| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹18.2 CrAccepted-AOC VILLAGE FAZALPUR BEHIND FOCAL POINT JALANDHAR | JALANDHAR | JALANDHAR | PUNJAB | ₹18.2 Cr Quoted ₹18.8 Cr | L-1 | Accepted-AOC Found Lowest one |
| 2 | L-2₹19.6 Cr+₹78.4 L (4.17%)Rejected-Finance DAM ROAD TALWARA TOWNSHIP DISTT HOSHIARPUR PB | ₹19.6 Cr+₹78.4 L (4.17%) | L-2 | Rejected-Finance High rate quoted |
| 3 | L-3₹20.0 Cr+₹1.2 Cr (6.46%)Rejected-Finance SCO 36 SECTOR 7 C MADHYA MARG CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160019 | ₹20.0 Cr+₹1.2 Cr (6.46%) | L-3 | Rejected-Finance High rate quoted |
| Sl No | Description | Qty | Unit | R.G. INDUSTRIES L1 | S.k.sharma contractor and engineer L2 | Unipro Techno Infrastructure Pvt Ltd L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in earth work pick work, jumper work, blasting prohibited bailing or pumping out water dewatering upto all lifts and depth Stacking the excavated soil not more than 3mtr clear from the edge of the of excavation and then returen the stacked soil in 15cm layers when required into plinth of foundation etc.consolidating each deposited layer by ramming watering and then disposing of all surplus exacavated earth as directed by the Engineer-in-Charge. | 38,280.62 | Cum | 840 ₹3,21,55,720.8 | 750 ₹2,87,10,465 Lowest | 858 ₹3,28,44,771.96 |
| 2.00 | a) Chiselling /Wedging out of rock where blasting is prohibited 30% | 13,008.25 | Cum | 1,850 ₹2,40,65,262.5 Lowest | 2,000 ₹2,60,16,500 | 1,918 ₹2,49,49,823.5 |
| 3.00 | Providing and laying cement concrete 1 : 4 : 8 (1 Cement : 4 Sand: 8 Graded stone aggrigate 40 mm nominal size) and curing complete in FOUNDATION & PLINTH complete in all respect within all leads and lifts and as per directions and satisfaction of Engineer in Charge. | 872.01 | Cum | 6,400 ₹55,80,864 | 6,500 ₹56,68,065 | 6,300 ₹54,93,663 Lowest |
| 4.00Providing and laying cement concrete using concrete mix of " M-30 " but not less than 1:1.5:3 and curing complete excluding the cost of form work foundation and plinth complete in all respect within all leads and lifts and as per directions and satisfaction of Engineer in Charge. | ||||||
| 5.00 | i) Foundation & plinth base of column and like mass concrete | 745.11 | Cum | 8,500 ₹63,33,435 | 8,500 ₹63,33,435 | 8,400 ₹62,58,924 Lowest |
| 6.00 | ii) In wall any thickness i/c attached, buttresses, pillasters & their caps & bases &string courses etc.upto floor two level. | 1,346.64 | Cum | 10,000 ₹1,34,66,400 | 9,500 ₹1,27,93,080 | 9,450 ₹1,27,25,748 Lowest |
| 7.00 | iii) In suspended floor, roofs, landing & shelves & their suport balconies, beams, gorder bressumer and cantilevers uotp floor two level | 670.32 | Cum | 10,500 ₹70,38,360 | 11,000 ₹73,73,520 | 10,450 ₹70,04,844 Lowest |
| 8.00Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm. So as to give fair finish including centring shuttering strtting and proping etc. with wooden battens and balies height of proping and centring below supporing floor to ceiling not exceeding 4mtrs and removal of same for insitu-reinforcred concrete & plain concrete work in | ||||||
| 9.00 | i) Flat surface such as soffits of suspended floors roofs, landing and the likecomplete in all leads and lift as specification and direction of the Engineer-in-charge. | 880.22 | Sqm | 650 ₹5,72,143 | 625 ₹5,50,137.5 Lowest | 700 ₹6,16,154 |
| 10.00 | iii) Vertical surfaces such as walls ( any thickness) partitions and like including attached Pillasters,buttresses,plinth and string courses and the like complete in all leads and lift as specification and direction of the Engineer-in-charge. | 17,154.61 | Sqm | 550 ₹94,35,035.5 Lowest | 550 ₹94,35,035.5 Lowest | 580 ₹99,49,673.8 |
Tender Value
₹18.8 Cr
EMD Value
₹19.6 L
Closing Date
24 Jun 2025, 5:00 pmClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION PALAMPUR
Construction of 1024 No. Manhole Chambers, 50 No. Flushing Tanks, 1024 No Inspection chambers, Laying, Jointing Testing of DI pipe, Providing Laying Jointing and Testing of HDPE Pipe 160mm dia for Zone 2
2025_HPIPH_106828_1
HPIPH 1819-1869 DATED 03.06.2025
Open Tender
Civil Works
Item Rate
730 days
PALAMPUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹10,000
EXECUTIVE ENGINEER
₹19.6 L
DHARAMSHALA
8 May 2026
3 Jun 2025
25 Jun 2025
3 Jun 2025
24 Jun 2025
3 Jun 2025
10 Jun 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation trenches etc. in earth work pick work, jumper work, blasting prohibited bailing or pumping out water dewatering upto all lifts and depth Stacking the excavated soil not more than 3mtr clear from the edge of the of excavation and then returen the stacked soil in 15cm layers when required into plinth of foundation etc.consolidating each deposited layer by ramming watering and then disposing of all surplus exacavated earth as directed by the Engineer-in-Charge. | 38,280.62 | Cum | - | - |
| 2 | a) Chiselling /Wedging out of rock where blasting is prohibited 30% | 13,008.25 | Cum | - | - |
| 3 | Providing and laying cement concrete 1 : 4 : 8 (1 Cement : 4 Sand: 8 Graded stone aggrigate 40 mm nominal size) and curing complete in FOUNDATION & PLINTH complete in all respect within all leads and lifts and as per directions and satisfaction of Engineer in Charge. | 872.01 | Cum | - | - |
| 4 | Providing and laying cement concrete using concrete mix of " M-30 " but not less than 1:1.5:3 and curing complete excluding the cost of form work foundation and plinth complete in all respect within all leads and lifts and as per directions and satisfaction of Engineer in Charge. | - | - | - | - |
| 5 | i) Foundation & plinth base of column and like mass concrete | 745.11 | Cum | - | - |
| 6 | ii) In wall any thickness i/c attached, buttresses, pillasters & their caps & bases &string courses etc.upto floor two level. | 1,346.64 | Cum | - | - |
| 7 | iii) In suspended floor, roofs, landing & shelves & their suport balconies, beams, gorder bressumer and cantilevers uotp floor two level | 670.32 | Cum | - | - |
| 8 | Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm. So as to give fair finish including centring shuttering strtting and proping etc. with wooden battens and balies height of proping and centring below supporing floor to ceiling not exceeding 4mtrs and removal of same for insitu-reinforcred concrete & plain concrete work in | - | - | - | - |
| 9 | i) Flat surface such as soffits of suspended floors roofs, landing and the likecomplete in all leads and lift as specification and direction of the Engineer-in-charge. | 880.22 | Sqm | - | - |
| 10 | iii) Vertical surfaces such as walls ( any thickness) partitions and like including attached Pillasters,buttresses,plinth and string courses and the like complete in all leads and lift as specification and direction of the Engineer-in-charge. | 17,154.61 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_156450.xls
BOQ • 0.25 MB
Form6.pdf
Tender Documents • 0.58 MB
Form8.pdf
Tender Documents • 1.19 MB
DataSheetandScopeofwork.pdf
Tender Documents • 0.65 MB
Termsandconditions.pdf
Tender Documents • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .