Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹10,800
Closing Date
30 Jan 2025, 3:00 pmClosed
COMMISSIONER, KADAYANALLUR MUNICIPALITY
MUNICIPAL OFFICE, KADAYANALLUR
GENERAL FUND Opertration and Annual Maintenance works to the Fecal Sludge Treatement Plant at Kadayanallur Municipality
2025_MAWS_521078_1
3229/2023/E1
Open Tender
Operations & Maintenance Contract
Item Rate
365 days
KADAYANALLUR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,800
30 Jan 2025
30 Jan 2025
30 Jan 2025
30 Jan 2025
30 Jan 2025
30 Jan 2025
Amount
A.Personnel Cost Supervisor: Personnel to keep record of the daily plant activities and to carry out the required operational activities mentioned in the O&M Protocol. Technical Assistant Gr.III (Diploma in Engg. Failed / ITI (Civil) passed.TN PWD SOR 2021-2022 Basic rates of Labourers (76C-Pg.10) including 13.61% and Insurance 1.37%.
Skilled Labour: Personnel to carry out the required operational activities mentioned in the O&M Protocol as instructed by the Supervisor. Mazdoor Category-I TN PWD SOR 2021-2022 Basic rates of Labourers (39A-Pg.12) including 13.61% and Insurance 1.37%.
Unskilled Labour: Personnel to carry out activities which require more labour than the regular labour. Mazdoor Category-II TN PWD SOR 2020-2021 Basic rates of Labourers (39B- Pg.13) including 13.61% and Insurance 1.37%.
B.Operational cost Pumps (Maintenance- spares and replacement): Solar-20% per year Maintenance cost
Pumps (Maintenance: spares and replacement)-Electric pumps- 20% per year Maintenance cost
Operation and Maintenance cost for Diesel Generator; (2.5 litres required for one hour operation)-240 litres Assuming 1 day of 8 hour power cut per month. Considering a fuel rate of Rs 70/L, Rs 175 will be spent for one hour of operation.
Operation and Maintenance cost Mechanized Tiller trailer: Considering 2 hours operation per day (2 litres required for one hour operation) Additional 10 rupees provided over existing diesel price to accommodate lubricant costs.
Electricity charges: 3- 75 watts fan, 4 Tube lights - 60 watts, 5 pumps-1HP & 2 HP (TN electricity board, rates for ULBs)
Safety equipments: All material safety gears for driver and operator such that includes (Facemask, helmet, pair of safety gloves, pair or gumboots and other special equipment’s for operator
Testing of treated water: Sampling and testing of inlet, outlet and sludge samples at periodic intervals in a NABL accredited laboratory (3 samples on quarterly basis)
Water charges: Supply of potable water from municipal sources or any other approved source to the treatment plant. Cost shall include the cost of water and transportation- every month (TWAD Board rate for ULBs)
Stationary and General item:Purchase of necessary stationary/general items for the treatment plant office (every month)
Abdul Malik (BID ID -1241578)
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .