| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC | L1 | Accepted-AOC L1 Agreement Executed | |
| 2 | L2₹12.3 L+₹22,773.16 (1.89%)Rejected-AOC | L2 | Rejected-AOC L1 Agreement Executed | |
| 3 | L3₹12.4 L+₹35,765.77 (2.97%)Rejected-AOC | L3 | Rejected-AOC L1 Agreement Executed |
| Sl No | Description | Qty | Unit | ZUBAIR KA L3 | NASIR K A L2 | ABOOBACKER KALERI L1 |
|---|---|---|---|---|---|---|
| 1.00Detailed Estimate | ||||||
| 1.00 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 28 | each | 353.74 ₹9,904.72 | 350.2 ₹9,805.6 | 343.62 ₹9,621.36 Lowest |
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 274.23 | sqm | 70.71 ₹19,390.52 | 70 ₹19,195.82 | 68.69 ₹18,836.58 Lowest |
| 1.00 | 15.52:Dismantling of flushing cistern of all types (C.I. / PVC/ Vitrious China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead | 13 | each | 870.38 ₹11,314.94 | 861.68 ₹11,201.84 | 845.66 ₹10,993.58 Lowest |
| 1.00 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 2.53 | cum | 8,447.49 ₹21,389.04 | 8,363.02 ₹21,175.17 | 8,204.74 ₹20,774.4 Lowest |
| 1.00 | 22.5:Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. | 128.4 | sqm | 603.82 ₹77,528.07 | 597.78 ₹76,752.56 | 586.51 ₹75,305.54 Lowest |
| 1.01 | OD118781/2025-2026:Providing and fixing Vitrified wall tiles , of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer -in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. | 232.02 | sqm | 1,587.95 ₹3,68,436.16 | 1,572.07 ₹3,64,751.68 | 1,539.64 ₹3,57,227.27 Lowest |
| 1.01 | OD118870/2025-2026:Providing and laying Vitrified tiles in different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS : 15622, of approved brand & manufacturer,in all colours and shade, in skirting, riser of steps, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness,excluding grouting of joints (Payment for grouting of joints to be made separately).Size of Tile 600x600 mm | 50.64 | sqm | 1,637.88 ₹82,935.69 | 1,621.5 ₹82,106.27 Lowest | 1,902.93 ₹96,356.76 |
| 1.01 | 11.48.2:Grouting the joints of flooring tiles having joints of 3 mm width, using epoxy grout mix 0.70 kg of organic coated filler of desired shade (0.10 kg of hardener and 0.20 kg of resin per kg). including filling /grouting and finishing complete as per direction of Engineer-in-charge.Size of Tile 600x600 mm | 282.66 | sqm | 302.3 ₹85,446.91 | 299.28 ₹84,593.29 | 293.64 ₹82,999.11 Lowest |
| 1.01 | 9.48.1:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to steel windows by welding | 179.52 | kg | 211.53 ₹37,973.87 | 209.41 ₹37,593.28 | 205.48 ₹36,887.77 Lowest |
Tender Value
₹12.4 L
EMD Value
₹31,050
Closing Date
16 Oct 2025, 3:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer PWD Buildings Sub Division Taliparamba
DEPOSIT GAC Pariyaram Repair and Maintanance of Toilet Block Mens Hostel General Civil Work
2025_PWD_805972_1
D1/TN/07/2025 -26
Open Tender
Civil Works - Buildings
Item Rate
180 days
PARIYARAM
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹31,050
Yes
27 Oct 2025
6 Oct 2025
18 Oct 2025
6 Oct 2025
16 Oct 2025
6 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1342132.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .