Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Finance | -19.99% | ₹5.2 L | L1 | Admitted-Finance |
| 2 | L2₹5.4 L+₹19,447.12 (3.74%)Admitted-Finance | -17.00% | ₹5.4 L+₹19,447.12 (3.74%) | L2 | Admitted-Finance |
| 3 | L3₹5.5 L+₹25,886.13 (4.97%)Admitted-Finance | -16.01% | ₹5.5 L+₹25,886.13 (4.97%) | L3 | Admitted-Finance |
| 4 | L4₹5.5 L+₹26,406.45 (5.07%)Admitted-Finance | -15.93% | ₹5.5 L+₹26,406.45 (5.07%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-Registration card not renewed and document are not visible. |
Tender Value
₹6.5 L
EMD Value
₹13,000
Closing Date
29 May 2026, 6:00 pmClosed
Executive Engineer
Office of the Executive Engineer REW Samba
Please Refer as per BOQ
2026_RDPR_310741_3
09 REW Samba of 2026-27, Dated 22.05.2026
Open Tender
Civil Works
Percentage
30 days
Bari Brahmana
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW Samba
₹13,000
3 Jun 2026
23 May 2026
30 May 2026
23 May 2026
29 May 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Excavation by manual means in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.lead upto 50mtrs | 12 | cum | 479.3 | ₹5,751.6 |
| 2 | Providing and lying in position cement concrete 1:5:10 (1 cement:5 fine sand:10) graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 3.62 | cum | 4,826.5 | ₹17,471.93 |
| 3 | Providing and laying in position cement concrete 1:3:6 (1 cement 3 fine sand 6 graded crushed stone aggregates 20mm size) excluding the cost of centring and shuttering- all works upto plinth level. | 10.34 | cum | 5,733.6 | ₹59,285.42 |
| 4 | Supply and dumping excl c/o stone | 2.58 | cum | 567.35 | ₹1,463.76 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand)for super structure upto floor level v | 19 | cum | 9,027.2 | ₹1,71,516.8 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.44 | cum | 7,788.4 | ₹42,368.9 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars | 4.34 | qtl | 12,320 | ₹53,468.8 |
| 8 | Centring and shuttering including strutting, propping etc and removal of the formwork.foundtaion and footing | 64 | sqm | 286.35 | ₹18,326.4 |
| 9 | Centring and shuttering including strutting, propping etc and removal of Same Suspended floor and siffit of slab. | 27.88 | sqm | 718.2 | ₹20,023.42 |
| 10 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Edges of Slab | 37.8 | rmt | 262.2 | ₹9,911.16 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.04 MB
BOQ_1005078.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .