Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.1 LAdmitted-Finance | -40.86% | ₹4.1 L | L1 | Admitted-Finance |
| 2 | L2₹4.2 LAdmitted-Finance | -38.99% | ₹4.2 L | L2 | Admitted-Finance |
| 3 | L3₹4.2 LAdmitted-Finance | -38.87% | ₹4.2 L | L3 | Admitted-Finance |
| 4 | L4₹4.6 LAdmitted-Finance | -33.33% | ₹4.6 L | L4 | Admitted-Finance |
Tender Value
₹6.9 L
EMD Value
₹13,860
Closing Date
22 Aug 2026, 6:00 pmClosed
Executive Engineer
Xen
As boq
2026_RDPR_320400_29
60 REW Samba of 2026-27 Dated-10-08-2026
Open Tender
Civil Works
Percentage
60 days
Ramgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executve Engineer Rew Samba
₹13,860
27 Aug 2026
12 Aug 2026
24 Aug 2026
12 Aug 2026
22 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: | 18.27 | cum | 1,458.45 | ₹26,645.88 |
| 2 | Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m. (stacks of cleaned bricks shall be measured) | 8.68 | 1000 no's | 4,944.1 | ₹42,914.79 |
| 3 | Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in foundations and plinth including curing in Cement mortar 1:4 ( 1 cement : 4 coarse sand) | 273.7 | sqm | 947.25 | ₹2,59,262.32 |
| 4 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 3: 6: ( 1: cement 3: coarse sand : 6 graded crushed stone aggregate 20mm nominal size | 4.21 | cum | 5,733.6 | ₹24,138.46 |
| 5 | Dumping of Stone including the cost of stone all leads lifts plus Complete Carriage | 1.81 | cum | 700 | ₹1,267 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in | 3.82 | cum | 7,571.55 | ₹28,923.32 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for:
4.6.1 Foundations, footings, bases for columns | 40.06 | cum | 286.35 | ₹11,471.18 |
| 8 | P/Applying 12mm thick c.plaster in 1:6 c.mortar | 427.51 | cum | 266.2 | ₹1,13,803.16 |
| 9 | White washing with lime to give an even shade on New Work (three or
more coats) | 427.51 | SQM | 29.95 | ₹12,803.92 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 8.39 | cum | 4,826.5 | ₹40,494.34 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.93 MB
BOQ_1065144.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].