Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 37 205 A 2 A 1 BUNDHU KATRA GWALIOR ROAD AGRA 282001 | AGRA | UTTAR PRADESH | 282001 | Admitted-Finance |
| 2 | Admitted-Finance BELA ROAD DIBIYAPUR BELA ROAD DIBIYAPUR AURAIYA UTTAR PRADESH 206244 | AURAIYA | UTTAR PRADESH | 206244 | Admitted-Finance |
| 3 | Admitted-Finance GROUND FLOOR PLOT NO 83 OFFICENO 08 RISHABH ARCADE SECTOR 08 GANDHIDHAM 370201 | GANDHIDHAM | KUTCH | GUJARAT | 370201 | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Techno-commercially Not acceptable |
| 5 | Rejected-Technical | Rejected-Technical Techno-commercially Not acceptable |
Tender Value
Refer Docs
EMD Value
₹9,900
Closing Date
29 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM (M and C)
SRPL Chennai
SRPL22C102
2023_SRCHN_165369_1
SRPL22C102
Open Tender
Mechanical Works
Works
90 days
Chittoor
Please refer Tender documents.
6 documents required · 6 mandatory
₹9,900
Yes
24 Jul 2023
24 Apr 2023
30 May 2023
24 Apr 2023
29 May 2023
24 Apr 2023
24 Apr 2023 - 19 May 2023
Amount
Transmix Tank M&I
Scrapping: Removal of Manhole covers followed by thorough scraping of the inside of the tank including tank bottom, roof leg support s and shell internals, lower part of floating roof and appurtenances etc. along with the supply of tools, tackles, labor, etc., to c omplete the work in all respects and make the tank safe to carry out hot works as per direction of site engineer/EIC. Collection of sludge mixed with water as per technical specifications and storing the same in contractor supplied properly sized closed plastic dr ums / containers and as per instructions of EIC / Site Engineer.
Shifting of Sludge: Shifting of evacuated sludge mixed with water containers from Tank farm area to pipeline scrap storage shed (app rox sludge mixed with water 2KL, Distance from Transmix Tank to pipeline scrap storage shed - 800mtr)
De-gasification: Installation of temporary flame proof eductor / exhuast fans in shell manholes and roof manholes and operating it f or ventilation and gas freeing of the tank until LEL becomes zero as per the directions of EIC, taking all safety precautions and de gasification of the tank to make it 100 % gas free including supply of all equipments, manpower, tools, tackles, consumables, non-co nsumables, PPEs, fire and safety appliances, breathing apparatus etc., to complete the job in all respects as per the direction of E IC/ Site Engineer and tender specifications. Calibrated explosive meter should be brought by the contractor to continuously monitor the LEL & oxygen level inside the tank. Double earthing of all the equipments like exhaust/ eductor fan etc. shall be done.
Blinding & De-blinding: Blinding for isolating the tank and de-blinding after the completion of M&I works of tank inlet/ outlet/surg e line. Scope of work includes removal fo spool pieces between DBBV and ROSOVs, blinding the inlet/outlet/surge (10", 6", 4" dia.) l ine at both ends with contractor supplied BLRFs, SWMG gaskets, etc. along with the retrieval of residual product . After the complet ion of M&I works, spool pieces to be re-installed and BLRFs to be handed over to owner etc. as per the directions of EIC.
Tank Inspection: Carrying out inspection of tank through API 653 certified tank inspector as per the API 653 checklist and submissio n of report both in hard & soft copies indicating the condition of the tank and recommendations for repair action if any etc. includ ing submission of API 653 certification documents of Tank inspector to the owner.
Boxing up: Boxing up the manhole cover of the tank including supplying and fixing 3mm thick metallic type CAF- 9 gaskets of HINDUSTA N FERRODO / approved equivalent make as per IS 2712- 1979 with TVS/Unbrako make mild steel fasteners as per IS 1367- 1967 and washe rs of approved quality.
Calibration of Tank: (a) Bottom Calibration with actual physical measurement by water meter & (b) tank shell calibration by Strappin g periphery of different Strakes above and below the horizontal joints including arranging for the stapping tape. Item includes cost towards Statutory authority Payment to be made to the authorities and all other incidental costs. Item Includes Preparation and Sub mission of Calibration charts in quadruplicate duly approved by tank calibration authority .The Scaffolding shall be paid extra unde r respective item. Water if required for filling above datum plate for full calibration of the tank shall be paid extra as per respe ctive item in SOR.The job (rate) also includes boxing up of tanks with new Gasket/fastners as per Specifications of SOR above .
Hydrotest: Carrying out hydrotest of tanks excluding supply of water. Cleaning of tank after hydrotest, boxing up of tank after com pletion of all works & inspection, including supplying and fixing new gasket along with new high tensile stud,bolts (Unbrako/TVS mak e) & nuts confirming to IS 1363 & 1367 and washers of approved quality . Job includes all Man holes ,Nozzles,Inlet /outlet valves, w ater draw off valves etc. complete & as per instruction at site. Water conveying pipes, water pumps, all material and labour, as req uired shall be arranged by the contractor Including providing rubber gasket for hydrotesting. WATER shall be provided by IOCL withi n terminal premises. However the vendor shall make all neccessary arrangements to pump the water into tank & to drain out the water also at no extra cost to IOCL. scafolding if required shall be paid extra as per SOR item.
DP Test: Conducting Dye penetration test on the weld joints upto 500 mm length (shell to bottom plate, pad plates of roof supports t o decks, lower deck plate with leg sleeve, manhole neck, rolling ladder etc) etc as directed by IOCL.
Oil Chalk test: Testing of weld joints by Chalk- Kerosene test including required machinery, labour and consumable items as directe d by IOCL.
WFMPI Test: Conducting weld inspection of all weld joints on shell by wet Fluorescent Magnetic Particle with UV lamp including super vision by qualified inspector with ASNT level 2 certification. Note: Scaffolding will be paid separately.
LFET: Carrying out bottom plate floor scanning of storage tanks using either Low Frequency Electromagnetic Testing (LFET) or Magneti c Flux Leakage (MFL) technique to identify corrosion, pitting, thickness loss, perforation on product as well as soil side of bottom plates. Ultrasonic thickness check of the inaccessible area where MFL / LFET scanning is restricted. Confirmation and sizing of def ects by use of UT gauge. Submission of detailed analysis report by ASNT Level II inspector plate wise and indicating defects for mor e than 20% wall loss along with calibration certificates of the equipment used.
UT Testing: Carrying out UT testing of Shell plates with a calibrated UT gauge and submission of report as per the direction of EIC / Site Engineer. No. of Shells are six nos. and no. of plates in each shell are five nos. The job includes UT testing of each plate at nine locations and marking of the same with enamel paint on the tank as per the direction of EIC / Site Engineer
Scaffolding: Providing and fixing double scaffolding system on the up to 25 meter height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube jallies, M.S. clamps and M.S. stair case system in the scaffolding for working platform etc. conforming to IS: 2750 & 4014 (Part I & II) and maintaining it in a service able condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bra cings, runners, connection with the building, tank etc wherever required for inspection of work at required locations with essentia l safety features for the workmen etc. complete as per directions and approval of Engineer- in-charge .The elevational area of the s caffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. Item includ es cost towards Statutory authority for obtaining strucural stability certificate and submission of certificate to owner
Dismantling: Dismantling the cooling rings of the tank by gas/hacksaw cutting from the existing weld seams & removing from the tank by mechanical means, with utmost precaution and storing as indicated by IOCL anywhere in IOC premises, complete, irespective of le ad and lift as directed. The rate includes the cost of labour, gases, providing necessary temporary supports, safe walk ladder, safe ty precautions etc., all necessary equipments, all necessary structures, clamps, suitable non-combustible material wedges, etc. comp lete to the satisfaction of IOCL. Plan area . Note: Contractor has to submit the dismantling methodology clearly stating the restr aining techniques to be involved so that circularity of the undamaged shell plates remains undisturbed, prior to commencement of wo rk and has to get it approved from IOCL. Plates and structures, apputenances should be dismantled with utmost care as these are to b e reutilised. Dismantled material will be property of IOCL. Scaffolding shall be paid seperately.
GI Pipe nipple: Providing & fixing of 1/2" GI Pipe nipple for fixing spray nozzles at a distance of 600mm in the sprinkler ring i ncluding machinerry , labour etc for completion of work. Scaffolding shall be paid extra if required.
Sprinkler Nozzles: Supply of Spray Nozzles( Material- brass) : Supply, handling, erection, testing & commissioning of Medium Velocit y Water Spray Nozzle of all types in 1/2" BSPT male thread including all necessary consumables complete in all respect as per the direction of IOCL. Nozzles to be replaced exactly as per existing type of nozzle installed.
U Clamp: Supply & installation of MS Galvanised "U" clamp of size including providing M16 U-bolts with nuts suitable for 0-100 mm pi pe.
Lap joint repair: All weld defects in Lap joints in Shell plates should be removed by fine grinding and rewelding to be carried out to ensure no further weld defects. Welding to be carried out using E6013 electrode.Scaffolding shall be paid seperately
Buttweld repair: Repair of defective weld joints by grinding/gouging to required depth and rewelding by qualified welder to require d length. After repair the weld joints will be subjected to Dye Penetration test. Cost of Dye penetration test will be paid separat ely. In case after repair, the weld joint is again found defective, rectification & testing will be done free of cost. Scaffolding s hall be paid seperately
Weld build-up: Weld build-up of all deep pits at corroded sections of shell plates and at some places in the lower portion of the sh ell plates using E6013 electrode with minimum current application and ground flushing.Scaffolding shall be paid seperately
Vaccum Box testing: Conducting Vacuum Box testing of roof/bottom plates at specified pressure(vacuum) Upto 10 M length of weld joint including supply of all required equipments like vacuum box, vacuum pump etc. complete as per instruction of site-in-charge.
"PAINT REPAIR- REPAINTING INTERNAL SURFACE OF TANKS IN HYDROCARBON SERVICE EXCEPT ATF. Surface preparation by ST-3 PRIMER :POLYAMIDE CURED EPOXY ZINK PHOSPHATE (P2) 1 COAT DFT = 70-75 MICRONS FINAL COAT: AMINE ADDUCT CURED HB EPOXY LINER (F3) 2 COATS 100-125 MICRONS PER COAT DFT = 200-250 MICRONS NOTE : THE COST OF SCAFFOLDING SHALL BE PAID EXTRA AS PER ACTUAL MEASUREMENT AND RESPECTIVE ITEM IN SOR."
Replacement of damaged portion of seal (Primary & Secondary) with new PE wiper seal. The job includes supply & installation of required qty. of seal length as per Tank inspection report submitted by API 653 Tank inspector.
Mitra Contractors
JAIN CONSTRUCTION COMPANY
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .