Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1 bidder₹65.1 LAccepted-Finance | L1 bidder | Accepted-Finance L1 bidder | |
| 2 | L2 bidder₹65.2 L+₹17,252.55 (0.27%)Accepted-Finance | L2 bidder | Accepted-Finance L2 bidder | |
| 3 | L3 bidder₹65.7 L+₹61,032.46 (0.94%)Rejected-Finance | L3 bidder | Rejected-Finance L3 bidder | |
| 4 | Rejected-Technical 20 1 2024 | - | Rejected-Technical L10 bidder | |
| 5 | Rejected-Technical | - | Rejected-Technical L5 bidder |
| Sl No | Description | Qty | Unit | Jinson.k.Joseph L5 | TC THANKACHAN L1 | ABDUL GAFOOR L10 | MOIDU KC L9 | VINCENT V J L7 | VISHNU BABU L3 | WAYANAD GOODS CARRIAGE OWNERS AND LABOUR CONTRACTT CO-OP SOCIETY LD NO W351 L8 | TTS CONSTRUCTIONS PVT LTD L6 | PROMISE CREST DEVELOPERS PVT. LTD L2 | NAWAS P M A L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Main Building | |||||||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 143.5 | cum | 284.24 ₹40,788.44 | 271 ₹38,888.5 | 329.1 ₹47,225.85 | 309.89 ₹44,469.22 | 290.42 ₹41,675.27 | 270 ₹38,745 Lowest | 303.84 ₹43,601.04 | 289.74 ₹41,577.69 | 271.9 ₹39,017.65 | 279.7 ₹40,136.95 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 35.88 | cum | 103.52 ₹3,713.78 | 98.68 ₹3,540.15 Lowest | 119.8 ₹4,297.83 | 112.86 ₹4,048.85 | 105.77 ₹3,794.5 | 100 ₹3,587.5 | 110.66 ₹3,969.93 | 105.52 ₹3,785.53 | 99.04 ₹3,553.06 | 101.87 ₹3,654.59 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 153.49 | cum | 251.64 ₹38,623.22 | 240 ₹36,836.64 Lowest | 291.3 ₹44,710.47 | 274.35 ₹42,108.88 | 257.11 ₹39,462.79 | 240 ₹36,836.64 Lowest | 269 ₹41,287.73 | 256.51 ₹39,370.69 | 240.76 ₹36,953.29 | 247.63 ₹38,007.74 |
| 1.00 | OD54418/2026-2027:Dry rubble masonry with hard stone in foundation and plinth up to plinth level including cost of all material labour charges etc. | 27.2 | cum | 3,155.47 ₹85,828.78 | 3,011 ₹81,899.2 Lowest | 3,653.1 ₹99,364.32 | 3,440.23 ₹93,574.26 | 3,224.05 ₹87,694.16 | 3,020 ₹82,144 | 3,373.14 ₹91,749.41 | 3,216.59 ₹87,491.25 | 3,019 ₹82,116.8 | 3,105.16 ₹84,460.35 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 19.86 | cum | 6,268.25 ₹1,24,481.18 | 5,979 ₹1,18,736.96 Lowest | 7,256.7 ₹1,44,110.81 | 6,833.92 ₹1,35,714.82 | 6,404.49 ₹1,27,186.77 | 6,000 ₹1,19,154 | 6,700.65 ₹1,33,068.21 | 6,389.67 ₹1,26,892.46 | 5,997 ₹1,19,094.42 | 6,168.3 ₹1,22,496.27 |
| 1.01 | OD54416/2026-2027:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess cement content as per mix design is not payable & less usage of cement is recoverable.
All work upto plinth level | 52.35 | cum | 8,674.64 ₹4,54,108.73 | 8,274.5 ₹4,33,161.8 Lowest | 10,042.5 ₹5,25,714.83 | 9,457.46 ₹4,95,088.57 | 8,863.17 ₹4,63,978.09 | 8,350 ₹4,37,114.15 | 9,273.03 ₹4,85,433.85 | 8,842.67 ₹4,62,904.93 | 8,299 ₹4,34,444.35 | 8,536.31 ₹4,46,867.29 |
| 1.01 | OD54414/2026-2027:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.. All work above plinth level up to floor V level | 56.62 | cum | 10,212.07 ₹5,78,227.83 | 9,741 ₹5,51,554.9 Lowest | 11,822.4 ₹6,69,407.93 | 11,133.64 ₹6,30,408.96 | 10,434.02 ₹5,90,795.08 | 9,850 ₹5,57,726.7 | 10,916.52 ₹6,18,115.2 | 10,409.89 ₹5,89,428.79 | 9,770 ₹5,53,196.94 | 10,049.23 ₹5,69,007.5 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 10,690.8 | kilogram | 88.83 ₹9,49,663.76 | 84.8 ₹9,06,579.84 Lowest | 102.8 ₹10,99,014.24 | 96.85 ₹10,35,403.98 | 90.76 ₹9,70,297.01 | 87.5 ₹9,35,445 | 94.96 ₹10,15,198.37 | 90.55 ₹9,68,051.94 | 84.99 ₹9,08,611.09 | 87.42 ₹9,34,589.74 |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 10,887.5 | kg | 88.83 ₹9,67,137.07 | 84.8 ₹9,23,260.42 Lowest | 102.8 ₹11,19,235.51 | 96.85 ₹10,54,454.86 | 90.76 ₹9,88,149.95 | 87.5 ₹9,52,656.69 | 94.96 ₹10,33,877.47 | 90.55 ₹9,85,863.58 | 84.99 ₹9,25,329.05 | 87.42 ₹9,51,785.69 |
Tender Value
₹80.6 L
EMD Value
₹50,000
Closing Date
5 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive engineer
Executive Engineer PWD Buildings Division kalpetta wayanad.
GENERAL-Education Department Annual Plan 2025-26 Construction of School building for Govt Higher Secondary School Koleri Wayanad -Construction of new building- General Civil Work
2026_PWD_874675_1
PWD/BLDG/7660/2026-2027
Open Tender
Civil Works - Buildings
Item Rate
540 days
Koleri
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
31 Oct 2026
29 Sept 2026
7 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Main Building | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 143.5 | cum | - | - |
| 1.002 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 35.88 | cum | - | - |
| 1.003 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 153.49 | cum | - | - |
| 1.004 | OD54418/2026-2027:Dry rubble masonry with hard stone in foundation and plinth up to plinth level including cost of all material labour charges etc. | 27.2 | cum | - | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 19.86 | cum | - | - |
| 1.006 | OD54416/2026-2027:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess cement content as per mix design is not payable & less usage of cement is recoverable.
All work upto plinth level | 52.35 | cum | - | - |
| 1.007 | OD54414/2026-2027:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.. All work above plinth level up to floor V level | 56.62 | cum | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 10,690.8 | kilogram | - | - |
| 1.009 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 10,887.51 | kg | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
finance_1484539.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 6.78 MB
BOQ_1484539.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .