Loading…
Loading…
Tender Value
₹22.0 L
EMD Value
₹22,500
Closing Date
26 May 2026, 6:00 pmClosed
Executive Engineer, panchayat, R & B Division, Surat.
Primary School Upgration Work in Various Village of Umarpada taluka Dist. Surat.
306532
02 OF 2026-27
Open
Civil Works - Others
Works
Surat
5 documents required · 5 mandatory
₹900
Executive Engineer, panchayat R & B Division, surat
₹22,500
19 May 2026
19 May 2026
19 May 2026
26 May 2026
19 May 2026
Name of Work:- ન્યુ ગુજરાત પેટર્
Dist. Surat.[1]Upgration of Existing Primary School at Village Kakadva (Nasarpur) Ta. Umarpada
Dist.Surat.[2]Upgration of Existing Primary School at Village Kelikuva (Nasarpur) Ta. Umarpada
Dist.Surat.[3]Upgration of Existing Primary School at Village Sadadapani Ta. Umarpada Dist.Surat..[4]Upgration of
Existing Main Primary School at Village Sarda Ta. Umarpada Dist.Surat.[5]Const. of Compound Wall in Main Primary
School at Village Sarda Ta. Umarpada Dist.Surat.
: : BILL OF QUANTITY.' : :
Percentage Rate Tender
It. Description of Item (with brief Specification Rate In
Quantity Unit Amount
No. and reference to book of specifications) Figures
1 (A) Providing and laying internal cement based 537.26 Sqmt 899.00
water proofing treatment including preparation of
surface as required for tretment of roofs,
balconies, terrace,etc. consisting of following
(a) Applying and grouting a slurry coat of neat
cement using 2.75 kg/sqm of cement admixed
with proprietary water proofing compound
conforming to IS : 3645 over the R.C.C. slab
including cleaning the surface before tretment.
(b) Laying cement concrete using brocken
bricks/brickbats 25 mm to 100 mm size with
50% of cement mortar 1:5 admixed with proper
water proofing compound confirming to IS :
over 20 mm thick layer of cement mortar of mix
1:5 admixed with proprietary water proofing
compound confirming to IS : 2645 to required
slope and treting simillary the adjoining walls up
to 300 mm height including of junction of walls
(c) After two days of proper curing applying a
second coat of cement slurry admixed with
proprietary water proofing compound confirming
(d) Finishing the surface with 20 mm thick
joinless cement mortar of mix 1:4 admixed with
proprietary water proofing compound confirming
to IS : 2645. and finally finishing the surface with
neat cement slurry and making of 300 x
Providing and laying broken chine mosaic 673.04 Sqmt 779.70
flooring for terrace using 12 mm to 20 mm
broken pieces of glazed tiles to be laid over
cement mortar 1:3 to plain or slope and to be
tempered to bring mortar creme out upto surface
using white cement including rounding off
junctions and extending them upto 15 cm along
the wall,clearing with water and oxalic acid etc.
3 Dismentaling of sheet roofing including ridges, 173.20 Sqmt 50.63
Hips, Valleys, Gutters etc. stacking of
serviceable materilas and disposal of
unserviceable materials with all lead and lift.(i)
G.I.sheet roofing
4 Steel work, welded in built up sections framed 13.10 Qui 9375.33
work including cutting, hoisting, fixing in position
and applying a priming coat of red lead paint. (D)
In trussses and trussed purlins, upto 25 M. span
and 15 M. ovarall height.
5 Providing and fixing, repairing of door & window 6.73 Sqmt 2878.50
35 mm thick shutters for Doors, windows any
track of aluminium window and clear story
windows and 4mm frosted glass including Two
coats of oil paint to wooden surfaces and
Stainless steel decorative type designs all
necessary fixtures / fastening with ancore
fastening of old granite or teak wood frame all
labour etc.as directed by engineer in charge.
6 Providing 15mm thick cement plaster in single 227.60 Sqmt 161.20
coat on Rough (Similar)side of single or half
brick walls for interior plastering upto floor two
level and finished even and smooth in (ii)
Cement mortar 1:4 (1-cement :4-sand)
7 20 mm thick sand faced cement plaster with on 228.50 Sqmt 315.69
wall upto all height above ground level consisting
12 mm thick backing coat of c.m. 1:3 (1 cement :
3 sand ) and 8 mm thick finishing coat of cm 1:1
(1 cement : 1 sand) etc. complete.all height etc.
8 Finishing wall with weather proof exterior 771.62 Sqmt 129.43
emulsion paint on wall surface (two coats) to
give an required shape even shade after
thoroughly brushing the surface to remove all
dirt, and remains of loose powdered materials
including Cement washing with portland cement
slurry of one coat on wall surface to give a
smooth finish including thoroughly broomings
the surface to remove all dirt, mortar drops and
other foreign Brand etc complete as directed by
Engineer Incharge
9 Wall painting (two coats) with plastic emulsion 315.35 Sqmt 102.83
paint of approved brand and manufacture on
undecorated wall surface to give an even shade
including throughly brushing the surface free
from mortar droppings and other foreign matter
and sand papered smooth including Applying
two coats of acrylic laphy (putty) & two coats of
primer of approved brand etc complete as
directed by Engineer incharge.
10 Providing corrugated G.I. sheet of class-3 96.20 Sqmt 734.19
roofing ( Colour Coated) fixed with glavanished
iron J or L Hooks, Bolts and nuts 8mm diameter
with bitumen and G.I. limpet washer or G.I.
limpet washer. filled with white lead complete
excluding the cost of purlins, Rafters and
Trusses.(1) 0.80 mm thick sheet.
11 Wall painting of diffrent type of Picture, Alfabet 1.00 Job 15150.00
chart, Number chart, Bird and Animal picture,
Pyramid and Nandghar logo, Map of Taluka-
Dist., Vehicle, Scale etc. with oil paint as per
instruction by Engineer-In-Charge and ICDS
12 Providing Green Marble for Stair Toppa & Riser 1.80 Sqmt 2525.00
storage cabat partion,self complate with material
like cement,marble,camical etc complate
including all Labour work complate as per
drawing and direction by Site Engineer
13 Providing and fixing side hunge Single shutter 1.89 Sqmt 6079.53
Door including using I.T wood frame having size
13x7.5 cm,shutter frame of indian teakwood of
38 mm thick and pannel of both side
prelaminated particle board 19 mm thick of
natural wood grain shed with fixing of 2x3 cm
T.W. moulding on both side, as per detail
drawing including three coat of oil paint with
primer etc complete as per instruction of
Engineer in charge & approved make.
14 Excavation for foundation upto 1.5 m depth 58.75 Cum. 268.93
including sorting out and stacking of useful
materials and disposing off the excavated stuff
upto 50 Meter lead.(C) Hard Murrum
15 Filling available excavated earth (excluding rock 29.38 Cum. 136.92
in trenches plinth, slides of foundations etc. in
layers not exceeding 20 cm in depth
consolidating each deposited layer by ramming
16 Providing and laying cement concrete 1:2:4 (1- 4.90 Cum. 3741.69
Cement : 2- Coarse sand : 4- graded stone
aggregates 20 mm nominal size) and curing
complete excluding cost of formwork in (A)
Foundation and Plinth (more than 10 ton)
17 Providing and laying controlled cement concrete 11.49 Cum. 4342.50
M.200 and curing complete the cost of formwork
but excluding reinforcement for reinforced
concrete work in (A) Foundations, footings, Base
of columns and Mass concrete. (more than
18 Providing and laying controlled cement concrete 1.88 Cum. 9471.02
M-200 and curing complete including the cost of
form work but excluding cost of reinforcement
for reinforced concrete work for Column upto
19 Providing and laying controlled cement concrete 6.20 Cum. 6339.38
M.200 and curing complete the cost of formwork
but excluding reinforcement for reinforced
concrete work in (D) Columns, Pillars posts and
struts, upto floor two level. (more than 10 ton
20 Brick work using common burnt clay building 3.10 Cum. 4214.33
brick having crushing strength not less than
kg/sq. cm. in foundation and plinth in cement
mortar 1:6 ( 1 Cement: 6 fine sand) (B)
21 Providng TMT bars renforcement of FE 3814.06 kg 77.29
500/500D for R.C.C. work including bending
binding and placing in position complete for all
22 Providing and laying controlled cement concrete 4.69 Cum. 9503.27
M.200 and curing complete the cost of formwork
but excluding reinforcement for reinforced
concrete work in (D) Columns, Pillars posts and
struts, upto floor two level.
23 Providing and casting in situ ordinary cement 3.10 Cum. 4232.51
concrete M-150 for coping, over riding returns
including formwork curing and finishing complete.
24 Brick work using common burnt clay building 38.21 Cum. 4503.05
brick having crushing strength not less than
kg/sq. cm. in super structure above plinth level
up to floor two level in cement mortar 1:6 (
Cement: 6 fine sand) (B) Convention for G.F
25 Demolition of Existing Compound Wall Brick 1.00 Lums 20200.00
work and RCC Work including stacking of
serviceable materilas and disposal of
unserviceable materials with all lead and lift
I / Weam / are willing to carryout the work at…………………. % above/ below percent (Should Be written in
figures and words) of the estimated rate mentioned above Amount of my / our tender works out as under.
*Estimated amount put to tender *Estimated amount put to tender
Deduct ……. % below Rs…………………… Add ………........% Above
*( please strike out whichever is not applicable)
1 The Contractor shall exhibition board with detailed specification and details of works directed
by the Engineer – In – Charge for which no extra payment shall bemade.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt G.R.: PRC-10/2017 Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R.
therefore in R.C.C. items where the reisa change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Executive Engineer
Signature of the contractor Panchayat (R & B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3.Cement Standards -11-05-17 GR 2 Side.pdf
4.Tender Negotiation.pdf
5.Laboratory GR.pdf
6.GST GR.pdf
7.Steel Lap.pdf
11. Other GR.pdf
8.Clause 47 48.pdf
14 Building Booklet civil.pdf
Cement consumption gr.pdf
GST GR 1.pdf
Inspection 1.pdf
Laboratory GR 1.pdf
Steel Lap 1.pdf
5.GR.pdf
4.0 tender booklet.pdf
GR.pdf
CamScanner 04-09-2025 15.03.58.pdf
GRs - SBD with Index_11zon (1).pdf
DMO_2876_01-May-2025_273.pdf
SBD સાથે જરૂરી દસ્તાવેજો For VC AND SC.pdf
GRs - SBD with Index_11zon (2).pdf
BOQ.pdf
SBD .pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .