Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance BIMAL SINHA SARANI HAKIMPARA SILIGURI SILIGURI HAKIMPARA DARJEELING WEST BENGAL 734001 | JALPAIGURI | WEST BENGAL | 734001 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.1 L
Closing Date
7 Mar 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE(AF) Tezpur
GE(AF) Tezpur Airforce station Tezpur Tezpur 784104
Soil investigation for earth filling and provision of retention wall at DM Range at AF Station Tezpur
2023_MES_581968_1
3020/WO/AF/01/E3
Open Tender
Job Works
Works
30 days
GE(AF) Tezpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
10 Mar 2023
21 Feb 2023
10 Mar 2023
21 Feb 2023
7 Mar 2023
23 Feb 2023
22 Feb 2023 - 22 Feb 2023
Amount
Soil Investigation 1) DETERMINATION OF SAFE BEARING CAPACITY BY SPL METHOD AS DESCRIBED BELOW:- (a) Drilling 50 to 100 mm diameter boreholes from 0 to 6 mtr depth according to IS 1892-1983 with 01 No of Trail pit of size 1.2m x 1.2m with a distance of 5.00m away from BH (Both centally placed) for each bore hole for RCC Retaining wall 5m to 6 mtr height neat natural nalla at DM range (b) Conducting standard penetration test (SPT) as per IS 2131-1988. The testing shall be made at every change in strata at the intervals of not more than 0.50 mtr whichever is less. The test may be made at lesser intervals if specified or considered necessary as per para 3.3.1 of IS-2131-1988. (c) Collection of disturbed soil samples at an interval of 0.50mtr or change in strata. (d) Collection of undisturbed soil samples at an interval of 0.50mtr or change strata. (e) Conducting laboratory tests on disturbed/undisturbed soil samples as per project requirement after completion of boring as given below:- (i) Sieve analysis (ii) Plasticity index (iii) Specific gravity (iv) Water Content (v) Particle size analysis (vi) Bulk and dry density (vii) Atterberg limit (viii) Harmful salt or organic matter if any. (ix) Direct shear test (if in case of sandy soil) (x) Unconfined un-drained test (In case of clayer soil) (xi) Consolidation test (for saturated soil) (xii) 'C' Values (xiii) Differential swell test in case of expansive soil (xiv) Unconfined compressive strenght of rock (In case of rocky strata) (xv) Determination of tensile/shear strength of rock(in case of rocky strata) quality index for rocky strata in case of rocky strata). In case rock is encountered, the boring shall continue upto 1.50 to 2.00 mtr in rock. Recommended SBC should be given for all bore holes, minimum at three depths viz 2.0m, 2.50m, 3m. Soil investigation report shall be submitted covering the following notres:- Notes 1 :- (a) Bore log chart showing depth of soil strata (b) Sub soil water table (c) Porable maximum and different settlement (d) Safe bearing capacity based on shear and settlement criteria (e) Recommendation for type and depth of buildings (f) Site plan building wise RL of buildings (g) Bearing capacity and depth of Fdn wrt FFL/Fixed Bench Mark (h) SBC should be worked out for the circular/angular raft of overhead tank and the modulus of soil subgrade reaction. (j) Plate load test in addition to normal field and lab tests on UDS/DS samples. Notes 2 :- (a) The location of bldg/bores shall be given by GE (b) The soil report shall be in 3 parts (i) Field Operations (ii) Lab testing and sub soil properties (iii) Fdn consideration and recommendation for isolated footing, combined, angular raft, circular raft & foundation & pile foundation (c) The report shall be submitted in quintuplicate to this office. Notes 3 :- The report should be the following:- (a) Soft copy (CD) containing folder-wise soil investigation activity for each bore should be included. (b) Each report should include signatures and name of the JE, Engr-in-Charge and GE on the recommendation page. (c) Recommendation for filling under floors.
PRADIP DUTTA
Pioneer Computers
Kristi Engineering Services Private Limited
stage.html
html • 0.02 MB
finance_651951.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .