| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.4 LAccepted-Finance | ₹78.4 L | L1 | Accepted-Finance Bid satisfies all tender qualification criteria. |
| 2 | L2₹97.5 L+₹19.1 L (24.3%)Accepted-Finance | ₹97.5 L+₹19.1 L (24.3%) | L2 | Accepted-Finance Bid satisfies all tender qualification criteria. |
| 3 | L3₹1.6 Cr+₹84.0 L (107.2%)Accepted-Finance | ₹1.6 Cr+₹84.0 L (107.2%) | L3 | Accepted-Finance Bid satisfies all tender qualification criteria. |
| 4 | Rejected-Technical 1 MARTIN BURN COMPOUND SATYA DOCTOR ROAD KHIDDERPORE KOLKATA WEST BENGAL 700023 | MURSHIDABAD | WEST BENGAL | 700023 | - | - | Rejected-Technical Non compliance of tender qualification criteria |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non compliance of tender qualification criteria |
Tender Value
Refer Docs
Closing Date
3 Jul 2024, 2:00 pmClosed
DGM (SRM)
P O PERUMANOOR COCHIN SHIPYARD ERNAKULAM KERALA
PIPELINE AND VALVE PACKAGE WITH REVISED SCOPE FOR THE VESSEL ICGS SAMUDRA PAHEREDAR AT CKSRU, KOLKATA
2024_CSL_194904_2
KP1/Pipeline and Valve package /ICGS Samudra Paheredar/CKSRU
Open Tender
Marine Services
Turn-key
70 days
CKSRU KOLKATA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
10 Oct 2024
21 Jun 2024
4 Jul 2024
21 Jun 2024
3 Jul 2024
21 Jun 2024
21 Jun 2024 - 29 Jun 2024
A) UNDER WATER VALVES
Following under water butterfly valves to be removed, overhauled, pressure tested, Painted and refitted back in position. EA 3051
Test pressure: a) Sl-1, 2, 3, 4, 5, 13, 14, 15, 18, 20 & 21 - 4.5 Bar; b) Sl-6, 7, 8, 9, 16 & 19 - 12 Bar; c) Sl-11, 12 - 3 Bar; d) Sl- 10, 17 – 9 Bar
Sl NO. Equipment/ system Description Size/mm
1 Sea trunk (MER & DGR) Low Sea Chest suction 300 DN
2 Sea trunk (MER & DGR) High Sea Chest suction 350 DN
3 Main Engine S/W PP Suction from Sea trunk 200 DN
4 DA Aux S/W PP Suction from Sea trunk 200 DN
5 Central cooler Overboard 150 DN
6 Fire &GS pump (Fwd/Aft) Suction from Sea trunk 150 DN
7 Bilge & Fire pump Suction from Sea trunk 125 DN
8 Ballast pump (Fwd/Aft) Suction 150 DN
9 Ballast pump (Fwd/Aft) Overboard 125 DN
10 Emergency fire pump Suction 125 DN
11 A/C SW pump Suction 150 DN
12 A/C SW pump Overboard 125 DN
13 RO plant Sea tube Suction 50 DN
14 HDG S/W Suction 65 DN
15 HDG Overhead 65 DN
16 Bilge Sys Overhead 125 DN
17 Emerg fire pump Suction & Overboard 25 DN
18 RO pump Overboard 150 DN
19 Eductor No. 1 to 6 Overboard 80 DN
20 WHR SW pump Suction & Overboard 80 DN
21 OBWS Overboard 65 DN
Renewal of valve spindle. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of valve lid. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of valve bridge block. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of rubber seat (Neoprene / Vulcanizing). Material contractor supply.
Following under water Stop valves/ Stop NRV valves of various systems to be removed, overhauled, pressure tested and refitted.
Test pressure- 4.0 bar
Equipment/ system Description Size/mm
Ref. SW pump suction 32 DN
Ref. SW pump Overboard 40 DN
OBW Separator Overboard 40 DN
RO plant Overboard 40 DN
Fi-Fi Pump Drain to OBD 50 DN
Fire &GS Pump Overboard 50 DN
Magazine flooding Suction 200 DN
Renewal of seat. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of valve bridge block. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of lid. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of valve spindle/stem. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Magazine direct flooding valve operating mechanism consist of rod and gear mechanism operated from foxle. Full set of rod and gear mechanism from foxle to Magazine compt. to be overhauled and system to be proved. *** All materials, consumables, fastners and spares are included in contractor's scope of work.
Following under water NR Flap valves to be removed, overhauled, pressure tested and refitted. Worn-out parts to be renewed.
Test pressure -4.0 bar
Location/ system Description Size/mm
WHR S/W pump Overboard 80 DN
HDG S/W pump Overboard 65 DN
Central Cooler Overboard 150 DN
A/C SW Sys Overboard 125 DN
Ballast Pump Disc Overboard 125 DN
Bilge Pump Disc Overboard 125 DN
Renewal of seat including. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of valve bridge block Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of lid. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Following sea trunk under water air blowing (Stop) and vent (Butterfly) valves to be removed, overhauled, pressure tested and proved in the system. Deteriorated parts to be renewed.
Test pressure-10.5 bar
Location/ system Description Size/mm
Sea trunk (DGR & MER) Sea Vent Butterfly 65DN
Emergency fire pump Sea Vent Butterfly 50DN
Fi-Fi sea Chest Sea Vent Butterfly 100DN
Ballast Pump Sea Vent Butterfly 80DN
Sea trunk (DGR & MER) Air Blowing (Stop NRV) 15DN
Sea trunk (DGR & MER) Air Blowing (Stop NRV) 15DN
Fi-Fi sea Chest Air Blowing (Stop NRV) 35DN
Fi-Fi sea Chest Air Blowing (Stop NRV) 35DN
Sea trunk (DGR & MER) Sea Vent Butterfly 25DN
Renewal of valve spindle/stem. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of valve lid. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of valve bridge block. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of rubber seat (Neoprine / Vulcanizing) including materials
Both Main Engine centralized cooler sea water outlet NRV (150 DN) flap holding spring & mechanism deteriorated and NRV malfunctioning. NRV to be overhauled and proved.
a) Underwater storm valve to be overhauled, and pressure tested. (4.0 BAR). Dia-80 mm
a) Underwater storm valve to be overhauled, and pressure tested. (4.0 BAR). Dia-65mm
Renewal of valve lid including materials -dia 80mm
Renewal of valve spindle/stem including materials -dia 80mm
Renewal of valve lid including materials -dia 65mm
Renewal of valve spindle/stem including materials -dia 65mm
FIXED LOCAL WATER MIST SYSTEM MAKE : TYCO ,TYPE: 913 SYSTEM(ASP)
(e) Chemically clean and pressure test of system pipe lines including galvanizing, dia: 40 mm
(f) Overhaul, pressure test and refit system valves, Size:40mm
(g) Calibrate system gauges /pressure switches.
HELIDECK FOAM SYSTEM MAKE : TYCO, TYPE : TYCO – HED – 04, CAPACITY : 300LTRS FOR 10 MIN, 2000 LTRS/ MIN
(a) Chemical cleaning & pressure testing of system pipe lines. Dia of pipe-65 m.
(b) Overhaul and pressure test of system valves . Valves types- Butterfly, size-65 mm, All damaged parts renewal under contractor's scope.
(c) Check that monitors are easy to move and that the locking equipment’s work properly. Lubricate the foe/ jet nozzle by applying some on the inside and move it to its end position. ** Spares CG Supply
RO PLANT
All three RO plant sea water system pipe lines to be removed, chemically cleaned and pressure tested and fitted back. Mat-CuNi, Test pressure-08 Bar.
a) Pipe 50NB
b) Pipe 25NB
FIRE MAIN SYSTEM PIPELINES & VALVES
Remove, overhaul, pressure test and refit all fire main system valves as indicated below:- ***Do only 50% of system valves. Specific valves will be finalized by SS while remove.
Test pressure – 12 bar. DESCRIPTION SIZE(mm)
Butterfly valve DN65
Butterfly valve DN125
Butterfly valve DN100
Butterfly valve DN50
Butterfly valve DN80
NR Flap DN65
NR Flap DN125
NR Flap DN50
Ball valve DN 25
Ball valve DN65
Ball valve DN 50
Stop valve DN 50
Renewal of seat. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of valve bridge block. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of lid. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of valve spindle/stem. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of rubber seat (Neoprine / Vulcanizing) including materials
Remove, overhaul, pressure test and refit all fire hydrant valves. Size: 50 mm. All leap seals to be renewed. All locking pins to be serviced for proper locking of hose male- end and same to be proved for zero leakage with live fireman pressure 9 kg/cm2.
Removal from line, Chemically clean, pressure test, Galvanize, paint and refits the following system pipe lines. Pipe to be refitted with new fasteners and gaskets (contractor supply).
(a)150mm Sch80 MS seamless pipes
(b)125mm Sch80 MS seamless pipes
(c)100mm Sch80 MS seamless pipes
(d) 50mm Sch80 MS seamless pipes
Remove and check condition of Orifice plates in the system. ** Orifice plates under contractor supply
Renew orifice plates including all accessories. (including material supply)
Fi-Fi AND DELUGE SYSTEM PIPELINES & VALVES
Remove and refit of Fi-Fi & Deluge system valves. ( PN25 )
Remote operated valve ND300
Butter fly valve ND50
Butter fly valve ND65
Butter fly valve ND100
Remove, overhaul, pressure test two by pass valve (100 mm) , type- butterfly valve.
Remove overhaul and pressure test overboard valve (size- 100 mm) ***Test pressure – 18 bar.
Remove, chemically clean, pressure test, Galvanize, painted and refit all Deluge system pipe lines. (Dia- 80 mm)
Renewal of Deluge system pipe lines (Dia- 80 mm) including materials.
Clean, and refit all sprinklers at Deluge system.
Renew defective sprinklers. ***Sprinklers under contractor scope.
S/W SYSTEM FOR M/E, DG (MAIN & HARBOUR), A/C&REF, RO PLANT & WHR) PIPELINES & VALVES
Remove, overhaul and refit the following system valves. ***Specific valves will be finalized jointly along with SS before removal.
Test pressure – 4.5 bar. SIZE Type
125 NB Butterfly valves
150 NB Butterfly valves
50 NB Butterfly valves
65 NB Butterfly valves
32 NB Ball valves
25 NB Ball valves
25 NB Regulation valve
65 NB Regulation valve
125 NB Regulation valve
150 NB Regulation valve
150 NB NR FLAP
125 NB NR FLAP
25 NB NR FLAP
65 NB NR FLAP
Chemically clean, pressure test, paint and refit all system pipe lines. Pipe dia-150 mm, mat-Copper. Test pressure – 06 bar.
Corrosion pieces (black steel pipe), Length 0.3 Mtr each, provided on outlet to heat exchangers of various sea water systems deteriorated / eaten away. To be renewed as per sample. **All pipes, flanges and fittings under contractor's scope of supply.
Description Dia Thickness Length
Corrosion piece 168.3 7.1 3mtrs
Corrosion piece 141.3 6.6 3mtrs
Corrosion piece 42.2 3.56 3mtrs
Corrosion piece 73 5.16 3mtrs
Neoprene rubber bellows of various sea water systems deteriorated. To be renewed as per sample. **All bellows and fittings under contractor supply.
Description Size (mm) Length
Rubber bellow DN150 20
Rubber bellow DN125 18
Rubber bellow DN65 14
Both fire/GS pump and Fire & Bilge pump purging cock (3 ways) defective. To be renewed as per sample (Size-1/8”, Mat: Brass) ** All purging cocks under contractor supply.
F/W COOLING SYSTEM 1, 2, 3 & 4 (M/E, G/BOX, SG, PLUMMER BLOCK, DG & BOW THRUSTER) PIPELINES & VALVES
Remove, overhaul, pressure test and refit of fresh water system valves. The details as follows:
Test pressure-4.5 Bar. Description Size (mm)
Butterfly valve DN50
Butterfly valve DN100
Butterfly valve DN150
Butterfly valve DN65
Flow regulation valve DN50
Flow regulation valve DN100
Flow regulation valve PT28
Flow regulation valve DN40
Ball valve DN10
Ball valve PT28
Ball valve PT8
NR Flap valve DN100
NR Flap valve DN40
Remote operated valve DN100
Remote operated valve3/2 way DN100
Stop valve DN100
Stop valve DN40
Stop valve PT28
Stop NR valve ND25
All machineries F/W system pipe lines to be removed, chemically cleaned, pressure test and refit all system pipe lines Re- lagging of system pipe lines including pipeline painting to be carried out. ** All Lagging Materials, Paints, fasteners etc., under contractor scope. **Test pressure-4.5 Bar.
(a) Pipe lines to be removed, chemically cleaned, pressure test ,refit, painting and relagging ( 125mm Dia)
(b) Pipe lines to be removed, chemically cleaned, pressure test ,refit, painting and relagging ( 105mm Dia)
(c) Pipe lines to be removed, chemically cleaned, pressure test ,refit, painting and relagging ( 65mm Dia)
(d) Pipe lines to be removed, chemically cleaned, pressure test ,refit, painting and relagging ( 40mm Dia)
(e) Pipe lines to be removed, chemically cleaned, pressure test ,refit, painting and relagging ( 32 mm Dia)
All 04 main DA hot water fiber cloth insulation lagging worn out and ruptured. To be renewed as per existing material with proper insulation pipe dia: 80 mm , lagging material inside and outer side covered with hot cloth. **All above Lagging material, hot cloth etc. for renewal of laggings under contractor scope.
HYDROPHORE SYSTEM (HOT/COLD), HP CLEANER & JET WATER CLEANING PIPELINES & VALVES
Remove, overhaul, pressure test and refit of Hydrophore (Hot &Cold) and jet water valves.
Test pressure- 6 bar . Size (mm) Description
50NB Butterfly valve
50 NB Pneumatic operated valve
15 NB Pneumatic operated valve
40 NB Stop NR valve
32 NB Stop NR valve
32 NB Stop NR valve
30 NB Stop NR valve
40 NB Stop valve
32 NB Stop valve
40 NB NR Flap
32NB Safety relief valve
25 NB SDSL valve
22NB Safety valve
28NB Safety valve
18NB Safety valve
All fresh water system pipelines to be removed, chemically cleaned, pressure tested, painted and refitted system pipe lines (Hydrophone/jet water). Re-lagging of hydrophore hot water & jet water system pipe line to be carried out on completion. Mat-Cu-Ni. *** All lagging material under contractor scope.
50NB Cu-Ni pipelines to be removed, chemically cleaned, pressure tested, painted,Re-lagging and refitted
40NB Cu-Ni pipelines to be removed, chemically cleaned, pressure tested, painted,Re-lagging and refitted
32NB Cu-Ni pipelines to be removed, chemically cleaned, pressure tested, painted,Re-lagging and refitted
25NB Cu-Ni pipelines to be removed, chemically cleaned, pressure tested, painted,Re-lagging and refitted
Hydrophore tank to be chemically cleaned and pressure tested.Cap-1000 ltrs. *** Test pressure-6kg/cm2 *** Chemical and Material under contractor scope.
All HP cleaner system pipe lines to be removed, chemically cleaned, pressure tested and refitted. Pipe dia-20 mm, mat- seamless steel, working pressure- 210 bar
BILGE & BALLAST, OWS SYSTEM PIPELINES & VALVES
Carry out chemical cleaning of bilge eductors and check for their performance.Length- 750 mm, Dia- 65mm, Capacity -40TPH each.
Remove, overhaul, pressure test, and refit system valves including Oily Bilge water Separator system. Details as follows: ***Do only 50% of system valves. Specific valves will be finalized by SS while remove.
Test pressure- 12 bar. Description
DN100 Pneumatic operated valve
DN20 Pneumatic operated valves
DN50 NR Globe valve
DN40 NR Globe valve
DN25 Ball valve
DN40 Ball valve
DN100 NR flap
DN 20 NR flap
DN125 Butterfly valve
DN100 Butter fly valve
DN50 Butterfly valve
DN50 SDNR valve
DN25 3-Way directional control valve
DN100 Safety valve
DN40 Safety valve
DN30 Pneumatic operated valve
Safety valve for OBWS
DN20 Pneumatic operated valve
DN30 three way directional valve
Remove, overhaul, pressure test, remote operated valves of bilge & ballast system including its operating mechanism. Details as follows: Test pressure- 12bar.
DN125 Butterfly valve
DN125 NR Flap valve
Chemically clean, pressure test, galvanize, paint and refit all system pipe lines. Material : seamless steel ASTM A106 Gr B, Dia – 80 MM,100 mm & 50 mm .
Chemical cleaning, pressure testing, Galvanizing and painting Dia 100mm seamless steel ASTM A106 Gr B pipe
Chemical cleaning, pressure testing, Galvanizing and painting Dia 80mm seamless steel ASTM A106 Gr B pipe
Chemical cleaning, pressure testing, Galvanizing and painting Dia 50mm seamless steel ASTM A106 Gr B pipe
Renewal of ASTM A106 Gr B seamless steel pipe, dia-100mm, materials contractor supply.
Renewal of ASTM A106 Gr B seamless steel pipe, dia-80mm, materials contractor supply.
Renewal of ASTM A106 Gr B seamless steel pipe, dia-50mm, materials contractor supply.
Remove and clean strainers fitted on the system. Size of strainers: dia- 80mm, Length-160 mm, Material SS
Renewal of SS strainers, if found damaged after opening. dia- 80mm, Length-160 mm, Material SS ** Strainers supply under contractor scope.
FUEL OIL, LUB OIL & HYDRAULIC OIL SYSTEM PIPELINES & VALVES
Remove, overhaul, pressure test and refit all below mentioned system valves. *** Test Pressure- 6 bar
Pneumatic operated Butter fly Valve 100 mm
Pneumatic operated Butter fly Valve 80 mm
Chemically clean, pressure test and refit all system pipe lines . Pipe dia- 50 mm, Dia-32 mm
Chemical cleaning, pressure testing and painting Pipe dia- 50 mm
Chemical cleaning, pressure testing and painting Pipe dia- 32 mm
Renewal of lube oil , hydraulic oil system pipe line dia- 50 mm, materials: SS 316, Sch 80
Renewal of lube oil , hydraulic oil system pipe line dia- 32 mm , materials: SS 316 ,Sch 80
Overhaul, pressure test and refit all QSD valves with mechanism in the fuel system.
Size:100 MM
Size:80 MM
Size-50 MM
Size-40 MM
Size-32MM
Check and Overhaul the wire operated mechanism, pulleys and condition of wire rope. Qty-01, Size- 40 mm
AIR SYSTEM AND AIR BOTTLES PIPELINES & VALVES
The following HP air bottles are to be checked internally, pressure tested and painted after inspection. ***Paint contractor supply
a) Capacity: 500 Ltrs each
b) Capacity: 1000 Ltr
c) Instrument buffer Tank: 60 Ltrs
d) pneumatic control air reservoir Capacity: 80 Ltrs
e) starting air receiver for emergency gen set Capacity: 125Ltrs
Overhaul & pressure test 100% air valves in starting air system including isolating valves. ***Test pressure- 45bar.
Type : Globe V/V Dia : 35 MM
Type- ball Valve Size-35 mm.
Renewal of Spindle (ball & globe valve)
Renewal of seat (ball & globe valve)
Renewal of lid (ball & globe valve)
Renewal of bridge blcok (ball & globe valve)
Overhaul & pressure test following service air valves in the system.
Test pressure- 12 bar. Description Size
Ball valve 35mm
Non return valve 35mm
Stop valve 35mm
Stop valve 15mm
Relief valve 15mm
Stop valve 12 mm
Non return valve 12mm
Ball valve 12 mm
Ball valve 15 mm
Ball valve 28 mm
Solenoid valve (drain) 28mm
Non return valve 25 mm
Non return valve 22 mm
Ball valve 22 mm
Ball valve 12mm
Relief valve 15mm
Relief valve 15mm
Ball valve 42mm
Ball valve 8 mm
Non return valve 15 mm
Ball valve 10mm
Stop valve 8 mm
Overhaul air reducer with drier in the system and renew defective parts. All spares/materials under contractor supply
Air reducer ( 30-10 bar)
Air reducer ( 30-7 bar)
Air drier
Control and instrumentation air system lines {LP (including service air & interring stabilizer lines) and HP air system pipe line} to be removed, chemically cleaned, painted and pressure tested.(Dia-15mm, test pressure- 12 bar)
Renewal of LP & HP air system pipe lines, dia 15mm, test pressure- 12 bar
Overhaul safety valves in air bottles, relief valve and drier/moisture absorber in the system Calibration to be carried out by NABL certified Lab only *all materials contractor supply.
Safety valve Dia :32 MM
Drier
Relief Valves Dia. :32 MM
Moisture absorber
STEAM & CONDENSATE SYSTEM
Remove, overhaul, pressure test and refit valves as indicated. Test pressure - 6Bar
Stop valve 25 mm
Stop valve 50 mm
Stop valve 20 mm
Stop valve 40 mm
Stop valve 65 mm
Stop valve 32 mm
Stop valve 15 mm
NRV 50mm
Renewal of seat. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of valve bridge block. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of lid. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
Renewal of valve spindle/stem. Material: MS/ SS/ Cu-Ni/ Bronze (whichever applicale). Material contractor supply.
All system pipe lines to be chemically cleaned, pressure test, galvanized and refitted including steam coils in the ORO tanks. Pipe dia: 20MM,
Renewal of insulation and SS cladding of pipeline, dia-20mm
Renewal of steam pipe line, dia :20mm
Overhaul & Check safety valves and relief valves in the system. Dia-20mm, all materials contractor supply.
Overhaul back pressure regulator. all materials contractor supply.
Overhaul steam trap and De-aeration unit in the system. all materials contractor supply.
Chemically clean and pressure test Hot well/Feed water tank. all materials contractor supply.
EQUIPMENT/SYSTEM :AVCAT SYSTEM , MAKE : ABG
Carry out system pipe line cleaning including renewal of gasket , pressure test ,painted and inspection of filters. Details as follows: Dia- 65 mm, Dia- 50 mm, Gasket material – Teflon Material contractor supply.
Dia 65mm Pipeline above scope
Dia 50mm Pipeline above scope
Renewal of 65mm Dia Pipeline ( inlcuding pipe & its fittings)
Renewal of 50mm Dia Pipeline ( inlcuding pipe & its fittings)
Carry pressure test of hoses for leakages. Dia: 50 mm, Pressure test at 1.5 times of working pressure. ****Test Pressure- 6bar.
Carry out cleaning/inspection of all tanks and eductor. Storage tank Capacity- 20.1 KL and Service tank capacity 5.0 KL, Eductor-01
a) Storage tank Capacity- 20.1 KL
b) Service tank capacity 5.0 KL
c) Eductor
Island Ship Repairers
KOLKATA ENGINEERING
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .