Loading…
Loading…
Tender Value
Refer Docs
Closing Date
5 Oct 2026, 3:30 pm
M M Darbar (Sr. Manager)
Supply, Installation, Erection, Commissioning and Testing of Goods cum Passenger Lift having capacity of 1500 Kg at Boiler Plant.
347271
MM/AVM/10147935
Open
Electrical
Fixed-rate
Bharuch
7 documents required · 7 mandatory
23 Sept 2026
23 Sept 2026
23 Sept 2026
5 Oct 2026
23 Sept 2026
Sl. No. ITEM UNIT GUARANTEED PARTICULARS BY BIDDER
2 Type – Standards IS 17900 (vendor to confirm)
3 Capacity -1500 Kg (vendor to confirm)
4 Rated speed 0.7 M/Sec (vendor to confirm)
5 Contract speed M/sec
6 Car dimensions (L X B X H) mm
7 Overall weight Kg.
9 No. of Landings and Locations as per clause no 1.1.2(vendor to confirm)
10 Lift control type
12 Levelling device
13 Type of car and landing doors
14 Size of doors mm x mm
15 Door Operator
16 Vision panel in doors
17 Operating devices in car
18 Operating devices in landings
19 Indicating devices in car
20 Indicating devices in landings
21 Details of car lighting
22 Details of car ventilation
23 Details of Painting
24 Pit height from bottom landing mm
25 Clearance between top landing and Machine Room mm
26 Machine Room Dimensions (L X B X H) mm
27.2 Enclosure and Ventilation
27.3 Rated voltage V
27.4 Winding insulation class
27.6 Torque/speed characteristics enclosed Yes/no
27.7 Temperature rise at full load °C
28.3 Number of Ropes Nos.
28.4 Diameter of Ropes mm
28.5 No. and diameter of strands Nos,mm
28.6 Cross sectional area mm2
28.7 Outside diameter mm
28.8 Ultimate strength Kg
28.9 Working stress Kg/cm2
29 Enclosure for electrical equipment shall be IP-65 (vendor to confirm)
30 Sheaves and Pulleys
30.1 Material for construction
30.2 Dia and grooves Mm, Nos.
31.1 Type / Make
31.3 Rated Speed RPM
31.4 Tripping Speed % of RPM
31.5 Weigh loaded / Spring loaded
31.6 Setting range
31.7 Factory set value
31.8 Safety switch type
31.9 Provision of actual speed measurement
32 Type of brake
33 Hand cranking device
38 Counterweight Kg.
38.1 Location of counter weight
39 Control & Power system
39.2 Location: Lift Control Room at G Floor(vendor to confirm)
39.3 Enclosure: Double front indoor type (vendor to confirm)
39.4 Enclosure thickness mm
39.5 Degree of ingress protection as per IS 13947: IP-65, Dust proof, Weather proof & vermin proof Yes/no
39.6 Type: Fixed type, free standing floor mounting with hinge doors Yes/no
39.7 Material of construction: The enclosure shall be fabricated from 14 SWG (2.0 mm) MS CRCA sheet steel. Yes/no
39.8 Hardware: All hardware shall be of Stainless Steel grade SS-304. Yes/no
39.1 Gasket: Neoprene rubber gasket shall be used to achieve water and dust proofing for inside door Yes/no
39.11 Earthing: AL Earth bus of suitable size to be considered. 02sets of Nut-bolts with Plain & spring washers not less than M8 X 40 mm of SS-304 shall be provided with the panels for external and internal earthing. Yes/no
39.12 Cable Entry: Necessary knockouts shall be made for entry of cables as per requirement at panel bottom side. Yes/no
39.13 Power & control panel: The overall size of the enclosure shall not be less than 750 (W)X 1500(H) X 500(D) mm. Yes/no
39.14 ARD Panel enclosure shall not be less than 600 (W)X 1000(H) X 300(D) mm. Yes/no
39.15 The control panel & its Microprocessor based controller shall be suitable for 50 degree ambient temperature. Yes/no
39.16 Min. clearance between: Phase to phase: 25 mm Yes/no
39.17 Min. clearance between: /Phase to earth :19 mm Yes/no
39.18 All components installed in control panel shall be suitable for 50 degree ambient temperature. Yes/no
39.19 Selection of switch, MCCB, MPCB, MCB, contactor & relays shall be as per Type-2 co-ordination. Yes/no
39.2 Make of all components like limit switches, Contactor, Push buttons, , MCCB, MPCB, MCB, Relays, Control transformer, Aux. relays, meters, Lamps, etc Yes/no
39.21 Primer: Two coats of epoxy based primer & stoved after each coat. Yes/no
39.22 Final paint: Two coats of epoxy paint (acid proof). Yes/no
39.23 RAL 7032 (Siemens-Grey) paint shade with paint thickness 80 microns. Yes/no
39.24 Panel all drawings to be submitted for review and approval of Purchaser. Yes/no
40 AC VFD Drive
40.3 Rating: kW
40.4 Rating of VFD shall be one size higher than Motor Rating. Yes/no
40.5 Other details if any.
41 Micro Processor Based control system
41.1 Latest Microprocessor based control system to be provided. Contactor logic system will not be accepted. Yes/no
41.5 Other details if any.
41.6 Vendor to provide and give details of suitable diagnostic intelligence fault/error diagnostic feature to save upon trouble shooting time. Yes/no
42 Control Cables
42.3 Cores Nos.
42.5 No. of cables
42.6 No. of cable groups
43 Power Cables
43.3 Cores Nos.
43.5 No. of cables
43.6 No. of cable groups
44 Brake Details
44.1 Dust proof, weather proof IP-65 Yes/no
44.6 Other details if any
45 Gear Box Details
45.5 Type of lubricating oil
45.6 Other details if any
46 Drum Details
46.5 Other details if any
47 Coupling Details
47.5 Other details if any
48 Governor Rope
48.4 Number of ropes Nos.
48.5 Dimensions mm
48.6 Other details if any
49.1 Make Yes/no
49.2 Mounting : B3 Yes/no
49.3 Frame Size:
49.4 Design Ambient temp : 50 deg C Yes/no
49.5 Type : Squirrel cage Induction motor Yes/no
49.6 Inverter grade motor suitable for operation by VVVF controller. Yes/no
49.7 The motors should comply with Standards (latest version) IS: 325, IEC: 60034. Yes/no
49.8 Starting of machine / Method of starting : On load / VFD Starting
49.9 Class of protection: IP 65 Yes/no
49.1 Voltage : 415 V,AC +/- 10% Yes/no
49.11 Frequency : 50 Hz + 3% - 6% Yes/no
49.12 Fault level : 35 MVA Yes/no
49.13 Phase : 3 Yes/no
49.14 Enclosure type : TEFC Cast Iron body Yes/no
49.15 Duty cycle : S4 (Intermittent periodic duty with starting) Yes/no
49.16 Insulation : Class H insulation but temp rise limited to class F Yes/no
49.17 Duty : Suitable for Lift Application Yes/no
49.18 CDF (Cyclic Duty Factor) : 40% Yes/no
49.19 Start/Hr : 150 Yes/no
49.2 No. of terminals : 6 Yes/no
49.21 Specific requirement: Motor should be with extended shaft on NDE side for hand cranking operation of lift, during Emergency operation. Yes/no
49.22 Motor should be capable to run with electromagnetic braking. Yes/no
49.23 All hardware of motor shall be of SS-304. Yes/no
49.24 Motor datasheet to be submitted for review and approval of Purchaser. Yes/no
50 Other equipment/components
50.1 All protective, safety & limit switches, door interlock shall be dust & weather proof IP66 with SS-304 hardware. Yes/no
50.2 Hall/Landing push buttons stations shall be IP65 SS-304, with SS-304 hardware. PBs with illuminated call registration light for all landing doors. Yes/no
50.3 Panel inside the car shall be IP65 SS-304, with SS-304 hardware. PBs with illuminated call registration light for car. Yes/no
50.4 Car inspection box at top of the car shall be IP65 SS-304, with SS-304 hardware. Yes/no
50.5 Over speed Governor Safety switches shall be IP65, with SS-304 hardware. Yes/no
50.6 Car door switch shall be IP65, with SS-304 hardware. Yes/no
50.7 Junction boxes for wiring & main/ midway JB shall be IP65, SS-304 with SS-304 hardware with double door arrangement. Yes/no
50.8 All other junction boxes for wiring shall be IP65, SS-304 with SS-304 hardware. Yes/no
50.9 All steel items of hoist way shall be Epoxy coating, Anti-corrosive paint to withstand against corrosive atmosphere. Yes/no
51 Earthing System
51.1 GNFC will provide main earth connection to earth bus located in machine room and vendor shall carry out earthing of various electrical equipments located inside the machine room. Also the vendor has to make suitable arrangement for effective earthing of the electrical equipments mounted on the top of car / inside the car. Yes/no
52 Tools and Tackles
52.1 A tool box containing special tools required if any, torque wrench, cranking Handle, set of spanners, screw drivers etc. shall be supplied along with the LIFT. Yes/no
53 Car Inside Lighting
53.1 The car lighting supply shall be independent of the power supply mains. Yes/no
53.2 Light should remain ON when lift is available for use. Yes/no
53.4 Type: LED type Yes/no
53.6 Number of Fixtures: Nos.
54 Other Lighting
54.1 Supply and installation Dust proof, weather proof, 240 V AC, IP 65, LED fixture with industrial enclosure on car top for maintenance activities. Wiring shall be in vendor’ scope. Yes/no
54.2 Supply and installation Lift well and machine room lighting shall be in Vendor Scope. (Vendor should consider 2 Nos. lights diagonally at every interval of 4 mtr. height in lift well). Wiring shall be in vendor’ scope. Yes/no
54.4 Rating: (Min.45W) W
54.5 IP Rating: (Min IP-65) Yes/no
55 Industrial Power Supply Sockets.
55.1 Supply and installation Dust proof, Weather proof IP-65 240V, 1ph Industrial interlocked Power supply Switch Socket with 2P RCBO at Car top, Machine room, Control panel room and in lift well for maintenance activities. Yes/no
56 Ventilation Fan inside Car
56.1 Ventilation fans with switch shall be provided inside the Car. Fan shall be auto cut OFF when car stops. Yes/no
57 Communication Facility inside Car
57.1 Vertically mounted industrial Intercom phone shall be provided by vendor in lift car, machine room as well as at Control room/ Substation for communication. Wiring shall be in vendor’ scope. Yes/no
57.2 Vertically mounted PA System equivalent to hook up with existing PA System of plant. Yes/no
57.3 Announcement system for Floor, Overload warning announcement facility etc. shall be provided. Yes/no
58 Limit switch & safety switch
58.4 Enclosure material
58.5 Ingress protection: (Min. IP-65)
59.1 Mandatory spares for 05 years of trouble free operation and maintenance of Lifts will be considered for supplied by Bidder as per ANNEXURE-C Yes/no
59.2 Guarantee Period
59.3 The equipment shall be guaranteed for the specified duty, for repair / replacement, free of cost to OWNER of any defect, fault or deficiency in vendors design, engineering, material, workmanship, construction and manufacture for a period of 18 months from the beginning of commissioning of work or 36 months from delivery at site whichever is later, unless otherwise stated. Yes/no
60 Comprehensive AMC confirmation after completion of Guarantee Period
60.1 5 years of Comprehensive AMC confirmation after completion of Guarantee Period to be consider by vendor. Yes/no
This CAMC includes the following scope of services:
1] Monthly Routine Services and Breakdown Services
2] Assistance during Yearly Load Test, Licence Renewal, Six Monthly 3rd Party Inspection.
3] Repairing / Replacement of consumable items as per ANNEXURE-D. Components will be furnished by the Vendor on exchange basis
Same can be awarded at yearly basis to successful bidder if GNFC requires and will be as per the clauses of mini GCC of GNFC only.
61 Delivery period and execution period
61.1 Supply Material Delivery period
61.2 Execution period [Erection, commissioning, testing period]
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GCP.pdf
Mini-General Conditions of Contract (Mini-GCC).pdf
MSME Annexure.pdf
Deviations Sheet.pdf
Annx-BS2_ Comm Terms Cond_Indigenous_R0.pdf
GEOTECHNICAL_INVESTIGATION_REPORT.pdf
ANNEXURE_A_LIFT_TECH_SPECIFICATIONS.pdf
ANNEXURE_B_PREQUALIFICATION_CRITERIA.pdf
CIVIL_STRUCTURAL_DESIGN_SPEC.pdf
DATASHEET-B_TECH_DATA_SHEET.xlsx
XLSX
Annexure - T.pdf
Notice_Inviting_Tender.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .