Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
Closing Date
6 Oct 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer REW Ganderbal
Executive Engineer REW Ganderbal
Construction of Footpath with Rwall along sides from link road to H/O Sarfaraz Ahmed BijandHalqa Thune A, Block Kangan.
2021_RDPR_139147_2
e-nit no 66/2022-21
Open Tender
Civil Works
Item Rate
30 days
RD and PR Ganderbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
Executive Engineer REW Ganderbal
Exempted
7 Oct 2021
13 Sept 2021
7 Oct 2021
13 Sept 2021
6 Oct 2021
13 Sept 2021
120 days
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
Supply and laying of stone soling (hand packed ) in trenches of foundation including consolidation watering and ramming and all consequential and incidental costs like all leads,lifts,carriages but excluding head load by manual labour or by ponnies.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) with 20% plum icluding all carriages
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand)
photographs/signboard
FAROOQ AHMAD KASSANA
RAFIQ AHMAD BIJRAN
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .