| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹38.4 LAccepted-AOC | l1 | Accepted-AOC L1 |
Tender Value
₹39.4 L
EMD Value
₹50,000
Closing Date
29 Oct 2024, 4:00 pmClosed
Executive Engineer
Office of the Executive Engineer PWD Buildings Division Alappuzha
GENERAL-Strengthening and Upgradation of Pharmacy Institution in Government Medical College Alappuzha - Construction of 2nd floor of new Pharmacy Block-Structural-General Civil Work
2024_PWD_693752_2
PWD/BLDG/6858/2024-2025
Open Tender
Civil Works - Buildings
Item Rate
365 days
Alappuzha
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹50,000
16 Jan 2025
21 Oct 2024
1 Nov 2024
21 Oct 2024
29 Oct 2024
21 Oct 2024
Amount
Appendix -A - First Floor
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet
15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
OD107496/2024-2025:Providing ang laying in position machine batched and machine mixed design mix M30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix ,including pumping of concrete to site of laying but excluding the cost of centering, shuttering finishing and reinforcement ,including admixtures in recommended proportions as per IS;9103 to accelerate ,retard setting of concrete ,improve workability without impairing strength and durability as per direction of Engineer-in -charge. Detailed design mix to be supplemented. Minimum cement content to be adopted is 340kg/m3. (The excess/less cost of cement as per mix design is not payable/recoverable) All work above plinth level up to floor V level Details of cost for 1.00m3
50.6.2.3:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Bidder Name
ABUL HASSAN S
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1089988.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .