20,00,000 ₹20,00,000 Lowest |
| 3.00 | Preparation and submission of Draft Detailed Design Report including detailed architectural drawings for renovation of spectator galleries, amenities (toilets, VIP boxes, press/media zones, player changing rooms, medical/doping control rooms), up gradation of football ground improvement, Office buildings, indoor sports facilities, supporting infrastructure (roads, drainage, electrical arrangements, landscaping, fire safety, electrical arrangements, HVAC arrangements, accessibility); preliminary BOQs and Detailed Project Reports as per PWD Schedule Of Rates 2024-25; submission of Draft Report | 1 | Job | 50,00,000 ₹50,00,000 Lowest |
| 4.00 | Preparation and submission of Detailed Project Report including Final Detailed Design Report Good-for-Construction drawings, final BOQs and cost estimates, lifecycle cost analysis (synthetic track, turf, roofing), O&M guidelines; BIM model (LOD 300) for coordination; | 1 | Job | 90,00,000 ₹90,00,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
12 Aug 2026, 3:00 pmClosed
Executive Engineer, SBD-II, PWD, Puducherry
No.1, Rue Eveche, Puducherry - 01
Consultancy Services for Preparation of Conceptual Drawings, Design and Detailed Project Report for Renovation and Modernization of Indira Gandhi Sports Complex, Puducherry.
2026_PWDC2_22521_1
10/PW/SBD-II/2026-27
Open Tender
Consultancy
Item Rate
90 days
IGCS, Uppalam
Please refer tender documents
3 documents required · 3 mandatory
₹525
₹2 L
Chamber of Chief Engineer, PWD, Puducherry.
13 Oct 2026
9 Jul 2026
12 Aug 2026
9 Jul 2026
12 Aug 2026
9 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Survey and Investigations of the existing galleries, roofing, indoor halls, track and field; documentation of existing utilities (water, drainage, electrical, Air conditioning in Indoor, fire-fighting). Preparation and submission of Inception Report covering survey findings, analysis of survey and condition assessment; identification of deficiencies in existing | - | Job | 1.25 | - |
| 2 | Preparation of minimum 3 conceptual drawing & design options for modernization of galleries, seating, roofing, football ground and other sports facilities such as cricket practise net, Kabadi court, handball court, etc., office buildings, Gym, Medic centre, Physiotherapy centre and indoor facilities; circulation and zoning improvements; parking and landscaping options; Multifunctional halls & Provisions for Electrical/Genset rendered views and 3D walkthroughs; incorporation of energy efficiency and universal accessibility; submission of Conceptual Drawing & Design Report | - | Job | - | - |
| 3 | Preparation and submission of Draft Detailed Design Report including detailed architectural drawings for renovation of spectator galleries, amenities (toilets, VIP boxes, press/media zones, player changing rooms, medical/doping control rooms), up gradation of football ground improvement, Office buildings, indoor sports facilities, supporting infrastructure (roads, drainage, electrical arrangements, landscaping, fire safety, electrical arrangements, HVAC arrangements, accessibility); preliminary BOQs and Detailed Project Reports as per PWD Schedule Of Rates 2024-25; submission of Draft Report | - | Job | 100 | - |
| 4 | Preparation and submission of Detailed Project Report including Final Detailed Design Report Good-for-Construction drawings, final BOQs and cost estimates, lifecycle cost analysis (synthetic track, turf, roofing), O&M guidelines; BIM model (LOD 300) for coordination; | - | Job | 53 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 1.06 MB
Tendernotice_3.pdf
PDF • 0.92 MB
BOQ_22967.xls
BOQ • 0.31 MB
Siteplan.pdf
PDF • 0.49 MB
Corrigendumfor_NIT.pdf
PDF • 22.30 MB
corrigendum_Querriesandreplies.pdf
PDF • 30.34 MB
Corrigendumdate.pdf
PDF • 1.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .