| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.3 CrAdmitted-Finance | -3.08% | ₹5.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.4 CrAdmitted-Finance | -1.25% | ₹5.4 Cr | L2 | Admitted-Finance |
| 3 | L3₹5.4 CrAdmitted-Finance | -1.00% | ₹5.4 Cr | L3 | Admitted-Finance |
| 4 | L3₹5.4 CrAdmitted-Finance E 315 1ST FLOOR SECTOR 27 NOIDA G B NAGAR 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | -1.00% | ₹5.4 Cr | L3 | Admitted-Finance |
Tender Value
₹5.4 Cr
EMD Value
₹12.8 L
Closing Date
11 May 2026, 5:00 pmClosed
GM-CIVIL
SECTOR-6, NOIDA
M/o Road (Demolishing Unauthorised CC/RCC Ramps and P/L CC Paver Block At Road Patries of 30.00M and 24.00M Wide Internal Roads in H-Block Sector-63), Noida.
2026_NOIDA_1145044_1
04/DGM(C)/SM(WC-4)/ET/2025-26
Open Tender
Civil Works - Others
180 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,260
NOIDA
₹12.8 L
27 May 2026
4 May 2026
12 May 2026
4 May 2026
11 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 3,464 | Cum | 923.42 | ₹31,98,726.88 |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 79 | Cum | 1,347.16 | ₹1,06,425.64 |
| 3 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 692 | Sqm | 50 | ₹34,600 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over area (exceeding 30 cm in depthm1.50m in width as well as 10sqm on plan), including getting out and disposal of excavated earth, lead upto 50mand lift upto 1.5m as direction by engineer incharge.The contractor has defet different utilities like sewer line water supply line electric cable ,telephone cable,gas pipe line etc. using utility detecting machine before start of excavatino and shall start excavtion only after getting permission of Engineer in charge. | 7,708 | Sqm | 136 | ₹10,48,288 |
| 5 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. 80 mm thick C.C. paver block of M-30 grade with approved color design and pattern. | 30,623 | Sqm | 782.85 | ₹2,39,73,215.55 |
| 6 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with morth grader on prepared surface, mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density complete as per clause 401 | 4,625 | Cum | 4,093.5 | ₹1,89,32,437.5 |
| 7 | Laying old cement cocrete interlocking paver blocks of any design/shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineerin-charge. (Old CC paver blocks shall be supplied by the department free of cost). | 208 | Sqm | 241.95 | ₹50,325.6 |
| 8 | Disposal of building rubbish/malba/similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 11,798 | Cum | 120.55 | ₹14,22,248.9 |
| 9 | Cement concrete with 4 cm gaug approved stone ballast, course sand & cement in proportion of 4:2:1 including supply of all materials labour tools and plant etc. required for proper completion of work Same as above item No. 279 but with 2cm gaug stone grigt insted of 4 cm gauge stone ballast. | 125 | Cum | 7,000 | ₹8,75,000 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 830 | Sqm | 181.64 | ₹1,50,761.2 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
BOQ_2140036.xls
BOQ • 0.25 MB
Capability04.xls
Additional Documents • 0.05 MB
TD04New.pdf
Tender Documents • 5.82 MB