| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 CrAccepted-AOC | ₹10.0 Cr | L1 | Accepted-AOC work awarded |
| 2 | L2₹10.1 Cr+₹18.0 L (1.81%)Rejected-Finance VILLAGE GHAMRADA P O SOLDHA TEHSIL SADAR DISTRICT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | ₹10.1 Cr+₹18.0 L (1.81%) | L2 | Rejected-Finance L2 |
| 3 | L3₹10.4 Cr+₹48.4 L (4.86%)Rejected-Finance R O NEAR DEGREE COLLEGE ANU HAMIRPUR TEHSIL DISTRICT HAMIRPUR HP C O LINK ROAD TO SUNGRA KANDA KM 0 0 TO 4 555 SH FORMATION CUTTING 5 7 MTR WIDE ROAD C O R WALL B WALL C O UNLINED DRAIN C O CROSS DRAINAGE WORKS PARAPETS P F ROAD SIDE FURNITURE AND DUMPING SITES ETC KM 0 00 TO 4 555 | HAMIRPUR | HIMACHAL PRADESH | 174304 | ₹10.4 Cr+₹48.4 L (4.86%) | L3 | Rejected-Finance L3 |
| 4 | L4₹10.6 Cr+₹59.7 L (6.00%)Rejected-Finance VILLAGE SUKA REUR P O REUR SUB TEHSIL REWALSAR DISTT MANDI H P 175023 | REWALSAR | MANDI | HIMACHAL PRADESH | 175023 | ₹10.6 Cr+₹59.7 L (6.00%) | L4 | Rejected-Finance L4 |
| 5 | L5₹10.7 Cr+₹71.7 L (7.19%)Rejected-Finance R O VPO DAULATPUR CHOWK TEHSIL GHANARI DISTRICT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹10.7 Cr+₹71.7 L (7.19%) | L5 | Rejected-Finance L5 |
Tender Value
₹11.7 Cr
EMD Value
₹21.7 L
Closing Date
16 Sept 2025, 11:00 amClosed
Executive Engineer
Executive Engineer HPPWD Division Nadaun
Building Portion including water supply sanitary Installation, Septic tank, Rain water Harvesting System, Boundary wall site development ctcetera.
2025_PWD_114311_1
Cost of Tender Form online and offline mode
Open Tender
Civil Works - Buildings
Percentage
540 days
Nadaun
Please refer Tender documents.
17 documents required · 17 mandatory
₹20,000
Executive Engineer HPPWD Nadaun
₹21.7 L
22 Nov 2025
10 Sept 2025
16 Sept 2025
10 Sept 2025
16 Sept 2025
10 Sept 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (hydraulic excavator)/ manual in all height and depths and in all kind of soil including saturated soils comprising of pick work, jumper work, pick jumper work, blasting work both in soft and hard rocks, chiseling/ wedging out of rock (where blasting is prohibited) and their intermediate classification of soil , setting out true to the required line, grades, width, cutting and trimming of side slopes as shown in the drawing and if water is met with in the excavation due to springs, seepage, rain and other causes it shall be removed by the suitable diversion pumping or bailling out and excavation shall be kept dry wherever so required by the contractor at his own cost as directed by the Engineer-In-Charge and disposal all surplus excavated soil in acquired width or at an approved dumping site including its stacking leveling dressing including all lead and lifts by head load, mechnical transportation or by any oyher mode of transportation with all cost of labours, machineries and other incidentals to complete the work as per HP PWD specification. Any loss to the public/ private property during the course of execution and disposal of unserviceble meterial shall be the absolute responsibility of the contractor which shall have to be compensated by him in all case. The rate is including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government. | 1 | Per cubic Metre | 194.2 | ₹194.01 |
| 2 | Excavation work by mechanical means (hydraulic excavator)/ manual in all height and depths and in all kind of soil including saturated soils comprising of pick work, jumper work, pick jumper work, blasting work both in soft and hard rocks, chiseling/ wedging out of rock (where blasting is prohibited) and their intermediate classification of soil , setting out true to the required line, grades, width, cutting and trimming of side slopes as shown in the drawing and if water is met with in the excavation due to springs, seepage, rain and other causes it shall be removed by the suitable diversion pumping or bailling out and excavation shall be kept dry wherever so required by the contractor at his own cost as directed by the Engineer-In-Charge and disposal all surplus excavated soil in acquired width or at an approved dumping site including its stacking leveling dressing including all lead and lifts by head load, mechnical transportation or by any oyher mode of transportation with all cost of labours, machineries and other incidentals to complete the work as per HP PWD specification. Any loss to the public/ private property during the course of execution and disposal of unserviceble meterial shall be the absolute responsibility of the contractor which shall have to be compensated by him in all case. The rate is including octroi, royality, Malkana, toll tax, GST or other taxes imposed by the Government. | - | Per cubic Metre | 390.9 | - |
| 3 | Excavating trenches of required width for pipes, cables, etcetera including excavation for sockets, and dressing of sides, ramming of bottoms, upto any depth including getting out the excavated soil, then returning the soil as required, in layers not exceeding 20 cm (Twenty centimetre) in depth, including consolidating each deposited layer by ramming, watering, etcetera and disposing of surplus materials/excavated soil as per specification, approved drawing, design, specification and as per the entire satisfaction of Engineer-In-Charge, including carriage of material within all leads, lifts and other incidentals as per specifications, approved drawing, design and as directed by the Engineer-In-Charge. The rate is inclusive of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. . | - | Per Running Metre | 152.7 | - |
| 4 | Consolidation of sub grade with Road Roller 8-10 (eight - ten) Tonne, including making good the undulation etcetera with earth or quarry soil etcetera and rerolling the sub-grade completed as per HP.PWD specifications including carriage of material within all leads, lifts and other incidentals, as per approved specifications drawing, design and as directed by the Engineer-In-Charge. The rate is inclusive of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. | - | Per Square Metre | 1.4 | - |
| 5 | Providing and construction of granular sub-base 150mm (one hundered fifty milimeters) compacted thickness by providing well graded materials as per table 400.1 spreading in uniform layers with tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel roller 80-100 (Eighty-hundred) kN static roller to achieve the desired density, complete as per MORD Technical Specification section 400 for grading-I material, as per the entire satisfaction and directions of Engineer-In-Charge. The rate is including octroi, royality, Malkhana, toll tax, GST and any other taxes imposed by the Government. | - | Per cubic Metre | 1,461 | - |
| 6 | Supplying and filling in plinth with sand under floors,including watering, ramming, consolidating and dressing complete including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. | - | Per cubic Metre | 1,505.4 | - |
| 7 | Providing & Filling in plinth with hard stone under floors, including watering, ramming, consolidating and dressing complete including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. | 1 | Per cubic Metre | 1,410.5 | ₹1,409.09 |
| 8 | Providing and filling with stone boulder behind retaining walls of selected hard stone complete including carriage of material within all leads, lifts and other incidentals. The rate is inclusive of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. | - | Per cubic Metre | 1,225 | - |
| 9 | Providing and laying mechanically mixed and vibrated plain cement concrete 1:4:8 (One cement isto four sand isto eight graded stone aggregate 40mm (Forty millimetre) nominal size) and curing complete excluding cost of form work in Retaining wall/return wall/ breast wall and foundation & plinth complete as per architectural drawings including carriage of material within all leads, lifts and other incidentals, as per approved specifications drawing, design and as directed by the Engineer-In-Charge. The rate is inclusive of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. | - | Per cubic Metre | 4,538.1 | - |
| 10 | Providing and laying mechanically mixed and vibrated plain cement concrete 1:3:6 (One cement isto three sand isto six graded stone aggregate 40mm (Forty millimetre) nominal size) and curing complete excluding cost of form work in Retaining wall/return wall/ breast wall and foundation & plinth complete complete as per architectural drawings including carriage of material within all leads, lifts and other incidentals, as per approved specifications drawing, design and as directed by the Engineer-In-Charge. The rate is inclusive of octroi, royality, Malkana, Toll tax, GST and any other taxes imposed by the Government. | 1 | Per cubic Metre | 4,925.2 | ₹4,920.27 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.93 MB
SBD.pdf
Tender Documents • 8.88 MB
BOQ_166767.xls
BOQ • 0.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .