Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.4 LAccepted-AOC | ₹91.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹95.6 LRejected-AOC | ₹95.6 L | L2 | Rejected-AOC L2 |
| 3 | L3₹97.3 LRejected-AOC | ₹97.3 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Sun Steel Industries L3 | RABI ENGINEERING WORKS PVT LTD L2 | HOLYMOON & COMPANY L1 |
|---|---|---|---|---|---|---|
| 1.00 | Fabrication, galvanizing, testing, supply & delivery of different Substation structures. | 72.39 | MT | 76,32,491.56 ₹90.1 L | 74,91,847.5 ₹88.4 L | 71,84,211.25 ₹84.8 L |
| 2.00 | Matching fasteners (G.I Bolts, Nuts and Washers) for the above structures (Grade – 5.6/5). | 4,158 | KG | 6,17,463 ₹7.3 L | 6,09,147 ₹7.2 L | 5,61,330 ₹6.6 L |
Tender Value
Refer Docs
EMD Value
₹88,500
Closing Date
22 Sept 2025, 3:00 pmClosed
Chief Engineer O and M- I
Chief Engineer, (OandM) I, WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED, Vidyut Bhaban, 10th Floor (D Block), SaltLake City, Kolkata 700 091
Fabrication, galvanizing, testing, supply and delivery of different substation structures and matching G.I bolts, nuts and washers at Raghunathganj 132 KV Substation, WBSETCL
2025_SETCL_894716_1
CE(O and M)-I/Supply/SS Str/2025-26/11 Dated 26.08.2025
Open Tender
Suture and related products
120 days
WBSETCL, Vidyut Bhavan, Salt Lake, Kolkata
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹88,500
WBSETCL,Vidyut Bhavan, Salt Lake, Kolkata- 700091
20 Jan 2026
26 Aug 2025
24 Sept 2025
26 Aug 2025
22 Sept 2025
8 Sept 2025
26 Aug 2025 - 2 Sept 2025
3 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid