Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.3 LAccepted-Finance | ₹32.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹34.8 L+₹2.5 L (7.87%)Accepted-Finance | ₹34.8 L+₹2.5 L (7.87%) | L2 | Accepted-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L7 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L12 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L10 |
| Sl No | Description | Qty | Unit | s.jayakumar L9 | M.Salahudeen L7 | VINOJ P L4 | SHIBULAL V S L6 | R Muraleedharan Nair L10 | Renjith.R L3 | SURESH BABU C L2 | NAZARUDEEN L12 | SHIBU R L1 | SIBIN B S L5 | SHIRAZ A NAHAS L8 | SHAJI BHADRAN L11 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Road maintenance | |||||||||||||||
| 1.00 | 2.14.2.A:Dismantling of Flexible Pavements<br> Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 <br> (II) By Mechanical Means<br> (A) Bituminous Courses | 34.66 | cum | 379.67 ₹13,158.6 | 409.71 ₹14,199.73 | 393.7 ₹13,644.85 | 405.54 ₹14,055.21 | 426 ₹14,764.31 | 385.15 ₹13,348.53 | 381.85 ₹13,234.16 | 9 ₹311.92 Lowest | 353.97 ₹12,267.89 | 395 ₹13,689.91 | 170 ₹5,891.86 | 450 ₹15,596.1 |
| 1.00 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65) | 213.45 | sqm | 339.24 ₹72,410.78 | 366.45 ₹78,218.75 | 351.75 ₹75,081.04 | 362.35 ₹77,343.61 | 415.12 ₹88,607.36 | 344.12 ₹73,452.41 | 341.18 ₹72,824.87 | 360 ₹76,842 | 316.27 ₹67,507.83 | 353 ₹75,347.85 | 280 ₹59,766 Lowest | 400 ₹85,380 |
| 1.00 | 5.2.1a:Tack Coat<br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,757.8 | sqm | 11.7 ₹20,566.26 | 12.36 ₹21,726.41 | 12.1 ₹21,269.38 | 12.49 ₹21,954.92 | 14.32 ₹25,171.7 | 11.87 ₹20,865.09 | 11.76 ₹20,671.73 | 16 ₹28,124.8 | 10.91 ₹19,177.6 Lowest | 12.2 ₹21,445.16 | 18 ₹31,640.4 | 14 ₹24,609.2 |
| 1.00 | 75.5.11.1.A.2Z:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 and Antistripping Agent <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65) | 1,757.8 | sqm | 246.02 ₹4,32,453.96 | 265.78 ₹4,67,188.08 | 255.1 ₹4,48,414.78 | 262.78 ₹4,61,914.68 | 301.05 ₹5,29,185.69 | 249.57 ₹4,38,694.15 | 247.43 ₹4,34,932.45 | 300 ₹5,27,340 | 229.37 ₹4,03,186.59 Lowest | 257 ₹4,51,754.6 | 310 ₹5,44,918 | 300 ₹5,27,340 |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 69.77 | cum | 9,776.27 ₹6,82,041.48 | 8,632.21 ₹6,02,226.13 | 8,284.4 ₹5,77,961.17 | 8,533.7 ₹5,95,353.58 | 8,896 ₹6,20,629.44 | 8,104.52 ₹5,65,411.84 | 8,035.11 ₹5,60,569.45 | 9,000 ₹6,27,885 | 7,448.54 ₹5,19,647.39 Lowest | 8,310 ₹5,79,747.15 | 8,100 ₹5,65,096.5 | 9,000 ₹6,27,885 |
| 1.01 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | 361.8 | cum | 54.86 ₹19,848.35 | 59.16 ₹21,404.09 | 56.88 ₹20,579.18 | 58.59 ₹21,197.86 | 65 ₹23,517 | 55.65 ₹20,134.17 | 55.17 ₹19,960.51 | 98 ₹35,456.4 | 51.14 ₹18,502.45 Lowest | 57.1 ₹20,658.78 | 60 ₹21,708 | 65 ₹23,517 |
| 1.01 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 173.66 | cum | 9,390.88 ₹16,30,857.78 | 8,291.37 ₹14,39,912.48 | 7,957.83 ₹13,81,988.59 | 8,197.29 ₹14,23,574.17 | 8,544 ₹14,83,785.22 | 7,785.03 ₹13,51,979.45 | 7,718.36 ₹13,40,401.27 | 9,200 ₹15,97,708.8 | 7,154.91 ₹12,42,550.29 Lowest | 7,990 ₹13,87,575.36 | 8,100 ₹14,06,678.4 | 8,900 ₹15,45,609.6 |
| 1.01 | 2.3.A.1:Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps <br> Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. <br> A. Lead upto 100 m <br> (i) Girth above 300 mm to 600 mm | 13 | each | 605.4 ₹7,870.2 | 653.42 ₹8,494.46 | 627.77 ₹8,161.01 | 646.66 ₹8,406.58 | 680 ₹8,840 | 614.13 ₹7,983.69 | 608.87 ₹7,915.31 | 600 ₹7,800 | 564.43 ₹7,337.59 Lowest | 630 ₹8,190 | 1,300 ₹16,900 | 700 ₹9,100 |
| 1.01 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 75.9 | cum | 368.81 ₹27,992.68 | 398.23 ₹30,225.66 | 382.44 ₹29,027.2 | 393.94 ₹29,900.05 | 410 ₹31,119 | 374.13 ₹28,396.47 | 370.93 ₹28,153.59 | 450 ₹34,155 | 343.85 ₹26,098.22 Lowest | 385 ₹29,221.5 | 520 ₹39,468 | 430 ₹32,637 |
Tender Value
₹42.4 L
EMD Value
₹50,000
Closing Date
18 Aug 2026, 3:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Thiruvananthapuram District Panchayth
Road
2026_LSGD_864179_1
6b(1)/AEE/LSGD/TVM/2026-27
Open Tender
Civil Works - Roads
Item Rate
180 days
Thiruvananthapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
1 Sept 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road maintenance | |||||
| 1.001 | 2.14.2.A:Dismantling of Flexible Pavements<br> Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202 <br> (II) By Mechanical Means<br> (A) Bituminous Courses | - | cum | - | - |
| 1.002 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65) | 1 | sqm | - | - |
| 1.003 | 5.2.1a:Tack Coat<br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1 | sqm | - | - |
| 1.004 | 75.5.11.1.A.2Z:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 and Antistripping Agent <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65) | 1 | sqm | - | - |
| 1.005 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | - | cum | - | - |
| 1.006 | 3.5.2:Excavation in Soil with Dozer with lead upto 100 m <br> Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. | - | cum | - | - |
| 1.007 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 0.6 | cum | - | - |
| 1.008 | 2.3.A.1:Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps <br> Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specification Clause 201. <br> A. Lead upto 100 m <br> (i) Girth above 300 mm to 600 mm | - | each | - | - |
| 1.009 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m <br> Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | - | cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1463549.xls
BOQ • 0.31 MB
KayalpuramSBD.pdf
Tender Documents • 2.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .