Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC NEAR BAZID BEG OFFICE 99 G FARIDAPUR CHAUDHARY IZZATNAGAR BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | L1 | Accepted-AOC Lowest 1st | |
| 2 | L2₹5.3 L+₹9,550 (1.84%)Rejected-AOC | L2 | Rejected-AOC Lowest 2nd |
Tender Value
₹5.5 L
EMD Value
₹5,500
Closing Date
12 Aug 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC PILIBHIT
Near Roadways Pilibhit
The installation of new 400 100 63 25 KVA distribution transformers and increasing capacity of over loaded distribution transformers from 10 KVA to 25 KVA at various places under EDD-Bisalpur in Business Plan 2024-25.
2024_MVVNL_921685_2
T-63/EDCP/2023-24
Open Tender
Miscellaneous Works
Item Rate
30 days
Bisalpur
As per tender form
3 documents required · 3 mandatory
₹1,180
SE EDC
₹5,500
14 Nov 2024
8 May 2024
12 Aug 2024
8 May 2024
12 Aug 2024
8 May 2024
Amount
Safe carriage of following materials from store centre-Pilibhit to various sites under EDD-Bisalpur including loading & unloading (sites/location detail enclosed as per annexure-10).
11/0.4 KV, 400 KVA T/F.
11/0.4 KV, 100 KVA T/F.
11/0.4 KV, 63 KVA T/F.
11/0.4 KV, 25 KVA T/F.
STP-11mtr/PCC Pole -8.5 mtr.
Other Balance estimated centrelized material, TF channel, top channel, Disk Insulator complete, pin insulator, Distribution Box, LT XLPE Cable, Stay set Complete, Earthing rod etc.
Erection of the double STP/PCC Pole including cutting, making holes, fixing of all types of accessories digging of pits complete in all respect, as per RESSPO drawing. All types of clamps, stone pad, nut, bolt washers would be provided by the contractor.
Erection of stay set with stay wire, stay clamp & stay insulator including with grouting of stay set by concrete of ratio 1:4:8 as per RESSPO norms before back fitting of the pits including binding, climbing, clamping, tightening and nozzeling of stay wire in all respect as per RESSPO norms. All clamps, nuts, bolts, stay insulator, cement. Brick, ballast, sand etc would be provided by the contractor.
Concreting of STP/PCC at the time of erection of pole in 1:4:8 concrete ratio from bottom of pole to ground level and plinthing of supports upto 300mm above ground level by using cement, sand & coarse aggregate in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing. All matrial would be provided by the contractor.
Earthing of STP/PCC of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15 Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor.
Construction of plinth for 400 KVA T/F of size 5 fit x5 fit x5 fit with the help of first class bricks, cement & coarse sand as per norms. Filling the structure completely by brick blast & plastering work of walls Including CC work on top in ratio 1:2:4 by cement, stone grit & sand and grouting of 2 nos. M.S. channel of size 50x50x5 mm on the top of T/Fs plinth whole work should be done as per RESSPO norms complete in all respect. (All Material will be provided by Contractor own his cost).
Mounting of following distribution transformers on newly constructed plinth/Double pole, laying of cable jumpering and making all HT/LT connections complete work in all respect.
11/0.4 KV, 400 KVA T/F.
11/0.4 KV, 100 KVA T/F.
11/0.4 KV, 63 KVA T/F.
11/0.4 KV, 25 KVA T/F.
Fabrication and grouting of wire mesh fencing of 28 fit running length in rectangular shape height 2 meter with M.S. angle of size 50x50x06 mm. including gate at one side as per norms complete work and painting of same with 2 coats of red oxide and 2 coats of synthetic enamale paint. (All Material will be provided by Contractor own his cost).
Earthing of T/Fs by boaring type up to water level by providing GI pipe and making connection from boaring site to body and neutral of T/F. (All Material will be provided by Contractor own his cost).
Earthing of 100 KVA , 63 KVA and 25 KVA Distribution transformers by inserting the MS earthing rod complete earthing work in all respect Earthing rod must be 0.15 Mtr. above from the plinth of the support. All type nut & bolt would be given by the contractor.
Laying of AB cable for suitable 25 KVA,63 KVA,100 KVA and 400 KVA Transformers
Fixing of LT Distribution Box 3 Phase
Fabrication and Installation of 11 KV fuse set on midway 11 KV double pole structure with mention material As- MS channel 100x50x2028 mm, Iron strip-50x5x305 mm, fuse wire and holding clamps etc. complete work in all respect all required materials provided by contractor on his own cost.
Safe carriage of received back 10 KVA T/F from site to Store Centre-Pilibhit after opening and dismantaling all connections and descend of 10 KVA T/F from PCC pole including loading, unloading at both ends and proper stacking at safe site under EDD-Bisalpur.
M/s Shivam Traders
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .