| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 LAccepted-AOC | ₹24.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹25.4 LRejected-AOC KOLATH NILAPOLA P O | KERALA | ₹25.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | JACOB GEORGE L2 | Lukose Pachan L1 |
|---|---|---|---|---|---|
| 1.00Construction of Motor Shed | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 13.71 | cum | 257.63 ₹3,532.11 | 244.26 ₹3,348.80 |
| 1.00 | OD18812/2025-2026:Common Approved OD- 3.1:Supplying and stacking well matured straight 6m long coconut post having avg diameter on
25cm for driving down through various strata below bed level including cost coveyance
labour charges etc complete. | 72 | metre | 159.71 ₹11,499.12 | 151.42 ₹10,902.24 |
| 1.00 | OD18813/2025-2026:Common Approved OD- 3.2: Driving down coconut pile to lines and levels through soft to medium clay soil strata including
all hire charges and labour and all other appliances necessary for pile driving down after
pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m
Details for 90m length. | 60 | metre | 246.29 ₹14,777.40 | 233.51 ₹14,010.60 |
| 1.00 | OD18814/2025-2026:Common Approved OD-1.4 : Dry stone packing under foundation with good quality blasted rubble including conveyance o
material and labour charges etc. complete as per direction of departmental officers at site. | 1.49 | cum | 3,537.2 ₹5,281.04 | 3,353.62 ₹5,006.95 |
| 1.00 | OD18808/2025-2026:Filling with Quarry Muck
Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers , levelling the top at site and consolidation by ramming , etc complete for improving the CBR value of subgrade | 4.12 | cum | 909.57 ₹3,745.61 | 862.36 ₹3,551.20 |
| 1.01 | OD18811/2025-2026:Common Approved OD- 3.13: Cutting and removing the excess length of Wooden/ Coconut piles to lines and levels
removing the cut end of piles and stacking within 150m | 16 | each | 228.01 ₹3,648.16 | 216.18 ₹3,458.88 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 7.02 | sqm | 386.16 ₹2,710.84 | 366.12 ₹2,570.16 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.96 | cum | 7,932.89 ₹31,414.24 | 7,521.17 ₹29,783.83 |
| 1.01 | OD18815/2025-2026:Common Approved OD-1.2: Dry rubble masonry (without concrete levelling course) with good quality blasted rubble and packing to compactness to lines and levels cost and conveyance of
all materials labour charges etc. complete as per direction of Departmental officers at site | 3.24 | cum | 5,111.8 ₹16,562.23 | 4,846.5 ₹15,702.66 |
Tender Value
₹25.4 L
EMD Value
₹50,000
Closing Date
18 Feb 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER K.D DIVISION THANNEERMUKKOM
GENERAL-KP - FMP -Infrastructure development works - for Mundar Kangazha 8 Padasekharam in Kallara Panchayat in Vaikom LAC -General Civil Work
2026_Irrig_835410_1
26/EE/KD/2025-26
Open Tender
Civil Works - Others
270 days
KALLARA
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
23 May 2026
10 Feb 2026
21 Feb 2026
10 Feb 2026
18 Feb 2026
10 Feb 2026
Construction of Motor Shed
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD18812/2025-2026:Common Approved OD- 3.1:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost coveyance labour charges etc complete.
OD18813/2025-2026:Common Approved OD- 3.2: Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length.
OD18814/2025-2026:Common Approved OD-1.4 : Dry stone packing under foundation with good quality blasted rubble including conveyance o material and labour charges etc. complete as per direction of departmental officers at site.
OD18808/2025-2026:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers , levelling the top at site and consolidation by ramming , etc complete for improving the CBR value of subgrade
OD18811/2025-2026:Common Approved OD- 3.13: Cutting and removing the excess length of Wooden/ Coconut piles to lines and levels removing the cut end of piles and stacking within 150m
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
OD18815/2025-2026:Common Approved OD-1.2: Dry rubble masonry (without concrete levelling course) with good quality blasted rubble and packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
50.9.1.1:Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately), using good quality Anjili wood /jack wood
50.9.6.1:Providing and fixing glazed shutters for doors, windows and clerestory windows using 4 mm thick float glass panes including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws. Using Anjili wood / jack wood 30 mm thick shutters
9.48.2:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to openings/ wooden frames with rawl plugs screws etc
50.9.15.3:Providing and fixing iron hooks and eyes : 200mm.
50.9.15.5:Providing and fixing iron hooks and eyes: 100 mm
10.16.2:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished seamless type tubes
OD18810/2025-2026:Providing and fixing precoated Aluminium strong profile sheets 0.45mm thick and 1.80kg/m2(size, shape and pitch of corrugation as approved by Engineer in charge) 0.50mm(+/- 0.05%) total coated thickness with zinc coating 120grams per sqm as per IS:277 in 240 Mpa steel grade ,5-7 microns epoxy primer on both sides of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should supplied in single length up to 12m or as disired by Engineer in Charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm)with EPDM seal complete up to any pitch in horizontal/vertical or curved surfaces excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
OD18809/2025-2026:Providing and fixing precoated aluminium sheet roofing accessories 0.50 mm (+0.05%) totalcoated thickness, as per IS: 737-2008, tensile strength 250 MPa, 5-7 microns epoxy primer or similar coating on both side of the sheet and polyester top coat 15-18 microns using self drilling/self tapping screws complete: Ridges plain (500-600 mm)
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.6.1:20 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
10.6.1:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x1.25 mm M.S. laths with 1.25 mm thick top cover
10.7:Providing and fixing ball bearing for rolling shutters.
13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm
13.48.3:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture
13.48.2:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Painting wood work with Deluxe Multi Surface Paint of required shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.75 ltr/10 sqm of approved brand and manufacture
Construction of Retaining wall
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
OD18799/2025-2026:Common Approved OD-1.4 : Dry stone packing under foundation with good quality blasted rubble including conveyance o material and labour charges etc. complete as per direction of departmental officers at site.
OD18797/2025-2026:Common Approved OD-3.4 : Supplying and Stacking well matured 1/2 split and straight coconut post for driving down through various strata below bed level including cost, conveyance, labour charges etc complete
OD18798/2025-2026:Common Approved OD-3.5: Driving down coconut pile half split to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length.
OD18796/2025-2026:Common Approved OD-3.7: (60.64.3). Coconut pile -Supplying 1/4 split well matured and straight coconut wailing pieces of required length and tied to the post with iron wires etc complete as per standard specification.
OD18800/2025-2026:Common Approved OD-1.2: Dry rubble masonry (without concrete levelling course) with good quality blasted rubble and packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Desilting of Outer thodu
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD44223/2025-2026:Strengthening slopes/earthern bund using coir geo-textiles (740GSM) etc complete including conveyance and all other incidental charges as per the directions of the departmental officers at site.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1405601.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
viewsbd.pdf
Tender Documents • 2.53 MB
BOQ_1405601.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid