Executive Engineer(C), Procurement Cell, Gujarat Maritime Board, Gandhinagar.
Providing Pacca Stacking Platform from Chainage 0 to 80m and 230 to 320m at Port Okha
355198
19 of 2026-27
Open
Civil Works
Works
Gandhinagar
6 documents required · 5 mandatory · 1 optional
₹14,160
Gujarat Maritime Board
₹6.3 L
15 Oct 2026
15 Oct 2026
15 Oct 2026
13 Nov 2026
15 Oct 2026
8 Section -7 Bill of Quantities
9 Section -8 Securities and Other Forms
10 Section -9 Drawings
11 Section -10 Documents to be furnished by Bidder
INVITATION FOR BID
NATIONAL COMPETITIVE BIDDING
1. The Gujarat Maritime Board invites bids for the construction of works detailed in the
table. The bidders may submit bids for any or all of the following works.
Name of Approximate Bid Cost of Period of #Class of
work value of security document completi Registration
works (Rs.) (Rs.) (Rs.) on / Category of
Providing 6,34,000/- 14,160/- 8 (Eight) A Class &
Pacca 5,36,55,438.11 months
Stacking (inclusive of (inclusive of Above
Platform 18% GST) 18% GST)
2. Prospective / Interested bidder may download the Bid Documents from website
https://www.nprocure.com free of cost till the Time and Date as mentioned on
online NIT at website https://www.nprocure.com.
3. However, Bidder who is submitting the Bid Online will have to pay the Bid
Document Fee/ Tender Fee through Demand Draft only of any
Schedule Bank payable at Gandhinagar and in favour of ‘Executive Engineer,
Guajarat Maritime Board, Gandhinagar. Once the Bid is received online, Bid
Document / Tender Fee will not be refundable.
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee
against Bid Security / EMD shall be submitted in electronic format through online
(by scanning) while uploading the bid, this submission shall mean that bid
document / tender fee and Bid Security / EMD has been received. Accordingly, the
offer of only those shall be opened whose Bid Document / Tender Fee and Bid
Security / EMD have been received electronically. However, for the purpose of
realization of Demand Draft, and FDR / Bank Guarantee bidder shall send the
same in original through R.P.A.D. so as to reach to Executive Engineer(C), R & B
Division, Procurement Cell, Gujarat Maritime Board, Sagar Bhawan, Opp. Air Force,
Sector 10 A, Gandhinagar- 382010 within 7 Days from the last day of bid
Penaltative action for not submitting Demand Draft / FDR / Bank Guarantee
in original to Executive Engineer / Tender Inviting Authority by bidder shall be
initiated.Bids received online, will be opened on the time, date and place as
specified in the online NIT at website https://www.nprocure.com in the presence
of the bidders or their authorized representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified,
the bids will be opened on the next working day at the same time and venue.
4. A pre bid meeting will be held on ………………………………at ………………………..hrs.
at the office of ..................................... to clarify the issues and to answer questions on
any Matter that ................................... may be raised at that stage as stated in clause
9.2 of ‘instructions to Bidders’ of the bidding documents.
5. #Bid Security (EMD) is equal to 1% of Estimated Amount put to bid / tender and
shouldbe rounded off to the next thousand rupees.
6. Other Information is as under:
A. Agencies can prepare and edit their offers a number of times before the end of
the tender submission date and time. After the tender submission date and
time, the bidder cannot modify / edit / withdraw their submitted offer in any
case. No written or online request in this regard shall be granted.
B. Offers in physical form will not be accepted in any case.
C. Demand Draft purchased by the other then bidder and issued after the last
date of submission of Bids, will not be considered or accepted.
D. The cost incurred by the contractor for this offer for clarification or attending
discussion, conferences or site visits will not be reimbursed by the Employer
or Engineer-in-Charge.
E. Conditional tender shall not be accepted.
F. Any changes, addition, alternation made in the prescribed form attached with
tender are liable to be rejected.
G. Any change in format or conditional Bank Guarantee will not be accepted and
the bidder will be considered non-responsive.
H. All the bidders are instructed to fill in information strictly in accordance with
the format given in the checklist /qualification document / tender document.
I. It is mandatory for the bidders to supply each and every information as asked
strictly in electronic format at appropriate places only.
J. Blank / insufficient information shall be treated as nil information and shall
result in disqualification.
K. Even if the bidder has been qualified in a similar or larger size of project in
the past, it shall not be deemed to be a ground / reason for not giving required
information for this work / bid.
L. Information supplied for earlier projects shall not be considered while
evaluation of this bid. The Government will not ask for any other information,
unless it is found absolutely necessary by the competent authority.
M. If found necessary, the contractor will be intimated for negotiation,
# For the works costing up to 7.5 crore BUILDING (ROAD), 7.0 crore
(BUILDING & BRIDGE) kindly refer to SSR-10-2015-17-C dated 03-02-2017
For the works costing under 7.5 crore for Building (Road) Works and 7.0 crore
for Building and Bridge Works following documents shall be submitted in
electronic format only through online by scanning and the (i) Bid Document Fee /
Tender Fee (ii) Bid Security / EMD should be sent in original to the Tender
opening authority through RPAD, so as to reach the Executive Engineer within
days from last day of submission of Bid.
The following minimum qualification documents must be submitted by the
bidder in their online submitted bids failing which their bid will be treated
as non-responsive
(i) Bid Document Fee / Tender Fee
(ii) Bid Security / EMD
(iii) Registration Certificate of Class-A and Above of Government of Gujarat
(iv) GST Number
(v) Similar Work Experience: At least one successfully completed similar work
amounting to 40% of the amount put to tender, i.e. Rs. = 5,36,55,438.12 × 40% =
Rs.2,14,62,175.25/-. “Similar work” shall mean any pavement work involving M55
grade, 120 mm thick concrete paver blocks.
INSTRUCTIONS TO BIDDERS
Section 1: Instructions to Bidders
Table of Clauses
Page No. Page No.
A. General D. Submission of Bids
1. Scope of Bid 9 19. Sealing & Marking of Bids
2. Source of Funds 9 20. Deadline for Submission of
3. Eligible Bidders 9 21. Late Bids
4. Qualification of the 9 22. Modification and
Bidder Withdrawal of Bids
5. One Bid per Bidder
6. Cost of Bidding 13 E. Bid Opening and Evaluation
7. Site Visit 13 23. Bid Opening
B. Bidding Documents 25. Clarification of Financial
8. Content of Bidding 14 26. Examination of Bids and
Documents Determination of
9. Clarification of Bidding 14 27. Correction of Errors
10. Amendment of Bidding 15 28. Deleted
29. Evaluation and Comparison
of Financial Bids
C. Preparation of Bids 30. Deleted
11. Language of Bid
12. Documents Comprising 16 F. Award of Contract
13. Bid Prices 16 31. Award Criteria
14. Currencies of Bid and 17 32. Employer’s Right to Accept
Payment any Bid and to Reject any
15. Bid Validity 17 33. Notification of Award and
Signing of Agreement
16. Bid Security 17 34. Performance Security
17. Alternative Proposals By 18 35. Advance Payment and
Bidders Security
18. Format and Signing of Bid 18 36. Dispute Review Expert
37. Correct or Fraudulent
1. Scope of Bid
1.1 The Employer (Named in Appendix to ITB) invites bids for the Construction of works
(as defined in these documents and referred to as ‘the works”) detailed in the table
given in IFB. The bidders may submit bids for any or all of the works detailed in the
table given in IFB.
1.2 The successful bidder will be expected to complete the works by the intended
completion date specified in the Contract data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their
derivatives (bidder/ tenderer, bid / tender, bidding/ tendering, etc.) are
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Gujarat Maritime
Board. Govt. of Gujarat / Govt. of India for centrally sponsored projects.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
statement that the Bidder is neither associated, nor has been associated, directly or
indirectly, with the consultant or any other entity that has prepared the design,
specifications, and other documents for the Project or being proposed as Project
Manager for the Contract. A firm that has been engaged by the Employer to provide
consulting services for the preparation or supervision of the works, and any of its
affiliates, shall not be eligible to bid.
4. Qualification of the Bidder
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
preliminary description of the proposed work method and schedule, including
drawings and charts, as necessary. The proposed methodology should include a
program of construction backed with equipment planning and deployment duly
supported with broad calculations and quality assurance procedures proposed to be
adopted justifying their capability of execution and completion of work as per
technical specifications, within stipulated period of completion.
#4.5 QUALIFICATION CRITERIA:
(Applicable for the works which require Post Qualification)
4.5.1 Qualification will be based on Applicant’s meeting all the following minimum pass/
fail criteria regarding the Applicant’s general and particular experience, personnel
and equipment capabilities and financial positions, as demonstrated by the
applicant’s responses in the forms attached to the letter of application ( specified
requirement for joint ventures are given under para 4.6 below ) Subcontractors
experience and resources shall not be taken in to account in determining the
applicants compliance with the qualifying criteria
To qualify for more than one contract, the applicant must demonstrate having
experience and resources sufficient to meet the aggregate of the qualification criteria
for each contract given in paragraphs 4.5.4, 4.5.5 and 4.5.9 below
4.5.2 Base year and Escalation
The base year shall be taken as Current financial year
Following enhancement factors will be used for the costs of works executed and the
financial figure to a common base value for works completed in India.
Year Financial Year Multiplying factor
Base year of inviting tender 2026-2027
Applicant should indicate actual figures of costs and amount for the works
executed by them without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in foreign
currency the above enhanced multiplying factors will not be applied. Instead, the
current market exchange rate (State Bank of India BC Selling rate as on the last date
of submission of the bid) will be applied for the purpose of conversion of the amount
in foreign currency into India rupees.
4.5.3. General Experience.
The Applicant shall meet with the following minimum criteria:
(a) Achieved a minimum annual financial turnover (defined as billing for works in
progress and completed in all classes of civil engineering construction works
only) in any one year, over the last five years (2020-21 to 2024-25) of the
annual value of contract / contracts applied for.
(b) Experience in successfully completing of substantially completing at least one
contract of civil engineering construction works of at least 40 percent of the
value of proposed contract within the last five years (2020-21 to 2024-25).
Experience in successfully completing or substantially completing at least one
contract of highway (road and / or bridge works) airport runway of at least
percent of the value of proposed contract within the last five years.
The works may have been executed by the applicant as prime contractor or as a
member of a joint venture or as a nominated sub-contractor. As subcontractor,
he should have acquired the experience of execution of all major items of works
under the proposed contract. In case a project has been executed by a joint
venture, weight towards experience of the project would be given to each joint
venture in proportion to their financial participation in the joint venture.
Substantially completed works means those works which are at least 90 %
completed as on the date of submission (i.e. gross value of work done up to the
last date of submission is 90 % or more of the original contract price) and
continuing satisfactorily.
For these, a certificate from the employers shall be submitted along with the
application incorporating clearly the name of the work, contract value, billing
amount, date of commencement of works, satisfactory performance of the
contractor and any other relevant information.
4.5.4. Personnel Capabilities.
Availability for his work of personnel with adequate experience as required; as per
4.5.5. Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggested major
equipment to attain the completion of works in accordance with the prescribed
construction schedule are shown in the Appendix.
The bidders should, however, undertake their own studies and furnish with
their bid, a detailed construction planning and methodology supported with layout
and necessary drawings and calculations to allow the employer to review their
proposals. The numbers, types and capacities of each plant/equipment shall be
shown in the proposals along with the cycle time for each operation for the given
production capacity to match the requirements.
4.5.6. Financial Position
The Applicant should give undertaking that he has access to, or has available, liquid
assets (aggregate of working capital, cash in hand and uncommitted bank
guarantees) and / or credit facilities up to 25 percent of the value of the contract /
contracts applied.
The audited balance sheets for the last five years should be submitted, which must
demonstrate the soundness of the applicant’s financial position, showing long – term
profitability including an estimated financial projection for the next two years, If
necessary, the employer will make inquiries with the applicant’s bankers.
4.5.7. Litigation History
The Applicant should provide accurate information on any litigation or arbitration
resulting from contracts completed or under execution by him over the last five
years. A consistent history of awards against the Applicant or any partner of a joint
venture may result in failure of the applicant.
4.5.8. Disqualification
Even though the applicants meet the above criteria, they are subject to be
disqualified if they have:
Made misleading or false representation in the forms, statements submitted, and / or
Record of poor performance such as abandoning the work, rescinding of contract for
which the reasons are attributable to the non – performance of the contractor;
consistent history of litigation awarded against the applicant or financial failure due
to bankruptcy. The rescinding of contract of a joint venture on account of reasons
other than non – performance, such as Most Experienced partner of joint venture
pulling out, court directions leading to breaking up of a joint venture before the start
of work, which are not attributable to the poor performance of the contractor will,
however, not affect the qualification of the individual partners.
#4.6 JOINT VENTURE: (Maximum 3 Members i.e. 1 Lead & 2 others)
(Applicable only for estimated project cost of 50 Crore and above)
4.6.1. Joint ventures must comply with the following requirement:
(a) Following are the minimum qualification requirements:
(i) The lead partner shall meet not less than 50 percent of all criteria given in para 4.5.3. &
4.5.6 above. The joint venture must collectively satisfy the criteria of para 4.5.3
& 4.5.6 above. The experience of the other joint venture partners shall be
considered if it is not less than 30 percent of the qualifying criteria in para 4.5.3
(ii) Individually each member must satisfy the requirements of para 4.5.7 & 4.5.8
(b) Bid shall be signed so as to legally bind all partners, jointly and severally, and shall
be submitted with a copy of the joint venture agreement providing the joint and
several liabilities with respect to the contract.
4.6.2. Qualification of a joint venture does not necessarily qualify any of its partners
individually or as a partner in any other joint venture. In case dissolution of a joint
venture, each one of the constituent firms may qualify if they meet all the
qualification requirements, subject to the written approval of the Employer.
4.7. Bid Capacity.
Applicants who meet the minimum qualification criteria will be qualified only if their
available bid capacity at the expected time of bidding is more than the total
estimated cost of the works. The available bid capacity will be calculated as under:
Assessed Available Bid Capacity = (A*N*2-B), where
A = Maximum value of work executed in any one year during the last five years
(updated to the price level of the year indicated in appendix) taking into
account the completed as well as works in Progress.
B = Value at current price level of the existing commitments and ongoing works to
be completed during the next 4 Months (period of completion of work for
which bids are invited); and
N = Number of years prescribed for completion of the works for which the bids are
invited. (I.e. 4 Months)
Note: - In Case of joint venture, the available bid capacity will be applied for
each partner to the extent of his proposed participation in the
execution of the work.
4.8 Even though the bidders meet the above qualifying criteria, they are subject to
be disqualified if they have:
- Made misleading or false representation in the forms, statements and
Attachments the submitted in proof the qualification requirements; and / or
- Record of poor performance such as abandoning the works, not properly
completing the contract, inordinate delay in completion, litigation history, or
financial failures etc.; and/ or
- Participated in the previous bidding for the same work and had quoted
unreasonably high bid prices and could not furnish rational justification to the
5. One bid per bidder
5.1. Each bidder shall submit only one bid for one package. A bidder who submits or
participates in more than one bid (other than as a subcontractor or in cases of
alternatives that have been permitted or requested) will cause all the proposals with
the bidder’s participation to be disqualified.
6. Cost of Bidding
6.1. The bidder shall bear all costs associated with the preparation and submission of his
Bid, and the Employer will in no case be responsible and liable for those costs.
7.1. The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and
examine the Site of work and its surrounding and obtain all information that may be
necessary for preparing the Bid and entering into a contract for construction of the
The costs of visiting the site shall be at the Bidder’s own expense.
B. BIDDING DOCUMENTS
8. Content of Bidding Documents
8.1 The set of bidding documents comprises the documents listed below and addenda
issued in accordance with Clause 10:
Section Particulars Volume No.
- Invitation for Bids
1 Instructions to Bidders I
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder V
8.2. Volumes I, II, III and IV are available online and documents to be furnished by the
bidder in compliance to section 2 will be prepared by him and furnished as Volume-
V in two parts (refer clause 12).
8.3. The bidder is expected to examine carefully all instructions, conditions of contract,
contract data, forms, terms, and technical specifications, bill of quantities, forms,
Annexesand drawings in the Bid Document. Failure to comply with the requirements
of Bid Documents shall be at the bidder’s own risk. Pursuant to clause 26 hereof,
bids which are not substantially responsive to the requirements of the Bid
Documents shall be rejected.
9. Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents may
notify the Employer in writing or through E-mail at the Employer’s address
indicated in the invitation to bid. The Employer will respond to any request for
clarification which he received earlier than 15 days prior to the deadline for
submission of bids. Employer’s response will be published on website including a
description of the enquiry but without identifying its source.
9.2. Pre-bid meeting
9.2.1. The bidder or his official representative is invited to attend a pre-bid meeting
which will take place at the address, venue, time and date as indicated in the
9.2.2. The purpose of the meeting will be to clarify issues and to answer questions on any
matter that may be raised at that stage.
9.2.3. The bidder shall be required to submit any questions in writing or e-mail to reach
the Employer not later than 03 days before the meeting.
9.2.4 Minutes of the meeting, including the question raised (Without identifying the
source of enquiry) and the responses given will be published without delay on the
tender website i.e. www.nprocure.com. Any modification of the bidding
documents listed in sub-Clause 8.1 which may become necessary as a result of the
pre-bid meeting shall be made by the Employer exclusively through the issue of an
Addendum pursuant to Clause 10 and not through the minutes of the pre-bid
9.2.5. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a
10. Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addenda.
10.2. Any addendum thus issued shall be part of the bidding documents. The Employer
will assume no responsibility for the same.
10.3. To give prospective bidders reasonable time in which to take an addendum into
account in preparing their bids, the Employer may, at his discretion, extend as
necessary the deadline for submission of bids, in accordance with Sub-Clause
C. PREPARATION OF BIDS
11. Language of the Bid
11.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer Clause
8.1) shall be in two separate parts:
Part I shall be named “Technical Bid” and shall comprise
(i) Bid Security in the form specified in Section
(ii) Qualification Information and supporting documents as specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in Clause
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2. The Bidder shall submit the details / information pertaining to each part i.e.
technical as well as financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
Invitation for Bids (IFB)
1 Instruction to Bidders Volume I
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
9 Drawings Volume IV
13.1 The Contract shall be for the whole works as described in Sub-Clause 1.1, based on
the priced Bill of Quantities submitted by the Bidder.
13.2 The bidder shall fill in rates and prices and line item total (both in figures and words)
for all items of the Works described in the Bill of Quantities along with total bid price
(Both in figures and words). Items for which no rate or price is entered by the bidder
will not be paid for by the Bill of Quantities.
13.3 All duties, taxes, and other levies except GST payable by the contractor under the
contract, or for any other cause shall be included in the rates, prices and total Bid
Price submitted by the Bidder. (GST will be paid extra)
13.5 The rates and prices quoted by the bidder are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 47 of the
Condition of Contract (Irrespective of the time limit and Bid Amount)
14. Currencies of Bid and Payment
14.1 The unit rates and the prices quoted by the bidder shall be entirely in Indian Rupees.
All payments shall be made in Indian Rupees.
15. Bid Validity
15.1 Bids shall remain valid for a period of not less than 180 days after the deadline date
forbid submission specified in Clause
15.2 In exceptional circumstances, prior to expiry of the original time limit, the Employer
may request that the bidders may extend the period of validity for a specified period.
A bidder may refuse the request without forfeiting his bid security. A bidder agreeing
to the request will not be required or permitted to modify his bid, but will be
required to extend the validity of his security for a period of the extension, and in
compliance with Clause 16 in all respects.
#16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown in
column 3 of the table of IFB for this particular work. This Bid security shall be in
favor of Employer as named in Appendix and may be in one of the following forms;
a. Bank Guarantee from any scheduled Indian bank, in the format given in
Volume III. (Bank Guarantee is applicable only for Bid Estimated Amount of
01 Crore and above) and Bank Guarantee of Schedule and Private Banks shall
be considered as per GoG Finance Department’s Circular No. FD/MSM/e-
file/4/2023/0057/D.M.O. Date 21/04/2023 or as per their latest amendment.
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign Bank
approved by the Reserve Bank of India.
# A Valid Bid Security / EMD Exemption Certificate issued by (1) Road &
Building Department or (2) Narmada Water Resources, Water Supply and
Kalpsar Department of Govt of Gujarat. Exemption Certificate is applicable
only when Registration Certificate of Appropriate Class and Category of
Approved Contractors is required as eligible criteria of bidder.
16.2. Bank guarantees (and other instruments having fixed validity) issued as surety for
the bid shall be valid for 45 days beyond the validity of the bid i.e. total validity of
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as
indicated in Sub-Clauses 16.1 and 16.2 above shall be rejected by the Employer as
non-responsive.
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of the end
of the bid validity period specified in Sub-Clause
16.5 The Bid Security of the successful bidder will be discharged when the bidder has
signed the Agreement and furnished the required Performance Security.
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit to
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) #If found necessary, the bidder will be intimated for negotiation, He will be
intimated maximum three times within the validity period for negotiation, If
contractor does not respond in time, his Bid Security (EMD) will be forfeited
and his tender will be rejected. Punitive action will be taken on such
contractors. (As per GoG R&B Dept’s Gr. No. S/22/2017/6369/D,
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the bidding
documents, including the conditions of contract (including mobilization advance or
time for completion), basic technical design as indicated in the drawing and
specifications. Conditional offers or alternative offers will not be considered further
in the process of tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause 12 of
these Instructions to bidder as the “Technical Bid “and “Financial Bid” in separate
parts to be uploaded.
D. SUBMISSION OF BIDS
20. Deadline for Submission of the Bids
20.1. Complete Bids must be received online by the Employer at the tender website
specified above not later than the date indicated in appendix.
20.2. The Employer may extend the deadline for submission of bids by issuing an
amendment in accordance with Clause 10, in which case all right and obligation of
the Employer and the bidders previously subject to the original deadline will then be
subject to the new deadline.
22. Modification and Withdrawal of Bids
22.1. Bidders may modify or withdraw their bids online before the deadline prescribed in
Clause 20 or pursuant to Clause
22.3. No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.4. Withdrawal or modification of a bid between the deadline for submission of bids
and the expiration of the original period of bid validity specified in Clause
above or as extended pursuant to Clause 15.2 may result in the forfeiture of the Bid
security pursuant to Clause
E. BID OPENING AND EVALUATION
23. Bid Opening
23.1 The Employer will open all the Bids received including modifications made pursuant
to Clause 22, in the presence of the Bidders or their representatives who choose to
attend at time, date and the place specified in Appendix in the manner specified in
Clauses 20 and 23.3, In the event of the specified date of Bid opening being declared
a holiday for the Employer, the Bids will be opened at the appointed time and
location on the next working day.
23.3. The “Technical Bid” shall be opened. The amount, form and validity of the bid
security furnished with each bid will be announced. If the bid security furnished does
not conform to the amount and validity period as specified in the invitation for bid
(ref. Column 4 and paragraph 3), and has not been furnished in the form specified in
Clause 16, the technical bid will not be opened.
23.4. (i) Subject to confirmation of the bid security by the issuing Bank, the bids
accompanied with valid bid security will be taken up for evaluation with
respect to the Qualification information and other information furnished in
part I of the bid pursuant to Clause 12.1.
(ii) If required, the bidder will be asked in writing to clarify his Qualification
Documents with respect to any required clarification.
(iii) The bidders will respond in not more than 7 days of issue of the clarification
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarification the
Evaluation Committee will finalize the list of responsive bidders whose
financial bids are eligible for consideration.
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of only
these bidders will be opened. The responsive Bidders’ names, the Bid prices, the
total amount of each bid, any discount and such other details as the Employer may
total amount of each bid, any discount and such other details as the Employer may
consider appropriate, will be announced by the Employer at the opening.
23.7 the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of only
these bidders will be opened. The responsive Bidders’ names, the Bid prices, the
total amount of each bid, any discount, and such other details as the Employer may
total amount of each bid, any discount, and such other details as the Employer may
consider appropriate, will be announced by the Employer at the opening.
23.8 In case bids are invited for more than one package, the order for opening of the
“Financial Bid” shall be in order of estimated amount of Bids from highest to lowest.
23.9 The Employer shall prepare minutes of the Bid opening, including the information
disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison of
Bids and recommendations for the award of a contract shall not be disclosed to
Bidders or any other persons not officially concerned with such process until the
award to the successful Bidder has been announced. Any effort by Bidder to
influence the Employer’s processing of Bids or award decisions may result in the
rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer may,
at his discretion, ask any Bidder for clarification of his Bid, including breakdowns of
unit rates. The request for clarification and the response shall be in writing or by e-
mail, but no change in the price or substances of the Bid shall be sought, offered, or
permitted except as required to confirm the correction of arithmetic errors
discovered by the Employer in the evaluation of the Bids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter
relating to his Bid opening to the contract is awarded. If the Bidder wishes to bring
additional information to the notice of the Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid evaluation,
bid comparison or contract award decision may result in the rejection of the Bidders’
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will determine whether
each Bid (a) meets the eligibility criteria defined in Clause 3 and 4; (b) has been
properly signed; (c) is accompanied by the required securities and; (d) is
substantially responsive to the requirements of the Bidding document. During the
detailed evaluation of the “Financial Bid”, the responsiveness of the bids will be
further determined with respect to the remaining bid conditions, i.e., priced bill of
quantities, technical specifications, and drawings.
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms,
conditions and specifications of bidding documents, without material deviation or
reservation. A material deviation or reservation is one (a) which affects in any
substantial way the scope, quality, or performance of the Works; (b) which limits in
any substantial way, inconsistent with the Bidding documents, the Employer’s rights
or the Bidder’s obligations under the Contract; or (c) whose rectification would affect
unfairly the competitive position of other Bidders presenting substantially
responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the
Employer, and may not subsequently be made responsive by correction or
withdrawal of the non-conforming deviation or reservation.
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be
substantially responsive in accordance with Sub-Clause 26.2.
29.3. The Employer reserves the right to accept or reject any variation or deviation.
Variation and deviations and other factors, which are in excess of the requirements
of the Bidding documents or otherwise result in unsolicited benefits for the
Employer, shall not be taken in to account in Bid evaluation.
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the
Conditions of Contact, during the period of implementation of the Contract, will not
be taken in to account in Bid evaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the
Engineer’s estimate of the cost of work to be performed under the contract the
Employer may require the Bidder to produce detailed consistency of those prices
with the construction methods and schedule proposed. After evaluation of the price
analyses, the Employer may require that the amount of the performance security set
forth in Clause 34 be increased at the expense of the successful /bidder to a level
sufficient to protect the Employer against financial loss in the event of default of the
successful Bidder under the Contract.
29.6. A bid which contains several items in the bill of Quantities which are unrealistically
priced low and which cannot be substantiated satisfactorily by the bidder may be
rejected as non-responsive.
F. AWARD OF CONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid
has been determined.
(i) to be substantially responsive to the Bidding documents and who has offered
the lowest evaluated Bid Price; and
(ii) To be within the available bid capacity adjusted to account for his bid price
which is the lowest evaluation in any of the packages opened earlier than the
one consideration.
In no case, the contract shall be awarded to any bidder whose available bid capacity
is less than the evaluated bid price, even if the said bid is the lowest evaluated bid.
The contract will in such cases be awarded to the next lowest bidder at his
evaluation bid price.
32. Employer’s Right to accept any Bid and to reject any or all Bids
32.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject any
Bid, and to cancel the Bidding process and reject all Bids, at any time prior to the
award of contract, without thereby incurring any liability to the affected bidder or
Bidder or any obligation to inform the affected Bidder or Bidders of the grounds for
the Employer’s action.
33. Notification of Award and Signing of Agreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the
Employer prior to expiration of the Bid validity period by cable, telex or facsimile
confirmed by registered letter. This letter (hereinafter and in the condition of
contract called the “Letter of Acceptance”) will state the sum that the Employer will
pay the Contractor in consideration of the execution, completion, and maintenance of
the Works by the Contractor as prescribed by the Contract (hereinafter and in the
Contract called the “Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject only to
the furnishing of a performance security in accordance with the provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the
successful Bidder. It will be signed by the Employer and to the successful Bidder,
within 28 days following the notification of award along with the Letter of
Acceptance. Within 21 days of receipt, the successful Bidder will sign the Agreement
and deliver it to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the
Employer will promptly notify the other Bidders that their Bids have been
34. Performance Security
34.1. (A) Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder
shall furnish to the Employer an irrevocable and unconditional guarantee from a
Bank in the form set forth in Section 8 (the “Performance Security”) for an
amount equal to 5% (five percent) of its Contract Price. In case of bids
mentioned below, the successful Bidder, along with the Performance Security,
Shall also furnish to the Authority an irrevocable and unconditional guarantee
from a Bank in the same form given at Section 8 towards an Additional
Performance Security (The “Additional Performance Security”) for an amount
calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but
upto 20% of the Estimated Project Cost, then the Additional Performance
Security shall be calculated @ 20% of the difference in the (i) Estimated
Project Cost (as mentioned in Bid Document) - Minus 10% of the
Estimated Project Cost and (ii) Contract Price offered by the selected
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of
the Estimated Project Cost, then the Additional Performance Security
shall be calculated @ 30% of the difference in the (i) Estimated Project
Cost (as mentioned in Bid Document) - Minus 10% of the Estimated
Project Cost and (ii) Contract Price offered by the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the
Performance Security.
(B) The Performance Security shall be valid beyond 60(sixty) days from the
stipulated date of completion of the project and the Additional Performance
Security shall be valid beyond 28 (twenty-eight) days of Project Completion
Performance Security shall become refundable/releasable within 15 days
after certified project completion date subject to Fulfillment of contractual
obligation and settlement of all dues and claims.
34.2. If the performance security is provided by the successful Bidder in the form of a
Bank Guarantee, it shall be issued either (a) at the Bidder’s option, by a
Nationalized/Scheduled Indian bank or (b) by a foreign bank located in India and
acceptable to the Employer. As per GoG Finance Department’s Circular No.
FD/MSM/e-file/4/2023/0057/D.M.O. Date 21/04/2023 or as per their latest
34.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause
shall constitute sufficient grounds for cancellation of the award and forfeiture of
the Bid Security.
35 Advance Payment and Security
35.1 The Employer will provide an Advance payment on the Contract Price as stipulated
in the Conditions of Contract, subject to maximum amount, as stated in the
37. Corrupt of Fraudulent Practices
37.1 The Employer will reject a proposal if it determines that the Bidder recommended
for award has engaged in corrupt or fraudulent practices in completing for the
contract in question and will declare the firm ineligible, either indefinitely or for a
stated period of time, to be awarded a contract with National Highways Authority of
India/ State PWD and any other agencies, if it at any time determines that the firm
has engaged in corrupt or fraudulent practices in completing for the contractor, or
37.2 Furthermore, Bidders shall be aware of the provision stated in Sub- Clause 59.2 of
the Conditions of Contract.
APPENDIX TO ITB
Clause Reference
With respect to
1. The Name of the Employer is Gujarat Maritime [ Cl.1.1]
2. The last five years.
3. This Annual Financial Turnover Amount is Rs. [Cl.4.5.3 (a)]
4. Value of Work is Rs. 5,36,55,438.11 approx
6. The cost of electric work is Rs.0.00
7. The cost of water supply / sanitary works is
8. Liquid assets and / or availability of credit [Cl.4.5.6 ]
facilities is Rs.
9. Price level of the financial year …………… [Cl. 4.5.2]
10. The pre-bid meeting will take place at …………. [Cl. 9.2.1]
11. The technical Bid will be opened at the office of
the Executive Engineer (C), Procurement Cell,
Gujarat Maritime Board, Gandhinagar on
12. Address of the Employer: Gujarat Maritime
Board, Sagar Bhawan, Sector 10 A, Opp. Air
Force, Gandhinagar-
14. The bid should be submitted latest by [Cl. 20.1 & 20.2]
As stated on online NIT
15. The bid will be opened at Executive Engineer [Cl. 23.1 ]
(C), Procurement Cell, Gujarat Maritime Board,
Gandhinagar As stated on online NIT
16. The Bank Draft in favor of Gujarat Maritime
Board, Gandhinagar
18. Escalation factors (for the cost of works [Cl.4.5.2]
executed and financial figure to a common base
value) for works completed
Year Financial Year Multiplying factor
Base year of inviting tender 2026-2027
#LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT WORK
[Reference CL. 4.5.5]
The contractors shall also give a list of machineries in his possession and which they
propose to use on the work.
Sr. Plant or Location Age of Make Capacity Approximate Remark
No. Machinery Machinery Value
List of Key Personnel to be deployed on Contract Work
(Reference Cl. 4.5.4)
# Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution of this
work as under: -
1. One graduate Civil Engineers and One diploma Civil Engineers when cost of the work
to be executed is more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be executed
is more than Rs.15 lakhs but less than Rs.50 lakhs.
3. Minimum one Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs
but more than Rs.5 lakhs.
4. Minimum two Diploma Civil Engineers for the work when the cost of work to be
executed is less than Rs. 5 lakhs. The Engineer so employed for the Government work
must have sufficient experience to handle the work independently. Such an Engineer
shall have to stay at the site of work and he shall not be entrusted with other duty
except this work.
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer,
Employment of a separate Engineer will not be necessary provided that the Engineer
partner himself attends the execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the Deputy
Executive Engineer-in-charge of the work the Name, Qualifications, copy of marksheet,
Colour Photograph and the appointment order issued such engineers engaged for this
contract work. If 15 days after issue of work order such designated Site Engineers do
not resume or do not remain present on site of work, the recovery at the rate of
Rs.15,000-00 per month per Engineer will be made from the bills/deposit/dues of the
contractor. Such recovery shall be non-refundable.
QUALIFICATION INFORMATION
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for
the purpose of post qualification as provided for in Clause 4 of the Instruction to Bidders.
This information will not be incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of Bidder
Place of registration
Principal place of business
Power of attorney of signatory of Bid
1.2 Total value of Civil engineering constructions 2025-2026
Work performed in the last five years 2024-2025
1.3 (in Rs. Lakhs) 2023-2024
1.3.1 Work performed as prime contractor, work performed in the past as a nominated sub-
contractor will also be considered the sub-contract involved execution of all
main items of work described in the bid documents, provided further that all other
qualification criteria are satisfied (in the same name) on works of a similar nature
over the last five years** and in current year before the submission of the bid.
Project Name of Description Contract Value of Date Stipulated Actual date Remark
Name the of work No. contract of period of of explaining
Employer (Rs. issue completion completion* reasons for
Crore) of delay &
order Completed
*Attach certificate(s) from the Engineer(s)in-charge
** Immediately preceding the financial year in which bids are received.
#1.3.2 Quantities of work executed as prime contractor, work performed, in the past as a
nominated sub-contractor, will also be considered provided the sub-contract
involved execution of all main items of work described in the bid document,
provided, further that all other qualification criteria are called (in the same name and
style) in the last five years** and in current year before the submission of the bid.
Year Name Name of Quantity of work performed (Cum/MT) Remarks*
of the the Cement Masonry Earth Bituminous (indicate
work Employer Concrete Works Work contract Ref)
1.4 Information on Bid Capacity (works for which bids have been submitted and works
which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Description Place Contract Name & Value Stipulated Value of Anticipated
of works & No. Address Contract Period of Works* of
State of (Rs. Cr) Completion remaining completion
*Attach certificate (s) from the Engineer(s) in-charge
** Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works (Ref.
Clause 4.5.5). The Bidder should list all the information requested below.
Item of Requirement Availability Proposals Remarks
Equipment NO Capacity Owned/ Nos/. Age/ (from
Leased to be Capacity Conditions whom to
1.6 Qualifications and experience of key personnel required for administration and
execution of the contract. Attach biographical data. Refer also to Sub Clause 9.1 of
the Conditions of Contract.
Position Name Qualification Year of Year of
Experience experience in
(General) the proposed
Project Manager
1.7 Proposed sub-contract and firms involved
Sections of the Value of Sub- Sub-Contractor Experience in
works Contractor (Name & similar work
Attach copies of certificates on possession of valid license for executing water
supply/ sanitary work/ building electrification works.
1.8 Financial reports for the last five years: balance sheets, profit and loss statements,
auditors’ reports (in case of companies/corporations), etc. List them below and
1.9 Evidence of access to financial resources to meet the qualification requirements:
cash in hand, lines of credit, etc. List them below and attach copied documents.
1.10 Name, address, and telephone, telex, and fax numbers of the Bidders bankers who
may provide references if contacted by the Employer.
1.11 Information on Litigation history in which the Bidder is involved.
Other Party Employer Cause of Amount Remarks
(ies) Dispute Involved showing
1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the instruction
to Bidders. (Name of Consultant engaged for project preparations is * ............................... )
1.13 Proposed work method and schedule. The Bidder should attach descriptions,
drawings and charts as necessary to comply with the requirements of the Bidding
documents. (Refer ITB Clause 4.1)
3. Additional Requirements
3.1 Bidders should provide any additional information required to fulfill the
requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
* Fill the name of Consultant
SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR
AVAILABILITY OF CREDIT FACILITIES
(CLAUSE 4.5.6 OF ITB)
BANK CERTIFICATE
This is to certify that M/s. is a reputed company
with a good financial standing.
If the contract for the work, namely is awarded to the
above firm, we shall be able to provide overdraft/credit facilities to the extent of
Rs. to meet their working capital requirements for executing the above
during the contract period.
Senior Bank Manager
Address of the Bank
1. I, the undersigned, do hereby certify that all the statements made in the required
attachments are true and correct.
2. The undersigned also hereby certifies that neither our firm M/s.
_ have not abandoned any work of
Government of Gujarat/Government of India/any Board or Corporation under
Government of Gujarat/Government of India nor any contract awarded to us for such
works have been rescinded, during last five years prior to the date of this bid.
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm or
corporation to furnish pertinent information deemed necessary and requested by the
Department to verify this statement or regarding any (our) competence and general
4. The Undersigned understands and agrees that further qualifying information may be
requested, and agrees to furnish any such information at the request of the
Department/ Project implementing agency.
(Signed by an Authorized officer of the firm)
Title of officer
I, the undersigned do hereby undertake that our firm
up to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
CONDITIONS OF CONTRACT
Conditions of Contract
Table of Contents
A General Page D. Cost Control
1 Definitions 39 37 Bill of Quantities
2 Interpretation 40 38 Changes in the Quantities
3 Language and Law 41 39 Variations
4 Engineer’s Decisions 41 40 Payments for Variations
5 Delegations 41 41 Cash Flow Forecasts
6 Communications 41 42 Payment Certificates
7 Sub-Contractors 41 43 Payments
8 Other Contractors 41 44 Compensations Events
9 Personnel 42 45 Tax
10 Employer’s & Contractor Risk 42 46 Currencies
11 Employers Risks 42 47 Price Adjustment
12 Contractor’s Risk 42 48 Retention
13 Insurance 42 49 Liquidated damages
14 Site Investigations Reports 43 50 Bonus
15 Queries about the Contract 43 51 Advance Payment
16 Contractors to Construct the 43 52 Securities
17 The Works to be Completed By 43 53 Deleted
the Intended Completion Date
18 Approval by the Engineer 43 54 Cost of Repair
20 Discoveries 44 E. Finishing the Contract
21 Possession of the Site 44 55 Completion
22 Access to the Site 44 56 Taking Over
23 Instructions 44 57 Final Account
24 Disputes 44 58 Operating and Maintenance
25 Procedure for Disputes
26 Deleted 45 59 Terminations
60 Payment upon Terminations
B. Time Control 61 Property
27 Programme 46 62 Release from Performance
28 Extensions of the Intended
completion date
29 Deleted 46 F. Special Conditions of
30 Delays Ordered by The 46 63 Labour
Engineer 64 Compliance with labour
31 Management Meetings 47 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
CONDITIONS OF CONTRACT
1.1 Terms which are defined in the Contract Data are not also defined in the Conditions
of Contract but keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities
forming part of the Bid
Compensation Events are those defined in Clause 44 hereunder
The Completion Date is the date of completion of the Works as certified by
the Engineer in accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to
execute, complete and maintain the Works till the completion of Defects
Liability Period. It consists of the documents listed in Clause 2.3 below.
The Contract data defines the documents and other information which
comprise the Contract.
The Contractor is a person or corporate body whose Bid to carry out the
Work has been accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by the
Contractor to the Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and
thereafter as adjusted in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and
calculated from the Completion Date.
The Employer is the party who will employ the Contractor to carry out the
The Engineer is the person named in the Contract Data (or any other
competent person appointed and notified to the contractor to act in replacement of
the Engineer) who is responsible for supervising the Contractor, administering the
Contract, certifying payments due to the Contractor, issuing and valuing Variations
to the Contract, awarding extensions of time, and valuing the Compensations
Equipment is Contractor’s machinery and vehicles brought temporarily to
the site to construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s
Letter of Acceptance.
The Intended Completion Date is the date on which it is intended that the
Contractor shall complete the Works. The Intended Completion Date is specified in
the Contract Data. The Intended Completion Date may be revised only by the
Engineer by issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor for
incorporation in the works.
Plant is any integral part of the work which is to have mechanical, electrical,
electronic or chemical or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding
documents and are factual interpretive reports about the surface and subsurface
conditions at the site.
Specifications means the Specifications of the works included in the Contract
and any modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the
Contractor shall commence execution of the works. It does not necessarily coincide
with any of the Site Possession Dates.
A Subcontractor is a person or corporate body who has a Contract with the
Contractor to carry out a part of the work in the Contract which includes work on the
Temporary Works are works designed, constructed, installed, and removed
by the Contractor which are needed for construction or installation of the Works.
A Variation is an instruction given by the Engineer, which varies the Works.
The Works are what the Contract requires the Contractor to construct, install,
and turn over to the Employer, as defined in the Contract Data.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural, male
also means female or neuter and the other way around. Heading have no
significance. Words have their normal meaning under the language of the
Contract unless specifically defined. The Engineer will provide instructions
clarifying queries about Conditions of Contract.
2.2 If sectional completion is specified in the Contract Data, references in the
Conditions of Contract to the Works, the Completion date, and Intended
Completion Date apply to any Section of the Works (other than references to
the Completion Date and Intended Completion date for the whole works)
2.3 The documents forming the Contract shall be interpreted in the following
order of priority
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of the
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated in
the Contract Data.
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide
contractual matters between the Employer and the Contractor in the role
representing the Employer.
5.1 The Engineer may delegate any of his duties and responsibilities to other
people after notifying the Contractor and may cancel any delegation after
notifying the Contractor.
6. Communications
6.1 Communications between parties which are referred to in the conditions are
effective only when in writing. A notice shall be effective only when it is
delivered (in terms of Indian Contract Act).
7. Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit specified in
contract data, with the approval of the engineer but may not assign the
Contract without the approval of the Employer in writing. Subcontracting
shall not alter the Contractor’s obligations. Sub-contracting of supply or
specific items of work is not allowed.
7.2 The sub-contractor must be registered in appropriate class and category for
the part of work to be subcontracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors,
public authorities, utilities and the Employer between the dates given in the
Schedule of other Contractor. The Contractors shall as refer to in the Contract
Data, also provide facilities and services for them as described in the
Schedule. The employer may modify the schedule of other contractors and
shall notify the contractor of any such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule of Key
Personnel as referred to in the Contract Data to carry out the functions stated
in the Schedule or other personnel approved by the Engineer. The Engineer
will approve any proposed replacement of key personnel only if their
qualifications, abilities, and relevant experience are substantially equal to or
better than those of the personnel listed in the Schedule.
9.2 If the engineer asks the Contractor to remove a person who is a member of
the Contractor Staff or his work force stating the reasons the Contractor shall
ensure that the person leaves the Site within seven days and has no further
connection with the work in the Contract.
10. Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s
risks, and the Contractor carries the risks which these Contracts states are
Contractor’s risk.
11. Employer’s Risks
11.1 T h e employer is responsible for the excepted risks which are (a) in so far as
they directly affect the execution of the Works, the risks of war, hostilities,
invasion, act of foreign enemies, rebellion, revolution, insurrection or military
or usurped power, civil war, riot commotion or disorder (unless restricted to
the Contractor’s employees), and contamination from any nuclear fuel or
nuclear waste or radioactive toxic explosive.
12. Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury and
death which arise during and in consequence of the performance of the
Contract other than the excepted risks are the responsibility of the
13.1 The Contractor shall provide, in the joint names of the Employer and the
Contractor, insurance cover from the Start date to the end of the Defects
Liability Period, in the amounts and deductibles stated in the Contract data
for the following events which are due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant, Materials and
Equipment) in connection with the Contract; and
(d) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor to
the Engineer for the Engineer’s approval before the Start Date. All such
insurance shall provide for compensation to be payable in the types and
proportions of currencies required to rectify the loss or damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates
required, the Employer may affect the insurance which the Contractor should
have provided and recover the premiums the Employer has paid from
payments otherwise due to the Contractor or, if no payment is due, the
payment of the premiums shall be a debt due.
13.4 Alterations to the terms of an insurance shall not be made without the
approval of the Engineer.
13.5 Both parties shall comply with any conditions of the insurance policies.
14. Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation
reports referred to in the Contract Data, supplemented by any information
available to the Bidder.
15. Queries about the Contract data
15.1 The engineer will clarify queries on the Contract Data
16. Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the
specification and Drawings.
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date and
shall carry out the Works in accordance with the programme submitted by
the Contractor, as updated with the approval of the Engineer, and complete
them by the Intended Completion date
18. Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the
proposed Temporary works to the Engineer, who is to approve them if they
comply with the Specifications and drawings.
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for
design of the Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the
Temporary works where required.
18.5 All Drawings prepared by the Contractors for the execution of the temporary
or permanent work are subject to prior approval by the Engineer before their
19.1 The Contractor shall be responsible for the safety of all activities on the Site.
20. Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly
discovered on the site is the property of the Employer. The contractor is to
notify the engineer of such discoveries and carry out the Engineer’s
instructions for dealing with them.
21. Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the Contractor. If
possession of a part is not given by the date stated in the Contract Data the
Employer is deemed to have delayed the start of the relevant activities and
this will be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site is
not handed over to the Contractor, then contractor/ Employer may fore-close
the contract. Contractor/Employer has to foreclose the work within 30 days
after lapse of 25%-time limit and after 30 days foreclosure option will be
22. Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the
Engineer access to the Site, to any place where work in connection with the
Contract is being carried out or is intended to be carried out and to any place
where materials or plants are being manufactured/ fabricated/ assembled for
23. Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to
works which comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s
accounts and records relating to the performance of the Contractor and to
have them audited by auditors appointed by the Employer, if so required by
24.1 If the Contractor is of the view that a decision taken by the Engineer was
either outside the authority given to the Engineer by the Contract or that the
decision was wrongly taken, the decision shall be referred to
#Superintending Engineer of concerned Project Implementation Unit
(Higher Authority) within 14 days of the notification of the Engineer's
decision. If the issue is not resolved, any party can refer the matter for
conciliation within 15 days from the decision given by the #Superintending
Engineer of concerned Project Implementation Unit.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with
the decision of the #Superintending Engineer of Veraval Project
Implementation Unit, both the parties have to refer to the Chief
Engineer concern for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied
with the decision of the #Superintending Engineer of Veraval Project
Implementation Unit, both the parties have to refer to the #Secretary,
Roads & Building Department, Government of Gujarat for the
conciliation process.
If the dispute is not resolved through the conciliation process, he may refer
the dispute to Gujarat Public Works Contract Dispute Arbitration Tribunal. If
the Contractor fails to refer a claim / dispute to the Higher Authority within
14 days of the notification of the Engineer's decision, the Contractor shall not
be entitled to any additional payment/claim if he doesn’t follow the above
sequence in stipulated time and he should not stop the work.
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration
procedure stated in the Special Conditions of Contract.
B. TIME CONTROL
27.1 Within the time stated in the Contract Data the Contractor shall submit to the
Engineer for approval a Programme showing the general methods,
arrangements orders, and timing for all the activities in the works along with
monthly cash flow forecast.
27.2 An update of the Programme shall be a programme showing the actual
progress achieved on each activity and the effect of the progress achieved on
the timing of the remaining work including any changes to the sequence of
the activities.
27.3 The Contractor shall submit to the Engineer, for approval an updated
programme at intervals no longer than the period stated in the Contract data.
If the Contractor does not submit an updated programme within this period,
the Engineer may withhold the amount stated in the Contract data from the
next payment after the date on which the overdue programme has been
27.4 The Engineer’s approval of the programme shall not alter the Contractor’s
obligations. The Contractor may revise the programme and submit it to the
Engineer again at any time. A revised programme is to show the effect of
Variations and Compensations events.
28. Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a compensation
Event occurs or a Variation is issued which makes it impossible for
completion to be achieved by the Intended Completion Date without the
Contractor taking steps to accelerate the remaining work and which would
cause the Contractor to incur additional cost.
28.2 The Engineer shall decide whether and by how much to extend the Intended
Completion Date within 35 days of the Contractor asking the Engineer for a
decision upon the effect of a compensation event or Variation and submitting
full supporting information. If the Contractor has failed to give early warning
of a delay or has failed to cooperate in dealing with a delay, the delay by this
failure shall not be considered in assessing the new Intended Completion
28.3 The Engineer shall within 14 days of receiving full justification from the
contractor for extension of Intended Completion Date refer to the Employer
his decision. The employer shall in not more than 21 days communicate to the
engineer the acceptance or otherwise of the Engineer’s decision. If the
employer fails to give his acceptance, the Engineer shall not grant the
extension and the contractor may refer the matter under Clause
30. Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or progress of any
activity within the works.
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a
management meeting. The business of a management meeting shall be to
review the plans for remaining work and to deal with matters raised in
accordance with the early warning procedure.
31.2 The Engineer shall record the business of management meetings and is to
provide copies of his record to those attending the meeting and to the
Employer. The responsibility of the parties for actions to be taken is to be
decided by the Engineer either at the management meeting or after the
management meeting and stated in writing to all who attended the meeting.
32. Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of specific
likely future events or circumstances that may adversely affect the quality of
the work, increase the Contract price or delay the execution of works. The
Engineer may require the contractor to provide an estimate of the expected
effect of the future event or circumstance on the contract price and
completion date. The estimate is to be provided by the Contractor as soon as
reasonably possible.
32.2 The Contractor shall cooperate with the Engineer in making and considering
proposals for how the effect of such an event or circumstance can be avoided
or reduced by anyone involved in the work and in carrying out any resulting
instruction of the Engineer.
C. QUALITY CONTROL
# 33. Identifying Defects/ Defect liability period
33.1 : Defect liability period: The contractor shall be responsible to make good and
remedy at his own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of completion.
The Engineer in charge shall give the contractor a notice in writing about the
defects and the contractor shall make good the same within 15 days of receipt
of the notice. In the case of failure on the part of the contractor, the Engineer-
in-charge may rectify or remove or re-execute the work at the risk & cost of
the contractor. The Engineer-in-charge shall be entitled to appropriate the
whole or any part of the amount of security deposit towards the expenses, if
any, Incurred by him in rectification, removal or re-execution. The Defects
Liability period shall be as under….
(a) For all works costing up to Rs. 50,000 (amount put to tender), the period shall
be 3 Months from the certified date of completion.
(b) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount put
tender), the period shall be 12 (Twelve) months from the certified date of
completion or one monsoon, whichever is later.
(c) For major projects costing more than Rs. 1 crore, the period shall be
Months from the certified date of completion which should include three
(d) For original building works the defect liability period will be 4 years or elapse
of 4 monsoon period from the certificate date of Completion. Whichever is
For the purpose of deciding the monsoon period, the 30th September shall be
treated as the last date.
Modified vide R & B D Circular No. PAC-11-102008-2076-N dated 31/8/2009,
PRCH/102013(2976) 2759-N, dated 27/05/2013 and Circular
No.TNC/10/2016/Clause 17A (Correction/ (1)C Dated 12/05/2016]
33.2 Free maintenance guarantee period for works of Pacca Stacking Plateform
Road/Bridge construction
(a) For resurfacing work of road free maintenance guarantee period one year
from the date of completion.
(b) In case of Plateform work widening of the road/strengthening of the
road/bridge, the contractor shall have to give Four years free maintenance
guarantee from the certified date of completion. During this period the
contractor shall visit the site every six months along with the concerned
Section Officer / Deputy Executive Engineer and will examine the work
already carried out in this contract like Plateform, road work, jungle
cutting, side shoulders, side gutter, road furniture, patta etc. and will
prepare Km. wise inspection report duly signed by all concerned and any
defect observed shall be done within 15 days by the contractor at his risk
and cost as per the direction of Engineer in charge. The contractor needs
to do videography of these visits and require to submit at the time of
release of FMG. If B.T. the surface during the maintenance period of
years is worn out then agency shall have to provide renewal coating as per
tender item as directed by the Engineer-in- charge. The amount equivalent
to 5% of each running bill shall be withheld and will be released after the
free maintenance guarantee period (i.e. 4 years) is over.
However, this amount shall be released against fixed deposit or bank
guarantee pledged in the name of Executive Engineer after completion
certificate of work is issued.
(1) The flakiness and elongation index (combined) for coarse aggregates
under no circumstances shall exceed the allowable limit set forth in the
relevant clause for the material in question.
(2) 2% of the amount eligible for the payment of bituminous items shall be
withheld till the miscellaneous items like earthwork in embankment /
cutting for side shoulders, side gutters, kilometer / indicator / guard
stones, sign boards etc. are completed in all respect by the contractor.
After completion of the miscellaneous items, the above said 2% withheld
amount shall be released.
(Govt. of Gujarat's G.R. No.: TNC-10-2013-3(Part-3)/C, Dtd. 13/12/2013).
(3) Videography for the surface under Maintenance Guarantee is to be done as
per Govt. letter No.: SSR/10/2015-16/26/C, Dtd. 26/11/15 for the work
costing more than Rs. 5.00 Crore.
(4) Setting up of adequate laboratory & deployment of quality engineers.
The contractor shall have to set up the laboratory with adequate
equipment. Till the setting up of adequate laboratory is completed &
reported of this to the engineer (subject to due verification by engineer’s
representative) by contractor in writing, Rs.2,00,000/- shall be withheld.
The qualified quality Engineer shall be deployed exclusively for this
contract by the contractors. If quality Engineer is not deployed by
contractor within one month after the date of work order, the amount
equivalent to Rs.20,000 per month shall be recovered till the actual
deployment of quality engineer. The amount so recovered towards the
deployment of quality engineers shall not be refunded.
(5) Asphalt work will have to be cross checked as per G.R. No.:
RGN/60/2006/35/C, dtd.31/05/07 before final bill is paid.
(6) Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain, at his own
risk and cost, the existing lane(s) of the road so that the traffic worthiness
and safety thereof are at no time materially inferior as compared to their
condition 10 (ten) days prior to the date of the Agreement, and shall
undertake the necessary repair and maintenance works for this purpose;
provided that the Contractor may, at his cost, interrupt and divert the flow
of traffic if such interruption and diversion is necessary for the efficient
progress of works and conforms to Good Industry Practice; provided
further that such interruption and diversion shall be undertaken by the
Contractor only with the prior written approval of the Executive Engineer
which approval shall not be unreasonably withheld. For the avoidance of
doubt, it is agreed that the Contractor shall at all times be responsible for
ensuring safe operation of the road.
33.3 The Engineer shall check the Contractor’s work and notify the Contractor of
any defects that are found. Such checking shall not affect the Contractor’s
responsibilities the Engineer may instruct the Contractor to search for a
Defect and to uncover and test any work that the Engineer considers may
34.1 If the engineer instructs the Contractor to carry out a test not specified in the
Specification to check whether any work has a Defect and the test shows that
it does, the Contractor shall pay for the test and any samples. If there is no
defect the test shall be a Compensation Event.
34.2 #1% of the amount of work done should be deducted from R.A. Bill of the
contractor for testing the quality of material workmanship, irrespective of
actual charges. The amount for testing the quality of material workmanship
will be boarn by contractor.
34.3 Agency has to establish testing laboratory on site for the various test to be
carried out in the work for this purpose agency shall construct a pukka
laboratory building with all facility on site at location specified by the
engineer in charge.
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the end
of the defects Liability Period, which begins at Completion and is defined in
the contract data. The Defects Liability Period shall be extended for as long as
Defects remain to be corrected.
35.2 Every time notice of a Defect is given, the Contractor shall correct the notified
defect within the length of time specified by the Engineer’s notice.
36. Uncorrected Defects
36.1 If the Contractor has not corrected a defect within the time specified in the
Engineer’s notice, the Engineer will assess the cost of having the Defect
corrected, and the Contractor will pay this amount.
D. COST CONTROL
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions, installation,
testing and commissioning work to be done by the Contractor.
37.2 The bill of Quantities is used to calculate the Contract price. The Contractor is
paid for the quantity of the work done at the rate in the Bill of Quantities for
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to the
original specifications , drawings, designs and instructions that may appear to
him to be necessary or advisable during the progress of the work and the
contractor shall be bound to carry out the work in accordance with any
instruction in this connection which may be given to him in writing signed by
the Engineer and such alteration shall not invalidate the contract and any
additional work which the contractor may be directed to do in the manner
above specified as part of the work shall be carried out by the contractor on
the same conditions in all respects on which he agreed to do the main work
and at the same rate as are specified in the tender for the main work.
Except that when the quantity of any item exceeds the quantity as in the
tender by more than 130%, the contractor will be paid for the quantity in
excess of 130%, at the rate entered in the SOR of the year during which the
excess in quantity is first executed.
39.1 All Variations shall be included in updated programmes produced by the
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no rate
is specified in this contract, then such class of work shall be carried out as
(i) At the rate derived from the item within the contract which is comparable to
the one involving additional or altered class of work; where there are more
than one comparable items, the item of the contract which is nearest in
comparison with regard to class or classes of the work involved shall be
selected and the decision of the Superintending Engineer of concerned Project
Implementation Unit as to the nearest comparable item shall be final and
binding on the contractor.
(ii)If the rate cannot be derived in accordance with (i) above, such class of works
shall be carried out at the rate entered in the Schedule of Rates of the division
for the year in which the tender was received, increased or decreased by the
percentage by which the tender amount is more or less as compared to the
amount arrived at the rates in the “Schedule of Rates” of the Division in the
year in which the tender was received. If the Schedule of rates of the Division
does not contain all the items, the percentage increase or decrease of the
tender shall be calculated considering such items which were included in the
“Scheduled Rates” of the division for the year and for materials consumed on
such item the rate to be charged would be the basic rate taken into account
for fixing the rate in S.O.R. referred to above.
If it is not possible to arrive at the rate from (i) and (ii) above, such class of
work shall be carried out at the rate decided by the competent authorities on
the basis of detailed rate analysis after hearing the contractor before a
committee of two Superintending Engineers- Superintending Engineer
(Civil)- Head Quarter circle and Superintending Engineer (Civil)- Project
Implementation Unit.
40.2 If the additional or altered work, for which no rate is entered in the “Schedule
of Rates” of the Division is ordered to be carried out before the rate is agreed
upon, then the contractor shall within seven days of the date of receipt by him
of the order to carry out the work, inform the Engineer-in-charge of the rate,
which it is his intention to charge for such class of work and if the Engineer in
charge does not agree to this rates, he shall by notice in writing be at liberty
to cancel his order to carry out such class of work and arrange to carry it out
in such manner as he may consider it advisable, provided always that if the
contractor shall commence work or incur any expenditure in regard thereof
before the rates shall have been determined as lastly herein before
mentioned, then in such cases he shall only be entitled to be paid in respect of
the work carried out or expenditure incurred by him prior to the date of the
determination of the rate as aforesaid according to such rate or rates as shall
be fixed by the Engineer-in-charge. In the event of the dispute, the decision of
the Superintending Engineer of the Circle shall be final.
Where, however, the work is to be executed according to the designs,
drawings and specifications recommended by the contractor and accepted by
the competent authority, the alternation above referred to shall be within the
scope of such designs, drawings and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the
proportion that the increase in the cost occasioned by alterations bears to the
cost of the original work and the certificate of the Engineer-in-charge as to
such proportion shall be final and conclusive.
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer
with an updated cash flow forecast.
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the
estimated value of the work completed less the cumulative amount certified
42.2 The Engineer shall check the Contractor’s monthly statement within 14 days
and certify the amount to be paid to the Contractor after taking in to account
any credit or debit for the month in question in respect of materials for the
works in the relevant amounts and under conditions set forth in sub-clause
32.3 of the Contract Data (secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of the
items in the Bill of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and
compensation events.
42.6 The Engineer may exclude any item certified in a previous certificate or
reduce the proportion of any item previously certified in any certificate in the
light of later information
43.1 Payments shall be adjusted for deductions for advance payments, retention,
other recoveries in terms of the contract and taxes at source, as applicable
under the law. The Employer shall pay the Contractor the amounts certified
by the Engineer within 28 days of the date of each certificate.
43.2 Payment of GST (prevailing rates) on the amount payable under the contract
to the Contractor will be made by the Employer. Hence, it is the responsibility
of the contractor to pay the GST to the concerned Authority.
43.3 Items of the works for which no rate or price has been entered in will not be
paid by the Employer and shall be deemed covered by other rates and prices
in the Contract.
44. Compensation events
44.1 The following are compensation Events unless they are caused by the
(a) The Employer does not give access to a part of the Site by the site
Possession date stated in Contract data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being
completed beyond the Intended Completion Date then Authority will approve
EOT with eligible contractual price escalation.
45.1 The rates quoted by the Contractor must be inclusive of all taxes prevailing on
due date of bid submission except GST. However, any subsequent changes in
the tax structure by Government after due date of bid submission will be
compensated (+/-) on availability or submission of actual documentation.
Contractor will have to intimate Engineer regarding changes occurred in the
tax structure after bid submission. If the contractor fails to provide such
information and if any financial obligation may arise due to change in tax
structure, same will be recovered from the contractor.
45.2 GST will be paid separately on the bills. Hence, it is the responsibility of the
contractor to pay the GST to the concerned Authority.
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
47. Price Adjustment
47.1 Contract price shall be adjusted for increase or decrease in rates and price of
labour, materials, fuels and lubricants in accordance with the following
principles and procedures and as per formula given in the contract data:
(a) The price adjustment shall apply for the work done from the start date
given in the contract data up to end of the initial intended completion date
or extensions granted by the Engineer and shall not apply to the work
carried out beyond the stipulated time for reasons attributable to the
(b) The price adjustment shall be determined during each month from the
formula given in the contract data.
(c) Following expressions and meanings during to the work done during each
R = Total value of work done during the month. It would include the amount of
secured advance granted, if any, during the month less the amount of secured
advance recovered, if any during the month. It will exclude value for works
executed under variations for which price adjustment will be worked separately
based on the terms mutually agreed.
47.2 To the extent that full compensation for any rise or fall in costs to the
contractor is not covered by the provisions of this or other clause in the
contract, the unit rates and prices included in the contract shall be deemed to
include amounts to cover the contingency of such other rise or fall in costs.
48.1 The Employer shall retain from each payment due to Contractor the
proportion stated in the Contract Data until Completion of the whole of the
48.2 On Completion of the whole of the Works half the total amount retained is
48.2 On Completion of the whole of the Works half the total amount retained is
repaid to the Contractor and half when the Defects Liability Period has passed
and the Engineer has certified that all Defects notified by the Engineer to the
Contractor before the end of this period have been corrected.
48.3 On completion of the whole works, the contractor may substitute retention
money with an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money
deducted by the Employer under the provision of this clause, Employer shall
consider the said request of the Contractor provided that the refund
hereunder shall be made in tranches of not less than 1% (One Percent) of the
Contract Price and Contractor furnishes an irrevocable and unconditional
Bank guarantee for an equal amount substantially in the format of Bank
Guarantee for Performance Guarantee enclosed with SBD and valid up to
day beyond the scheduled / extended Defects Liability Period. On completion
of the whole works, the contractor has however an option to submit a fresh
irrevocable and unconditional Bank Guarantee for an amount equal to 5% of
the total value of work executed substantially in the format of Bank Guarantee
for Performance Guarantee enclosed with SBD and valid up to 60 days beyond
the Defect Liability Period and yet refund the Retention Money Bank
Guarantee submitted for refund of Retention Money.
49. Liquidated Damages
49.1 The Contractor shall pay liquidated damages to the Employer at the rate per
day stated in the Contract Data for each day that the Completion Date is later
than the Intended Completion Date (for the whole works or the milestone as
stated in the contract data). The total amount of liquidated damages shall not
stated in the contract data). The total amount of liquidated damages shall not
exceed the amount defined in the Contract Data. The Employer may deduct
liquidated damages from payment due to the Contractor. Payment of
liquidated damages does not affect the Contractor’s liabilities.
49.2 If the Intended Completion Date is extended after liquidated damages have
been paid, the Engineer shall correct any overpayment of liquidated damages
by the Contractor by adjusting the next payment certificate. The Contractor
shall not be entitled for any interest on the over payment calculated from the
date of payment to the date of repayment.
49.3 If the contractor fails to comply with the time for completion as stipulated in
the tender, then the contractor shall pay to the employer the relevant sum
stated in the Contract Data as Liquidated damages for such default and not as
penalty for everyday or part of day which shall elapse between relevant time
for completion and the date stated in the taking over certificate of the whole
of the works on the relevant section, subject to the limit stated in the contract
The employer may, without prejudice to any other method of recovery
deduct the amount of such damages from any monies due or to become due to
the contractor. The payment or deduction of such damages shall not relieve
the contractor from his obligation to complete the works on from any other of
his obligations and liabilities under the contract.
49.4 If, before the Time for Completion of the whole of the Works or, if applicable
any Section, a Taking Over Certificate has been issued for any part of the
Works or of a Section, the liquidated damages for delay in completion of the
remainder of the Works or of that Section shall, for any period of delay after
the date stated in such Taking-Over-Certificate, and in the absence of
alternative provisions in the Contract, be reduced in the proportion which the
value of the part so certified bears to the value of the whole of the Works or
Section, as applicable. The provisions of this Sub-clause shall only apply to the
rate of liquidated damages and shall not affect the limit thereof.
50.1 If the contractor achieves completion of the whole of the works prior to the
intended Completion Date prescribed in Contract Data the Employer shall pay
to the contractor a sum stated in Contract Data as bonus for every completed
month but subjected to maximum amount as stated in Contract Data;
which shall elapse between the date of completion of all items of works as
stipulated in the contract, including variations ordered by the Engineer and
the time prescribed in Clause
50.2 Bonus shall be paid only to works amounting to above INR 5 crore with time
limit of the works is equal or more than 6 months. The bonus would be paid
% of Time Saved % of Initial Contract Price
entitled for Bonus
Less than 10% 0%
51. Advance Payment.
51.1 The Employer shall make advance payment (not to be paid less than two
installments except in special circumstances for which the reason to be
Recorded in writing) to the Contractor of the amounts stated in the Contract
Date by the date stated in the Contract Date, against provision by the
Contactor of an Unconditional Bank Guarantee in a form and by a bank
acceptable to the Employer in amounts and currencies equal to be at least
110% of the advance payment. The guarantee shall remain effective until the
Advance payment has been repaid, but the amount of the guarantee shall be
progressively reduced by the amounts repaid by the Contractor. The
Mobilization advance would be deemed as interest bearing advance at an
interest rate of 10 % to be compounded, quarterly.
51.2 The Contractor is to use the advance payment only to pay for Equipment,
plant and Mobilization expenses required specifically for execution of the
Works. The Contractor shall demonstrate that advance payment has been
used in this way by supplying copies of invoices or other documents to the
51.3 The advance payment shall be repaid by deduction proportionate amount
from payments otherwise due to the Contractor, following the schedule of
completed percentages of the Works on a payment basis. No account shall be
taken of the advance payment or its repayment in assessing valuations of
work done, variations, price adjustments, Compensation Events, or
Liquidated damages.
52.1 The performance Security (including additional security for unbalanced bids)
shall be provided to the Employer no later than the date specified in the
Letter of Acceptance and shall be issued in an amount and form and by a bank
or surety acceptable to the Employer, and denominated in Indian Rupees. The
performance Security shall be valid until a date 60 days from the certified
date of the project and additional security for unbalanced bids shall be valid
until a date 28 days from the date of issue of the certificate of completion.
Performance and Additional Performance Security shall become
refundable/releasable within 15 days after project certified completion date
subject to fulfillment of contractual obligation and settlement of alldues and
54. Cost of Repairs.
54.1 Loss or damage to the Works or Materials to be incorporated in the Works
between the Start date and the end of Defects Correction periods shall be
remedied by the Contractor at the Contractor’s cost if the loss or damages
arises from the Contractor’s acts or omissions.
E. FINISHING THE CONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate of Completion
of the works and the Engineer will do so upon deciding that the work is
56. Taking Over
56.1 The Employer shall take over the Site and the Works within seven days of the
Engineer issuing a certificate of Completion.
57. Final Account
57.1 The Contractor shall supply to the Engineer a detailed final account of the
total amount that the Contractor considers payable as full and final settlement
total amount that the Contractor considers payable as full and final settlement
of all claims under the Contract for items before the end of the Defects
Liability Period. The Engineer shall issue a Defect Liability Certificate and
certify any final payment that is due to the Contractor within 56 days of
receiving the Contractor's account if it is correct and complete. If it is not, the
Engineer shall issue within 56 days a schedule that states the scope of the
corrections or additions that are necessary. If the Final Account is still
unsatisfactory after it has been resubmitted, the Engineer shall decide on the
amount payable to the Contractor and issue a payment certificate, within
days of receiving the Contractor’s revised account.
57.2 If reversal in characteristic of tender (L1 becoming L2) on account of excesses
and savings in final account is observed, the Engineer/Employer shall be at
liberty to restrict the final payment of BOQ items to the lowest amount
evaluated of the bids considering the final quantities and the rates quoted
including the rebates if any. Payment of variation items shall however be
made at the rates approved by the Employer, within 90 days from the
physical completion of work.
58. Operating and Maintenance Manuals
58.1 If “as built” drawings and/or operating and maintenance manuals are
required, the Contractor shall supply them by the dates stated in the Contract
58.2 If the Contractor does not supply the Drawings and/or manuals by the dates
stated in the Contract data, or they do not receive the Engineer’s approval, the
Engineer shall withhold the amount stated in the Contract Data from
payments due to the Contractor.
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the other party
causes a fundamental breach of the Contract.
59.2 Fundamental breaches of Contract include, but shall not be limited to the
1. The contractor stops work for 28 days when no stoppage of work is
shown on the current programme and the stoppage has not been
authorized by the Engineer
2. The Engineer instructs the Contractor to delay the progress of the Works
and the instructions is not withdrawn within 28 days;
3. The Employer or the Contractor is made bankrupt or goes into liquidation
other than for a reconstructions or amalgamation
4. A payment certified by the Engineer is not paid by the Employer to the
Contractor within 56 days of the date of the Engineer’s certificate
5. The Engineer gives Notice that failure to correct a particular Defect is a
fundamental breach of Contract and the Contractor fails to correct it
within a reasonable period of time determined by the Engineer;
6. The Contractor does not maintain a security which is required;
7. The Contractor has delayed the completion of works by the number of
days for which the maximum amount of liquidated damages can be paid as
defined in the Contract data; and
8. If the Contractor, in the judgment of the Employer has engaged in corrupt
or fraudulent practices in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the
offering, giving, receiving or soliciting of anything of value to influence the
action of a public official in the procurement process or in contract execution.
“Fraudulent practice” means a misrepresentation of facts in order to influence
a procurement process or the execution of a contract to the detriment of the
borrower, and includes collusive practice among Bidders (prior to or after bid
submission) designed to establish bid prices at artificial non-competitive
levels and to deprive the Borrower of the benefits of free and open
59.3 When either party to the Contract gives notice of a breach of contract to the
Engineer for a cause other than those listed under Sub Clause 59.2 above, the
Engineer shall decide whether the breach is fundamental or not.
59.4 Notwithstanding the above, the employer may terminate the Contract for
60. Payment upon Termination
60.1 If the Contract is terminated because of a fundamental breach of Contract by
the Contractor, the Engineer shall issue a Certificate for the value of the work
done less advance payments received up to the date of the issue of the
Certificate, less other recoveries due in terms of the contract, less taxes due to
deducted at source as per applicable law and less the percentage to apply to
the work not completed as indicated in the Contract data. Additional
Liquidated Damages shall not apply. If the total amount due to the Employer
Liquidated Damages shall not apply. If the total amount due to the Employer
exceeds any payment due to the Contractor the difference shall be a debt
payable to the Employer.
60.2 If the Contract is terminated at the Employer’s convenience or because of a
fundamental breach of Contract by the Employer, the Engineer shall issue a
certificate for the value of the work done, the cost of balance material brought
by the contractor and available at site, the reasonable cost of removal of
equipment, repatriation of the Contractor’s personnel employed solely on the
works, and the Contractor’s cost of protecting and securing the Works and
less advance payment received up to the date of the certificate, less other
recoveries due in terms of the contract and less taxes due to deducted at
source as per applicable law.
61.1 All materials on the Site, Plant Equipments, Temporary Works and Works are
deemed to be property of the Employer, if the Contract is terminated because
of a Contractor’s default.
62. Release from Performance
62.1 If the Contract is frustrated by the outbreak of war of by any other event
entirely outside the control of either the Employer or the Contractor the
Engineer shall certify that the Contract has been frustrated. The Contractor
shall make the Site safe and stop work as quickly as possible after receiving
this certificate and shall be paid for all work carried out before receiving it
and for any work carried out afterwards to which commitment was made.
F. SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract, make
his own arrangements for the engagement of all staff and labour, local or
other, and for their payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the
Engineer a return in detail, in such form and at such intervals as the Engineer
may prescribe, showing the staff and the numbers of the several classes of
labour from time to time employed by the Contractor on the site and such
other information as the Engineer may require.
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub-
contractor shall abide at all times by all existing labour enactments and rules
made thereunder, regulations, notification and bye laws of the State or central
Government or local authority and any other labour law (including rules),
regulations, bye laws that may be passed or notifications that may be issued
under any labour law in future either by the State or the Central Government
or the local authority. Salient features of some of the major labour laws that
are applicable to the construction industry are given below. The Contractor
shall keep the Employer indemnified in case any action is taken against the
Employer by the competent authority on account of contravention of any of
the provisions of any Act or rules made thereunder, regulations or
notifications including amendments. If the Employer is caused to pay or
reimburse, such amounts as may be necessary to cause or observe, or for
observance of the provisions stipulated in the notifications/bye
laws/Acts/Rules/regulations including amendments, if any, on the part of the
Contractor, the Engineer/employer shall have the right to deduct any money
due to the Contractor including his amount of performance security. The
Employer/Engineer shall also have the right to recover from the Contractor
any sum required or estimated to be required for making good the loss or
damage suffered by the Employer.
The employees of the Contractor and the Sub-Contractor in no case shall be
treated as the employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE TO
ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS WORK
A) Workmen Compensation Act 1923: - The Act provides for compensation in
case of injury by accident arising out of and during the course of employment.
B) Payment of Gratuity Act. 1972: - Gratuity is payable to an employee under the
Act on satisfaction of certain conditions on separation if an employee has
completed 5 years service or more on death, the rate of 15 days wages for every
completed year of service. The Act is applicable to all establishments employing
10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952: - The Act Provides for
monthly contributions by the employer plus workers @ 10% or 8.33% The
benefits payable under the Act are:
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951: - The Act provides for leave and some other
benefits to women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970: The Act provides for
certain welfare measures to be provided by the Contractor to contract labour and
in case the Contractor fails to provide, the same are required to be provided, by
the Principal Employer by Law. The principal Employer is required to take
Certificate of Registration and the Contractor is required to take license from the
designated Officer. The Act is applicable to the establishments or Contractor of
Principal Employer, if they employ 20 or more contract labour.
F) Minimum Wages Act 1948: - The Employer is supposed to pay not less than the
Minimum Wages fixed by appropriate Government as per provisions of the Act, if
the employment is a scheduled employment. Construction of Building, Roads, and
Runways are scheduled employment.
G) Payments of wages Act 1936: - It lays down as to by what date the wages are to
be paid, when it will be paid and what deductions can be made from the wages
of the workers.
H) Equal remunerations Act 1979: - The Act provides for payment of equal
wages for work of equal nature to Male and Female workers and for not making
discrimination against female employees in the matter of transfer, training and
promotions etc.
I) Payments of Bonus Act 1965: - The Act is applicable to all establishments
employing 20 or more employees. The Act provides for payments of annual
bonus subject to a minimum of 8.33% of wages and maximum of 20 % of wages
to employees drawing Rs. 3500/- per month or less. The bonus to be paid to
employees getting Rs, 2500/- per month or above Rs. 3500/- per month shall be
worked out by taking wages as Rs. 2500/- per month only. The Act does not
apply to certain establishments. The newly set-up establishments are exempted
for five years in certain circumstances. Some of the State Governments have
reduced the employment size from 20 to 10 for the purpose of applicability of
J) Industrial Disputes Act 1947: - The Act lays down the machinery and
procedure for resolutions of Industrial disputes, in what situations a strike or
lock-out becomes illegal and what are the requirements for laying off or
retrenching the employees or closing down the establishment.
K) Industrial employment (standing Orders) Act 1946: - It is applicable to all
establishments employing 100 or more workmen (employment size reduced by
some of the State and Central Government to 50). The Act provides for laying
down rules governing the conditions of employment by the Employer on
matters provided in the Act and get the same certified by the designated
L) Trade Unions Act 1926: - The Act lays the procedure for registration of trade
unions of workmen and employers. The Trade Unions registered under the Act
have given certain immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986: - The Act prohibits
employment of children below 14 years of age in certain occupations and
process and provides for regulation of employment of children in all other
occupations and processes. Employment of Child labour is prohibited in Building
and Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment & Conditions
of service) Act 1979:- The Act is applicable to an establishment which employs
5 or more inter-state migrant workmen through an intermediary (who has
recruited workmen in one state for employment in the establishment situated in
another state).The inter-state migrant workmen, is an establishment to which
this Act becomes applicable, are required to be provided certain facilities such as
housing, medical aid, traveling expenses from home upto the establishment and
O) The Building and Other Construction workers (Regulation of employment
and Conditions of Service) Act 1996 and the Cess Act of 1996: - All the
establishments who carry on any building or other constructions work and
employ 10 or more workers are covered under this Act.
All such establishments are required to pay cess at the rate not exceeding 2% of
the cost of construction as may be modified by the government. The Employer of
the establishment is required to provide safety measures at the Building or
construction work and other welfare measures, such as canteens, First Aid
facilities, Ambulance, Housing accommodations for workers near the workplace
etc. The Employer to whom the Act applies has to obtain a registration
certificate from the Registering Officers appointed by the Government.
P) Factories Act 1948: - The Act lays down the procedure for approval of plans
before setting up a factory, health and safety provisions, welfare provisions,
working hours, annual earned leave and rendering information regarding
accidents or dangerous occurrences to designated authorities. It is applicable to
premises employing 10 persons or more with aid of power or 20 or more
persons without the aid of power engaged in the manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent
authority as per rule. The royalty charges paid shall be borne by the contractor
and shall not be reimbursed by the Employer.
R) Following Pollution control Acts and amendments made thereof from
time to time shall be applicable.
1. Water (Preservation and control of Pollution) Act,
2. Air (Prevention and Control of Pollution Act
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental management
plan for best energy use, waste management, the reduction of pollution as in
EMS (Environmental Management system) ISO-14001-
65. ARBITRATION (GCC Clause 24)
The procedure for arbitration will be as follows: -
24.1 If the Contractor is of the view that a decision taken by the Engineer was either
outside the authority given to the Engineer by the Contract or that the decision
was wrongly taken, the decision shall be referred to Superintending
Engineer of concerned Project Implementation Unit (Higher Authority)
within 14 days of the notification of the Engineer's decision. If the issue is not
resolved, any party can refer the matter for conciliation within 15 days from
the decision given by the #Superintending Engineer of concerned Project
Implementation Unit.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the
decision of the Superintending Engineer of concerned Project
Implementation Unit, both the parties have to refer to the #Chief
Engineer concerned for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied
with the decision of the Superintending Engineer, both parties have to
refer to the #Secretary, Roads & Building Department, Government of
Gujarat for the conciliation process.
If the dispute is not resolved through the conciliation process,
contractor may refer the dispute to Gujarat Public Works Contract Dispute
Arbitration Tribunal. If the Contractor fails to refer a claim / dispute to the
Higher Authority within 14 days of the notification of the Engineer's
decision, the Contractor shall not be entitled to any additional
payment/claim if he doesn’t follow the above sequence in stipulated time.
However, during such period, he would not stop the work in any case.
Clause Reference With
respect To section
Item marked “N/A” do not apply to this Contract.
1. The Employers is [CL.1.1]
Name: Gujarat Maritime Board, Gandhinagar
Address: Sagar Bhawan, Opp. Air Force, Sector 10 A, Gandhinagar-
Name of authorized Representative (will be intimated later)
2. The Engineer is E x e c u t i v e E n g i n e e r ( C i v i l ) , Porbandar
Name of Authorized Representative: …………………………
3. The Defects Liability Period is 36 Months from the certified date of [CL.1.1&33]
completion which should include three monsoons.
4. The Start Date shall be 1st days for the date of issue of the Notice [CL.1.1]
to proceed with the work.
5. The Intended Completion Date for the whole of the works is
08 -Eighth Months after start of work with the following
Milestone dates: [CL.2.2& 49.1]
Physical works to be completed Period from the start
Milestone 1 i.e. 25 % 60 days.
Milestone 2 i.e. 50 % 120 days.
Milestone 3 i.e. 75 % 180 days.
Milestone 4 i.e. 100 % 240 days
6. The Site is located at Okha. [CL.1.1]
7. The name and identification number of the Contract is: [CL.1.1]
The works consist of Providing Pacca Stacking Platform From
Chinage 0 to 80m and 230 to 320m At Port Okha with items as per
B.O.Q. The works shall, inter alia, include the following, as Specified or
Site clearance; setting – out and layout; widening of existing
carriageway and strengthening including camber corrections;
construction of new road/ Parallel service road; bituminous
pavements remodeling/construction of Junctions, intersections,
bus bays, lay-bays; supplying and placing of drainage Channels,
flumes, guard posts and guard other related items;
construction/extension of cross drainage works, bridge,
approaches and other related stones; protective works for
roads/bridge; all aspects of quality assurance of various
components of the works; rectification of The defects in the
completed works during the Defects Liability Period; submission
of “As- built’’ drawings and any other related documents; and
other item of work as may be required to be carried out for
completing the work in accordance with the drawings and the
provisions of the contract and to ensure safety.
(B) Bridge Works
Site clearance; setting out, provision of foundations, piers abutments
and bearing; prestressed/reinforced cement concrete superstructure;
wearing coat, hand railings, expansion joints, approach slabs, drainages
spouts/ downtake pipes, arrangements for fixing light posts, water
mains, utilities etc; provision of suitably designed protective works;
providing wing/return walls; provision of road markings, road signs
etc.; all aspects of quality assurance; clearing the site and handing over
the works on completion; rectification of the defects during the Defects
Liability Period and submission of “As-built” drawings and other
related documents; and other items of work as may be required to be
carried out for completing the works in accordance with the drawings
and the provisions of the contract and to Insure safety
(C) Other Items (Providing Pacca Stacking Platform From Chinage 0 to [CL.1.1]
80m and 230 to 320m At Port Okha)
Any Other Items as required to fulfill all contractual obligations as per the Bid
documents. [CL.2.3(9)]
10. The following documents also form part of the Contract:
As per clause 2-3 - Addendum/ Corrigendum/ undertaking given by
contractor, if any
11. The law which applies to the Contract is the law of Union of India [CL.3.1]
12. The language of the Contract documents is English [CL.3.1]
13. Limit of subcontracting 25% of the Initial Contract Price [CL.7.1]
14. The Schedule of Other Contractors [CL.8]
15. The Schedule of Key Personnel As per Annex – II to Section I [CL.9]
16. The minimum insurance cover for physical property, injury and death [CL13]
is Rs. 5 lakhs per occurrence with the number of occurrences limited
to four. After each occurrence, the contractor will pay an additional
premium necessary to make insurance valid for four occurrences
17. Site Investigation report [CL.14]
18. The Site Possession dates shall be the date of the issuance of work order [CL.21]
19. The period for submission of programme for approval of the engineer [CL. 27.1]
shall be 21 days from the issue of Letter of Acceptance.
20. The period between program updates will be 30 days. [CL.27.3]
21. The amount to be withheld for late submission of an updated [CL. 27.3]
programme shall be Rs. 1 lakhs
22. The following events shall also be Compensation Events [CL. 44]
Substantially adverse ground conditions encountered during the course of
execution of work not provided for in the bidding document.
(i) Removal of underground utilities detected subsequently
(ii) Significant changes in classification of soil requiring
additional mobilization by the contractor, e.g. ordinary soil
to rock excavation,
(iii) Removal of unsuitable material like marsh, debris dumps,
etc. not caused by the contractor.
(iv) Artesian conditions
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(vii)Presence of historical, archeological or religious structures,
monuments interfering with the works
(viii) Restriction of access to ground imposed by civil, judicial, or
military authority
23. The currency of the Contract is Indian Rupees [CL. 46]
24. The formula (e) for adjustment of prices are as under: [CL.47]
If any of the commodities like Cement, Steel or Bitumen are not
found applicable in a work, the weight component of that
commodities {i.e. ‘Cement’ (Pc), ‘Steel’ (Ps) or ‘Bitumen' (Pb) as
indicated in SBD for the purpose of Price Adjustment} shall be
clubbed with the weight component of ‘Other Material’ (Pm), such
that the gross % weight of the components shall remain as 100% .
R = value of work as defined in Clause 47.1 of Conditions of Contract
Adjustment for labour component
(i) Price adjustment for increase or decrease in the cost due to
labour shall be paid in accordance with the following formula:
VL = Increase or decrease in the cost of work during the
month under consideration due to changes in rates for
L0 = The consumer price index for industrial workers for the
State on 28 days preceding the scheduled date of
opening of technical Bids as published by Labour
Bureau, Ministry of Labour, Government of India
Li = The consumer price index for industrial workers for the
State for the month under consideration as published by
the Labour Bureau, Ministry of Labour, Government of
Pl = Percentage of labor component of the work.
Adjustment for cement component.
(ii) Prices adjustment for increase or decrease in the cost of
cement procured by the contractor
Vc = Increase or decrease in the cost of work during the
month under consideration due to changes in rates
C0 = The all India wholesale price index for Ordinary
Portland Cement on 28 days preceding the
scheduled date of opening of technical bid as
published by the Office of the Economic Adviser,
Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Ci = The all India average wholesale price index for Ordinary
Portland Cement for the month under consideration as
published by Office of the Economic Adviser,
Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Pc = Percentage of cement component of the work
Adjustment for steel component
(iii) Price adjustment for increase or decrease in the cost of steel procured by the
contractor shall be paid in accordance with the following formula
Vs= Increase or decrease in the cost of work during the month under consideration due
to changes in the rates for steel
So= The all India wholesale price index for steel (Mild Steel - Long Products
Rebars) on 28 days preceding the date of opening of Bids as published by the
Office of the Economic Adviser, Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Si= The all India average wholesale price index for steel (Mild Steel - Long
Products Rebars) for the month under consideration as published by
Office of the Economic Adviser, Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Ps = Percentage of steel component of the work
Note : For the application of this clause, the index of Mild Steel- Long
products Rebars has been chosen to represent the steel group.
Adjustments of bitumen component
(iv) Price adjustment for increase in the cost of bitumen shall be paid in
accordance with the following formula
Vb = Increase or decrease in the cost of work during the month under
consideration due to changes in rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at the nearest
centre on the day 28 days prior to the scheduled date of opening of
Bi = The official price of bitumen of IOC depot at the nearest center:
For the first 15 days of the month under consideration, the
price declared on the 1st day of that month.
For the remaining days of the month under consideration, the
rate declared on the 16th day of that month.
Pb = Percentage of bitumen component of the work
Adjustment of POL (fuel and lubricant) component
(v) Price adjustment for increase or decrease in cost of POL (fuel and
lubricant) shall be paid in accordance with the following formula
Vf = Increase or decrease in the cost of work during the month under consideration
due to changes in rates for fuel and lubricants.
Fo = The official retail price of High Speed Diesel (HSD) at the existing
consumer pumps of IOC at the nearest centre on the day 28 prior to the date
of opening of Bids.
Fi = The official retail price of HSD at the existing consumer pumps of IOC at
the nearest centre for the 15th day of the month of the under consideration.
Pf = Percentage of fuel and lubricants component of the work
Note: For the application of this clause, the price of High-Speed diesel Oil has been
chosen to represent the fuel and lubricants group.
Adjustment for Construction Machinery
(vi) Price adjustment for increase or decrease in the cost of plant and
Machinery spare procured by the Contractor shall be paid in
accordance with the following formula
Vp= Increase or decrease in the cost of work during the month under consideration
due to changes in rates for plant and machinery spares
P0 = The all India wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the month
under consideration as published Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Pi = The all India average wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the month
under consideration as published Office of the Economic Adviser,
Department for Promotion of Industry and Internal Trade,
Ministry of Commerce & Industry.
Pp = Percentage of plant and machinery spares component of the work.
Note: For the application of this clause, index of Heavy Machinery and parts
has been chosen to represent the Plant and Machinery Spares group
Adjustment of other materials Component
(vii) Price adjustment for increase or decrease in cost of local materials
other than cement, steel, bitumen and POL procured by the contractor
shall be paid in accordance with the following formula
Vm = Increase or decrease in the cost of work during the month under
consideration due to change in rates for local materials other than cement,
steel, bitumen and POL.
M0 = The All Indian wholesale price index (all commodities) on
days preceding the scheduled date of opening of technical Bids, as
published by the Office of the Economic Adviser, Department for
Promotion of Industry and Internal Trade, Ministry of Commerce
Mi= The All India wholesale price index (all commodities) for the
month under consideration as published by the Office of the
Economic Adviser, Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Pm = Percentage of local material components (other than cement, steel,
bitumen and POL) of the work.
The following percentage will govern the price adjustment for the
entire contract:
6. Plant & Machinery Spares Pp .............................. 24.95%
25. The proportion of payments retained (retention money) shall be 6% {CL. 48}
from each bill subject to a maximum of 5% of final contract price.
26. Amount of Liquidated damages for For Whole of work {CL.49}
delay in completion of works (1/2000)th of the Initial contract
price, rounded off to the nearest
Thousand, per day. For sectional
Completion (wherever specified In item
6 of Contract data) (1/2000)th of initial
contract price for #5 km Section,
rounded off to the nearest thousand per
27. Maximum limit of liquidated damages 10 percent of the Initial {CL. 49}
For delay in completion work Contract Price rounded off to
The nearest thousand
28. Amount of Bonus for early completion Amount of bonus for early
completion of work shall be given as
per CL.50 of Section-3
29. Maximum limit of bonus for early 5 percent of the Contract {CL. 50}
Completion of work Price
30. The amount of the advance payment are: {CL. 51 & 52}
#Nature of Advances Amount (Rs.) Conditions to
i Mobilization 10% of the contract On submission of unconditional
Price Bank Guarantee. (to be drawn
before the end of 20% of the
contract period). The contractor may
furnish four bank guarantees of
% of each valid for the full period.
ii Equipment 90% for new and 50% of After equipment is brought to site
depreciated value for old (provided the Engineer is
equipment. Total amount satisfied That the equipment is
equipment. Total amount satisfied That the equipment is
will be subject to a required for performance of the
maximum of 5% of the contract) and on submission of
Contract Price unconditional Bank Guarantee for
amount of advance
iii Secured Deleted
Brought to site
(The advance payment will be paid to the Contractor no later than 28 days after fulfillment
of the above conditions).
31. Repayment of advance payment for mobilization and equipment {CL. 51.3}
The advance loan shall be repaid with percentage deduction from the interim payments
certified by the Engineer under the Contract. Deduction shall commence in the next
Interim Payment Certificate following that in which the
total of all such payments to the Contractor has reached not less than 20 percent of the
Contract Price or 6 (six) months from the date of payment of first installment of advance,
whichever period concludes earlier, and shall be made at the rate of 20 percent
(collectively for both Mobilization Advance and Equipment Advance) of the
amounts of all Interim Payment Certificate until such time as the loan has been repaid,
always provided that the loan shall be completely repaid prior to the expiry of the
original time for completion pursuantto Clause 17 and
33. The securities shall be for the following minimum amounts equivalent {CL. 52}
As a percentage of the Contract Price:
Performance Security for 5 percent of contract price plus Rs. …………….. (to be decided
after evaluation of the bid) as additional security in terms of ITB Clause
The standard form of Performance security acceptable to the Employer shall be an
unconditional Bank Guarantee of the type as presented in Section 8 of the Bidding
34. The Schedule of Operating and maintenance Manuals…..N/A. {CL. 58}
35. The date by which “as– built” drawings (in scale as directed) in 2 sets {CL. 58}
are required within 28 days of the issue of certificate of completion of the whole
or section of the work, as the case may be.
36. The amount to be withheld for failing to supply “as built” drawings {CL. 58} by
the Date required is Rs............ Lakhs. N/A
37. The following events shall also be fundamentals breach of contract: {CL.59.2}
“The Contractor has contravened Sub- clause 7.1 and Clause 9 of GCC”
38. The percentage to apply the value of the work not completed representing {Cl 60}
the Employer’s additional cost for completing the Works shall be 20 per cent.
TECHNICAL SPECIFICATION
Material Specifications
General Specifications
Item Specifications
Cement consumption sheet
Material Specifications
1.1 Water quality for building construction shall conform to IS 456, Clause 5.4. It specifies
the requirements for water used in concrete mixing and curing to ensure structural
integrity and durability.
1.2 General Requirement: Water used for mixing and curing must be clean and free from
harmful amounts of oils, acids, alkalis, salts, sugar, organic materials, or other
substances that may be deleterious to concrete or steel.
1.3 Potability Benchmark: Water suitable for drinking is generally considered acceptable
1.4 Limits on Solids:
Suspended matter: ≤ 2000 mg/l
Inorganic solids: ≤ 3000 mg/l
Organic solids: ≤ 200 mg/l
1.5 pH Value: Should not be less than
1.6 Permissible Limits for Specific Substances:
Sulphates (as SO₄): ≤ 400 mg/l
Chlorides (as Cl):
≤ 2000 mg/l for plain concrete
≤ 500 mg/l for reinforced concrete
Alkalinity: ≤ 120 mg/l (as CaCO₃)
1.7 Field Test (Optional but Recommended)
A simple field test involves casting cubes with the proposed water and comparing their
28-day strength to cubes made with distilled water. The strength should not be less than
90% of the reference.
1.8 IS Codes to be adhered
IS 456 – Code of Practice for Plain and Reinforced Concrete
IS 3025 series – Methods of Sampling and Test (Physical and Chemical) for Water
IS 10500 – Drinking Water Specification (used as a benchmark)
M-2. Building Lime.
2.1 Specification for Building Limes shall conform to IS 712. This standard covers the
classification, physical and chemical requirements, and methods of testing for building
limes used in construction works such as masonry, plastering, whitewashing, and soil
2.2 Classification of Lime
Class Description
A Eminently hydraulic lime used for structural purposes
B Semi-hydraulic lime used for masonry mortars, lime concrete and
plaster undercoat.
C Fatlime used for finishing coat in plastering, whitewashing, composite
mortars, etc, and with addition ofpozzolanie materials for masonry
D Magnesium/dolomitic lime used for finishing coat in plastering, white
E Kankarlimeused for masonry mortars.
2.3 Lime shall be available either in hydrated or quick form, except that of Classes A and E
whichs hall be supplied in hydrated form.
2.4 Physical Requirements as per table 2 of IS
2.5 Chemical Requirements table 1 of IS
Available Lime Content: Measured as the sum of CaO and MgO.
Insoluble Residue: Indicates the presence of non-reactive materials.
Magnesium Oxide (MgO): Should be within permissible limits to avoid unsoundness.
2.6 Slaking and Storage
Quicklime must be slaked before use.
Slaking should be done on impervious platforms or in tanks.
Lime must be stored in dry, weatherproof conditions to prevent premature setting.
2.7 Testing Standards: Testing shall be conducted as per IS 6932 (Parts 1 to 11), which
Chemical composition
2.8 The following field tests for limes are to be carried out:
(1) A very rough idea can be formed about the type of lime by its visual examination
i.e. fat time bears pure white colour, lime in form of porous lumps of dirty while
colour indicates quick lime, and solid lumps are the unburnt lime stone.
(2) Acid tests for determining the carbonate content in lime. Excessive number of
impurities and rough determination of class of lime.
2.9 Storage shall comply with I.S. 712.The slaked lime shall be store in such a manner as to
permit easy access for proper inspection and in a suitable building to protect the lime
from the dampness and to minimize warehouse deterioration. Quicklime deteriorates
rapidly and, therefore should be used as quickly as possible. The slaked lime, if stored,
shall be kept in a weather proof and damp-proof shed with impervious floor and sides
to protect it against rain, moisture, weather and extraneous materials mixing with it.
All lime that has been damaged in any way shall be rejected and all rejected materials
shall be removed from site of work.
3.1 The cement speciifcations shall conform to IS 269 – Ordinary Portland Cement (OPC)
in 33, 43, and 53 grades.
3.2 Chemical Requirements
Property 33 Grade 43 Grade 53 Grade
Ratio of percentage of Min 0.66 Min 0.66 Min
Alumina to that of iron
Insoluble Residue, Max 5.0 Max 5.0 Max
percent by mass, Max
Magnesia (MgO) Max 6.0 Max 6.0 Max
Sulphuric Anhydride Max 3.5 Max 3.5 Max
Loss on Ignition Max 5.0 Max 5.0 Max
Ratio of percentage of 0.66 – 1.02 0.66 – 1.02 0.80 –
lime to percentage of
silica, alumina and
Total Alkalis (Na₂O + Max 0.6 Max 0.6 Max
3.3 Physical Requirements
Property 33 Grade 43 Grade 53 Grade
Fineness (m²/kg) Min 225 Min 225 Min
Setting Time Min 30 min Min 30 min Min 30 min
Setting Time (Final) Max 600 min Max 600 min Max 600 min
Compressive 33 Grade: 33 MPa at 43 Grade: 43 MPa at 53 Grade: 53 MPa at
Strength (MPa) 28 days 28 days 28 days
3.4 Sampling & Testing
Sampling shall be carried out as per IS
Tests shall conform to methods prescribed in relevant IS codes (IS 4031 series).
3.5 Packaging & Marking
Cement shall be packed in PP woven laminated block bottom valve sacks
conforming to IS
Each bag shall be marked with:
Grade designation (33/43/53)
Manufacturer’s name and trademark
BIS Standard Mark (ISI certification)
Cement supplied shall conform to IS 269:2015 and bear the BIS Certification Mark.
Non-conforming material shall be rejected
3.7 Alternatively, as per the direction of Engineer Incharge the cement shall conform to IS
455 – Portland Slag Cement
Portland Slag Cement (PSC) shall be manufactured either by:
Inter-grinding Portland cement clinker, granulated blast furnace slag, and gypsum,
Blending Portland cement and finely ground granulated slag.
Slag content shall be not less than 25% and not more than 65% by mass of PSC.
3.8 Chemical Requirements
Property Limit (%)
Insoluble Residue Max
Magnesia (MgO) Max
Sulphur trioxide (SO₃) Max 2.5–3.0 depending on C3A content
Loss on Ignition Max 5.0 %
Chloride Content Max 0.05%
Slag Homogeneity : ±3% of declared slag addition
3.9 Physical Requirements
Property Requirement (IS 455:2015)
Fineness (m²/kg) Min 225 m3/Kg
Setting Time (Initial) Min 30 min
Setting Time (Final) Max 600 min
Compressive Strength (MPa) >= 16 MPa at 3days, ≥22 at 7 days, ≥33 at
Soundness (Le Chatelier) When tested by 'Le-Chatelier' method and
autoclave test described in IS 4031 (Part 3)
:, unaerated Portland slag cement shall not
have an expansion of more than 10 mm
percent respectively.
Autoclave Expansion Max 0.6%
3.10 Sampling & Testing
Sampling shall be carried out as per IS 455:2015, Clause 5.1.1.
Tests shall conform to methods prescribed in IS 4031 series.
Optional transverse strength test may be agreed between purchaser and
3.11 Packaging & Marking
Cement shall be packed in PP woven laminated block bottom valve sacks
conforming to IS
Each bag shall be marked with:
PSC designation
Manufacturer’s name and trademark
BIS Standard Mark (ISI certification)
3.12 Compliance
Cement supplied shall conform to IS 455:2015 and bear the BIS Certification
Non-conforming material shall be rejected.
M-4. White Portland Cement
4.1 White Portland Cement used in the works shall conform to IS 8042. The cement shall
be supplied in factory-sealed bags bearing the BIS Standard Mark. The contractor shall
produce manufacturer’s test certificates and, if required, samples shall be tested as per
IS 4031 series. Any cement not conforming to the above requirements shall be rejected
M-5. Coloured Cement
5.1 While IS 8042 governs White Portland Cement, which serves as the base for most
coloured cements, coloured cement is typically produced by adding inorganic
pigments (e.g., iron oxides, chromium oxide, cobalt compounds) to white cement. The
following IS codes are relevant:
IS code Title Relevance to Coloured Cement
IS 8042 Specification for White Base material for coloured cement
Portland Cement
IS 2116 Specification for Sand for Relevant for coloured mortar applications
Masonry Mortars
IS 15477 Specification for Applicable for coloured grouts in tiling and
Cementitious Grouts repair
IS 13801 Specification for Covers coloured concrete tiles used in paving
Checkered Cement
IS 12330 Specification for Sulphate Used when coloured cement is needed in
Resisting Portland aggressive environments
IS 269 Specification for Ordinary May be used as base in non-white coloured
Portland Cement cement formulations
5.2 The pigments Pigment Requirements
Shall be inorganic, alkali-resistant, UV-stable, and non-reactive with cement
hydration products.
Common pigments include:
Iron oxide (red, yellow, black)
Chromium oxide (green)
Cobalt compounds (blue)
5.3 Pigments shall conform to relevant chemical and physical standards and be free from
deleterious materials.
5.4 Colourd cement shall be with white or gray Portland cement as specified in the item of
5.5 The Pigments used for colored cement shall be of approved quality and shall not
exceed 10% of cement used in the Mix. The mixture of pigment shall be properly
grounded to have a uniform colour and shade. The pigments shall have such
properties to provide for durability under exposure to sunlight and weather.
5.6 The pigment shall have the property such that it is neither affected by the cement nor
detrimental to it.
M-6. Fine Aggregate
6.1 Fine Aggregate shall conform to IS
shall be natural sand, crushed stone sand, and manufactured sand used as fine
aggregates in concrete.
shall be ensured aggregates are free from deleterious materials such as clay, silt,
organic impurities, and harmful chemicals.
All fine aggregates (coarse sand) used in concrete shall conform to IS 383. Sand shall be
clean, hard, durable, and free from deleterious materials. Grading shall conform to Zone I or
Zone II as specified. The contractor shall provide test certificates and, if required, samples
shall be tested as per IS 2386 series. Non-conforming material shall be rejected
6.2 Grading Requirements for Fine Aggregates: Fine aggregates are classified into four
grading zones (Zone I to Zone IV) based on particle size distribution. (Table 9 of IS
IS Sieve Size Zone I (%) Zone II (%) Zone III (%) Zone IV (%)
6.3 Physical Requirements
Silt Content: Not more than 3% by weight (natural sand). IS 2386 (Part 1)
Clay Lumps: Max 1% by weight. IS 2386 (Part 2)
Organic Impurities: Sand should not contain harmful organic matter.
Specific Gravity: Typically, 2.1-3.2
Moisture Content: To be controlled during batching < 5%
6.4 Deleterious Materials (Limits)
Coal, lignite: Max 1%
Clay lumps: Max 1%
Material finer than 75 µm IS sieve: Max 3% (natural sand), Max 15%
(manufactured sand)
Chlorides and sulphates: Within permissible limits to avoid corrosion of
6.5 Sampling & Testing
Sampling as per IS
Tests as per IS 2386 (Parts I–VIII) for particle size, deleterious substances, and
M-7. Stone Dust or Crushed stone sand
7.1 Crushed stone sand shall conform to IS 383. It shall be obtained by crushing durable
rocks and shall meet the grading requirements for fine aggregates as specified in Table
9 of the standard. The material shall be free from deleterious substances and tested as
per IS 2386 series. Use of crushed stone sand is permitted subject to approval by the
Engineer-in-Charge.
7.2 Technical specifications
Parameter Requirement
Source Crushed hard stone
Grading Zones Must conform to Zones I–IV as per Table
Fineness Modulus Typically, between 2.2 and
Silt Content ≤ 3% by mass
Clay Content Should be minimal; excessive clay is not
Organic Impurities Must be within permissible limits
Soundness Must pass sodium/magnesium sulfate
soundness tests (IS 2386 Part V)
Water Absorption As per IS 2386 Part III
Specific Gravity As per IS 2386 Part III
Bulk Density As per IS 2386 Part III
Moisture Content To be determined before batching <5%
M-8. Stone Grit (Coarse Aggregate upto 10 mm size)
8.1 The specificaions shall conform to IS 383 – Stone Grit (Coarse Aggregate upto 10 mm
size as per table 7 of IS 383)
Shall Covers crushed stone grit, gravel, and other coarse aggregates used in
Shall have nominal sizes: 12.5 mm, 4.75 mm, 2.36 mm.
Shall Ensures aggregates are clean, hard, durable, and free from deleterious
8.2 Grading Requirements (Nominal Sizes) (Table 7 of IS 383)
IS Sieve Size 12.5 mm
percent passing
8.3 Physical Requirements
Aggregate Impact Value: ≤ 30% (general concrete), ≤ 45% (non-wearing
Aggregate Crushing Value: ≤ 30%
Flakiness Index: ≤25%
Specific Gravity: 2.6–2.8 typical (Min-Max: 2.1 to 3.2)
Water Absorption: ≤ 2%.
8.4 Deleterious Materials (Limits)
Coal/lignite: Max 1%
Clay lumps: Max 1%
Material finer than 75 µm IS sieve: Max 3% (natural), Max 15% (manufactured)
Chlorides & sulphates: Within permissible limits to prevent reinforcement
8.5 Sampling & Testing
Sampling as per IS
Testing as per IS 2386 (Parts I–VIII) for particle size, strength, and deleterious
8.6 All stone grit (coarse aggregate) used in concrete shall conform to IS 383:2016.
Aggregates shall be clean, hard, durable, and free from deleterious materials. Grading
shall conform to the nominal sizes specified. The contractor shall provide test
certificates and, if required, samples shall be tested as per IS 2386 series. Non-
conforming material shall be rejected
9.1 Cinder used as fill material or aggregate shall conform to IS 9142 and be free from
harmful organic matter, excessive ash, or unburnt particles. It shall be tested as per IS
2386 series and approved by the Engineer-in-Charge prior to useCinder is well burnt
furnace residue which has been fused or sintered into lumps of varying sizes.
9.2 Cinder used as fine aggregate in lime concrete shall conform to IS 2686. It shall be
classified as Class A, B, or C based on intended use, and tested for grading, sulphate
content, and loss on ignition. The material shall be free from deleterious substances
and approved by the Engineer-in-Charge
9.3 Cinder aggregates shall be well burnt furnace residue obtained from furnace using
only coal as fuel. It shall be clean and free from clay, dirt, wood ash or other
deleterious matter.
9.4 Cinder before usage shall conform to the below listed Indian Standards (IS).
IS 2686: Specifies requirements for cinder to be used as a fine aggregate in lime
IS 9142: Covers artificial lightweight aggregates, including cinder, intended for
manufacturing concrete masonry units
9.5 Sampling & Testing
Sampling as per IS
Testing as per IS 2386 series for particle size distribution, deleterious
substances, and physical properties
Suitable for non-load-bearing walls, partition blocks, and insulating layers.
Not recommended for structural concrete unless specifically approved and
M-10. Lime Mortar
10.1 Lime mortar shall be prepared as per IS 2250 using lime conforming to IS 712 and
sand conforming to IS
10.2 The mortar shall be mixed in the ratio as specified in the tender item specifcations
10.3 Lime mortar shall be mixed mechanically to ensure uniformity. the prepared lime
mortar shall be kept damp and may be used for upto 24 hours if protected from drying.
Workability and consisitency shall conform to IS 2250 requirements.
10.4 Mortar shall always be kept damp, protected from sun and rain till used up, covering
it by tarpaulin or open sheds. Material Storage shall be in accordance with IS:
M-11. Cement Mortar:
11.1 Cement mortar shall be prepared as per IS 2250 using cement conforming to IS
269/1489 and sand conforming to IS
11.2 The mortar shall be mixed in the ratio as specified in the tender item specifcations.
11.3 The mortar shall be mixed mechanically to ensure uniformity. The workability and
consisitency of mortar shall be adhered as per standard industry practice. Mortar shall
be mixed mechanically and used within 4 hours of preparation. Proper curing shall be
ensured for a minimum of 7 days.
11.4 Mortar shall always be kept damp, protected from sun and rain till used up, covering
it by tarpaulin or open sheds. Material Storage shall be in accordance with IS:
M-12. Stone Coarse Aggregate for Nominal Mix Concrete
12.1 The specificaions shall conform to IS 383 (Coarse Aggregate grading as per table 7)
Shall Covers crushed stone and other coarse aggregates used in concrete.
Shall have nominal sizes: 12.5 mm, 16 mm, 20 mm and 40 mm.
Shall Ensures aggregates are clean, hard, durable, and free from deleterious
12.2 Grading Requirements (Nominal Sizes) (Table 7 of IS 383)
IS Sieve Size 40 mm 20 mm 16 mm 12.5 mm
Aggregate (%) Aggregate (%) Aggregate (%) Aggregate (%)
12.3 Physical Requirements
Aggregate Impact Value: ≤ 30% (general concrete), ≤ 45% (non-wearing
Aggregate Crushing Value: ≤ 30%
Combined Elongation & Flakiness Index: ≤40%
Specific Gravity: 2.6–2.8 typical (Min-Max: 2.1 to 3.2)
Water Absorption: ≤ 2%.
12.4 Deleterious Materials (Limits)
Coal/lignite: Max 1%
Clay lumps: Max 1%
Material finer than 75 µm IS sieve: Max 3% (natural), Max 15% (manufactured)
Chlorides & sulphates: Within permissible limits to prevent reinforcement
Note: Prefreably igneous rocks such as granite rocks with accepatable properties as
per IS 383 shall be used as coarse aggregate.
12.5 Sampling & Testing
Sampling as per IS
Testing as per IS 2386 (Parts I–VIII) for particle size, strength, and deleterious
12.6 All stone coarse aggregate used in concrete shall conform to IS 383. Aggregates shall
be clean, hard, durable, and free from deleterious materials. Grading shall conform to
the nominal sizes specified. The contractor shall provide test certificates and, if
required, samples shall be tested as per IS 2386 series. Non-conforming material shall
M-13. Balk Trap or Equivalent Hard Stone Coarse.
13.1 Aggregate for Design Mix Concrete: Coarse aggregate shall be of machine crushed
stone of black trap or equivalent hard stone and be hard strong dense, durable clean
and free from skin and coating likely to prevent proper adhesion of mortar.
13.2 The aggregates shall generally be cubical in shape. Unless special stones of
particular quarries are mentioned, aggregates shall be machine crushed from the best,
black trap or equivalent hard stones as approved. Aggregate shall have no deleterious
reaction with cement.
13.3 The necessary tests as specified in I.S. 383 and I.S. 456 & IS 2386 shall have to be
carried out to ensure the acceptability of the material.
13.4 If aggregate is covered with dust, it shall be washed with water to make it clean.
M-14. Brick Bats Aggregate
14.1 The Material shall conform to IS 3068, Coarse Aggregate for Use in Lime Concrete. It
defines quality parameters for using brick bats as aggregate in lime-based
14.2 The broken brick coarse aggregate shall be prepared from the wellioverburnt bricks
conforming of IS: 1077: to class designation 50 and above It shall be free from
underburnt clay particles, soluble salt and adherent coating of soil or silt.
14.3 Brick aggregate should be handled least number of times before being used in
concrete, as repeated handling could result in breaking up and production of finer
material passing 475 mm IS Sieve. Allowable limit of such material passing 4.75 mm IS
Sieve shall not be more than 5 percent.
14.4 Requirement of Grading for broken brick coarse aggregate.
IS Seive Percent Passing by
Designation mass
14.5 Broken brick coarse aggregate shall also conform to the requirements given in Table
IS Seive Percent Passing by Reference ot method of
Designation mass Test
Bulk density, 1100-1350 IS
Aggregate impact 50 IS
value, percent, Max
Water absorption, 20 Appendix A - IS
Water soluble 1 Appendix B- IS
matter, percent,
M-15. Bricks (Common burnt clay bricks): Common burnt clay bricks must conform to
IS 1077 which specifies their dimensions, physical properties, and quality standards for
use in masonry construction
15.1 Classification: Bricks shall be used based on compressive strength into the
following classes:
The class designation corresponds to the minimum compressive strength of
individual bricks.
15.2 Dimensions and Tolerances
Type Length (mm) Width (mm) Height (mm)
Modular Brick 190 90 90/40
Non-Modular 230 110 70/30
Tolerance: ±3 mm in length, ±1.5 mm in width and height.
15.3 Physical Requirements
Compressive Strength: Must meet the minimum value for the designated class.
Water Absorption: Should not exceed 20% by weight after 24-hour immersion.
Efflorescence: Should be moderate or negligible.
Warping and Cracks: Bricks must be free from visible defects such as cracks,
lime nodules, or warping.
15.4 Workmanship
Bricks shall be uniform in shape, with smooth rectangular faces and sharp
Surface should be clean, free from flaws, and uniform in color.
15.5 Sampling and Testing: Testing shall be done as per IS 3495 Parts 1 to 6, covering:
Compressive strength
Water absorption
Efflorescence
Dimensional tolerance
16.1 The stone shall be of the specified variety such as Granite or any other type of good
hard stones complying the IS
16.2 The stones shall be obtained only from the approved quarry and shall be hard,
sound, durable and free from defects like cavities, cracks, sand holes, flaws, injurious
veins, patches of loose or soft materials etc. and weathered portions and other
structural defects or imperfections tending to affect their soundness and strength.
16.3 Various test on the natural stone shall be conducted for determination of
compressive strength, transverse strength, shear strength, specific gravity, water
absorption, durability etc. requirements specified in IS 1121 (part 1 to 5) IS 1122, IS
1123, IS 1124, IS 1125, IS 1126 shall be followed.
16.4 The edges of the block shall be rough and chisel dressed as prescribed in IS
M-17. Laterite stone
17.1 The latrite stone must conforms to IS 3620 which lays down the requirements for
dimensions, physical properties, workmanship, marking, sampling, and criteria for
conformity of rectangular laterite stone blocks used in the construction of walls and
17.2 General Requirements:
Blocks must be made from natural laterite stone, properly dressed and shaped.
Intended for use in load-bearing and non-load-bearing masonry.
17.3 Dimensions and Tolerances:
Standard sizes are specified in Table 1 of IS
Tolerances in length, width, and height must be within permissible limits.
17.4 Physical Properties:
Compressive strength, density, and water absorption must meet minimum
Blocks should be free from defects like cracks, honeycombing, or laminations.
17.5 Workmanship:
Blocks must be cleanly dressed, with smooth faces and right-angled edges.
Uniformity in shape and size is essential for proper bonding and alignment.
Each block or batch must be marked with the manufacturer’s identification and
date of manufacture.
17.6 Sampling and Conformity:
Sampling procedures and acceptance criteria are defined to ensure compliance
with the standard.
Method of teat for determination of water absorption, apparent specific gravity
and porosity of natural building stones as per IS
Method of tests for determination of strength properties of natural building
stones: Part I Compressive strength as per IS
Method of test for abrasion.
IS 1123- Method of Identification of Natural Building Stones
M-18. Mild Steel Bars
18.1 Mild steel bars reinforcement for R.C.C. work shall conform to I.S. 432 (Part-1) and
shall be of tested quality. It shall also comply with relevant part of I.S.
18.2 Mechanical Properties
Parameters Values
Yield Stress (N/mm²) Min
Ultimate Tensile Strength (N/mm²) Min
Elongation (%) Min
Bend Test No fracture at 180° bend
18.3 Dimensions & Tolerances
Nominal diameters: 6 mm to 50 mm.
Tolerances on diameter, weight, and length as per IS
Bars supplied in straight lengths or coils.
18.4 Sampling & Testing
Sampling as per IS 432 Annex A.
Tests include tensile test, bend test, and chemical analysis.
Testing methods conform to IS 1608 (tensile test) and IS 1599 (bend test).
18.5 All the reinforcement shall be clean and free from dirt, paint, grease, mill scale or
loose or thick rust at the time of placing.
18.6 Marking & Certification
• Each bundle shall be tagged with:
• Manufacturer’s name/trademark
• Bar size and grade
• BIS Standard Mark (ISI certification)
• Only bars bearing the BIS Certification Mark shall be accepted
M-19. Thermo mechanically treated steel (TMT Bars)
Thermo-Mechanically Treated (TMT) bars shall be used for reinforcing concrete
structures in accordance with IS
19.1 Grades and Designation
Grade Yield Strength (N/mm²) Ductility Variant
The suffix ‘D’ denotes enhanced ductility, suitable for seismic and dynamic load
19.2 Chemical composition -carbon content (Maximum %) indicated in table below.
Element Fe Grades Fe-D Grades
The other constituents such as phosphorus & sulphur shall be limited to percentage as
per chemical compostion mentioned in IS
19.3 Mechanical Properties
Yield Strength: As per grade designation.
Ultimate Tensile Strength: Must exceed yield strength by a prescribed margin.
Elongation: Varies by grade and diameter; higher for ductile variants.
Bend and Rebend Tests: Bars must pass without cracking or rupture.
19.4 Surface Characteristics
Bars shall have uniform transverse ribs/lugs for effective bonding with concrete.
Surface must be free from rust, cracks, seams, and other harmful defects.
19.5 Dimensional Tolerances
Mass per meter and nominal diameter shall conform to tolerances specified in IS
19.6 Marking: Each bar or bundle shall be legibly marked with:
Manufacturer’s identification
Valid BIS certifications
Grade designation
Batch number or heat number
19.7 Sampling and Testing: Sampling shall be conducted as per IS
Tests include:
Tensile strength
Bend and rebend
Chemical analysis
M-20. High Tensile Steel Wires
20.1 The high tensile wires for the use in pre-stressed concrete work shall conform to I.S.
20.2 The tensile strength of the high tensile steel bars shall be as specified in the item. In
absence of the given strength, the minimum strength shall be taken as per relevant
provision of I.S 1785. Testing shall be done as per I.S. requirements.
20.3 The high tensile steel shall be free from loose mill scale, rust oil, grease, or any other
harmful matter. Cleaning of steel bars may be carried out by immersion in solvent
solution, wire brushing or passing through a pressure box containing carborundum.
20.4 The high tensile wire shall be obtained from manufactures in coil having diameter
not less than 350 times the diameter of wire itself so that wire springs back straight on
being uncoiled.
M-21. Mild Steel Binding Wire: Shall conform to IS
21.1 Wire shall be supplied in coils or straightened and cut lengths.
21.2 Chemical Composition (Typical Limits)
Manganese (Mn): 0.35 – 0.90%
Sulphur (S): Max 0.055%
Phosphorus (P): Max 0.055%
Copper (Cu): Max 0.30%
21.3 Mechanical Properties
Property Requirement (IS 280)
Tensile Strength (MPa) 320 – 550 (depending on grade)
Yield Stress (MPa) Min
Elongation (%) Min
Bend Test Wire shall withstand bending through 180°
without fracture
21.4 Dimensions & Tolerances
Nominal diameters: As per IS 280 generally rages from 0.2 mm to 10 mm.
Tolerances on diameter: ±0.02 mm to ±0.10 mm depending on size.
Wire shall be uniform, smooth, and free from harmful defects.
21.5 Sampling & Testing
Sampling as per IS
Tests include tensile test, bend test, chemical analysis.
Testing methods conform to IS 1608 (tensile test) and IS 1599 (bend test).
21.6 Marking & Certification
Each coil or bundle shall be marked with:
Manufacturer’s name/trademark
Wire size and grade
BIS Standard Mark (ISI certification)
Only wire bearing the BIS Certification Mark shall be accepted.
M-22. Structural Steel
22.1 The structural steel shall conform to IS 2062 Hot Rolled Medium and High Tensile
Structural Steel
Material Shall be supplied as Covers plates, sections, flats, bars, and rolled
Material Shall be supplied as hot rolled structural steel used in welded, bolted,
or riveted structures.
22.2 Grades & Designations
Grades: E250, E300, E350, E410, E450 (based on minimum yield strength in
Quality Categories:
o A – General quality
o B – Weldable quality
o C – Fire-resistant quality
Delivery Conditions: As rolled, normalized, or thermomechanically treated
22.3 Chemical Composition (Typical Limits)
Carbon: Max 0.23–0.25% (depending on grade)
Manganese: 0.30–1.50%
Sulphur: Max 0.040%
Phosphorus: Max 0.040%
Carbon Equivalent (CE): ≤ 0.42% for weldable grades
22.4 Mechanical Properties
Property E250 Grade E350 Grade E450 Grade
Yield Stress (MPa) Min 250 Min 350 Min
Ultimate Tensile 410–540 490–630 590–770
Elongation (%) Min 23 Min 21 Min
Bend Test Shall withstand Same Same
180° bend without
22.5 Dimensions & Tolerances
Rolled sections, plates, and bars shall conform to IS 1852 for dimensional
Straightness, thickness, and sectional tolerances must be within permissible
22.6 Sampling & Testing
Sampling as per IS 2062 Annexure.
Tests include tensile test, bend test, and chemical analysis.
Testing methods conform to IS 1608 (tensile test) and IS 1599 (bend test).
22.7 Marking & Certification
Each lot shall be accompanied by a manufacturer’s test certificate.
Steel shall bear the BIS Standard Mark (ISI certification).
M-23. Galvanised Iron Sheets
23.1 The galvanised iron sheets shall be plain or corrugated sheets of specified in item.
The G.I. Sheets shall conform to I.S. 277-Galvanized Steel Sheets (Plain and
Corrugated). The sheets shall be undamaged in carriage and handling either by
rubbing off of zinc coating or otherwise they shall have clean and bright surface and
shall be free from dents, holes, rust or white powdery deposit.
23.2 The length and width of G.I. sheet shall be as per tender item specifications.
23.3 Material shall be tested for coating mass, adhesion, and uniformity as per IS
Approval of Engineer-in-Charge is mandatory prior to installation.
M-24. Asbestos Cement Sheets
24.1 Asbestos cement sheets plain, corrugated or semi corrugated shall conform to IS
2096 & I.S. 459- Corrugated and Semi-Corrugated Asbestos Cement Sheets. The
thickness of the sheets shall be as specified in the item. The sheets shall be free from
all defects such as cracks, holes deformities, chipped edges or otherwise damaged.
24.2 Sheets shall be of specified type and thickness, free from cracks, warping, or
delamination. Installation shall follow IS 3007, with proper overlaps, pre-drilled holes,
and secure fixing. All materials shall be tested in accordance with relevant codes and
standard and shall be approved by the Engineer-in-Charge prior to use.
M-25. Mangalore Pattern Roof Tiles
25.1 The Mangalore pattern tiles, shall conform to I.S. 654- Clay Roofing Tiles,
Mangalore Pattern for Class AA or Class 'A' type as specified in item. Samples of the
tiles to be provided shall be got approved from the Engineer-in-charge. Necessary tests
shall be carried out tested in accordance with relevant codes and standards and shall
be approved as directed.
M-26. Shuttering
26.1 Shuttering shall conform to IS 14687 - Guidelines for Falsework for Concrete
26.2 Additionally, IS 456 - Code of Practice for Plain and Reinforced Concrete provide
guidance on formwork removal (deshuttering periods).
26.3 The shuttering shall be either of wooden planking of 30 mm. minimum thickness
with or without steel lining or of steel plates stiffened by steel angles. The shuttering
shall be supported on battens and beams and props of vertical ballies properly cross
braced together so as to make the centering rigid. In places of ballies props, steel
props/ jacks may be used.
26.4 The form work shall be sufficiently strong and shall have camber, so that it assumes
correct shape after deposition of the concrete and shall be able to resist forces caused
by vibration of live load of men working over it and other incidental loads associated
with it. The shuttering shall have smooth and even surface and its joints shall not
permit leakage of cement grout.
26.5 If at any stage of work during or a after placing concrete in the structure, the form
work sags or bulges out beyond the required shape of the structure that compromises
structural integrity then the concrete shall be removed and work redone with fresh
concrete and adequately rigid form work. The complete form work shall be got
inspected by and got approved from the Engineer-in-charge, before the reinforcement
bars are placed in position.
26.6 The props shall consist of bullies having 100 mm. minimum diameter measured at
mix length and 80 mm. at thin end and shall be placed as per design requirement.
These shall rest squarely on wooden sole plates 40 mm laid on sufficiently hard base
or pcc concrete layer if SBC is not available.
26.7 Double wedges shall be provided between the sole plate and the wooden props so as
to facilitate tightening and easing of shuttering without jerking the concrete.
26.8 The timber used in shuttering shall not be so dry as to absorb water from concrete
and swell or bulge nor so green or wet as to shrink after erection. The timber shall be
properly sawn and planed on the sides and surface coming in contact with concrete.
Wooden from work with metal sheet lining or steel plates stiffened by steel angles
shall be permitted.
26.9 As far as practicable, clamps shall be used to hold the forms together and use of nails
and spikes avoided.
26.10The surface of timber shuttering that would come in contact with concrete shall be
well wetted and coated with soap solution before the concreting is done. Alliteratively
coat of raw linseed oil or oil of approved manufacturer may be applied in place of soap
solution. In case of steel shuttering either soap solution or raw linseed oil shall be
applied after thoroughly cleaning the surface. Under no circumstances black o burnt
oil shall be permitted.
26.11The shuttering for beams and slabs shall have camber of 4 mm. per meter (1 in 250)
or as directed by the Engineer-in-charge so as to offset the subsequent deflection. For
cantilevers, the camber at free end shall be 1/50 of the projected length or as directed
by the Engineer-in-charge.
M-27. Expansion joints-Pre moulded filler:
27.1 Polymer-Based, Non-Extruding and Resilient Type Pre-moulded fillers for expansion
joints in buildings are shall be provided conforming to IS 1838 (Part 3)
27.2 Shall be polymer-based preformed fillers used in expansion joints for concrete
structures, including buildings.
Thickness shall be typically 10 mm to 25 mm.
Water absorption ≤ 1% by mass
Be capable of recovering to at least 70% of their original thickness after
compression to 50% of their thickness for 22 hours at 70 ± 1°C.
Exhibit no extrusion or cracking under specified compressive loads.
Be chemically inert, resistant to water absorption, and durable under exposure
to weathering and construction conditions.
Be supplied in standard thicknesses and widths as per project requirements,
with factory-finished edges and surfaces.
The material shall be free from bitumen, tar, or any volatile matter, and shall
not stain or leach into adjacent concrete.
M-28. Expansion joints-Copper strips & hold fasts:
28.1 The item provides for expansion joints in R.C.C. frame structure for internal joint as
well as for exposed joints with the use of necessary copper strip and holdfasts.
28.2 Copper strips used in expansion joints shall be of commercially pure copper,
conforming to IS 191 or equivalent. The strips shall be:
Rolled, annealed, and free from cracks, splits, or other surface defects.
Supplied in standard lengths and widths as per approved drawings, typically
minimum 1.25 mm thick unless otherwise specified.
Smooth, clean, and free from oil, grease, or oxidation before installation.
28.3 Holdfasts for anchoring copper strips shall be:
Fabricated from galvanized mild steel (MS) flats or rods, conforming to IS
Minimum dimensions: 25 mm × 3 mm MS flats or 6 mm diameter MS rods, bent
to shape as per approved detail.
Spaced at intervals not exceeding 300 mm c/c along the length of the copper
Fixed securely into the concrete or masonry using epoxy grout or mechanical
anchoring, ensuring firm embedment and alignment
M-29. Teak Wood: Teakwood for building works shall conform to IS 883 and IS
ensuring durability, dimensional stability, and suitability for structural and joinery
29.1 Applicable Standards:
IS 883– Design of Structural Timber in Buildings – Code of Practice
IS 287 – Recommendation for Maximum Permissible Moisture Content in
IS 4021: Timber Door, Window and Ventilator Frames
IS 1003: Timber Panelled and Glazed Shutters
29.2 Quality and Classification:
Timber shall be of Tectona grandis species (Teak), classified as Grade I or II
Only heartwood shall be used; sapwood is strictly prohibited.
Timber shall be free from knots, cracks, warping, insect damage, and fungal
29.3 Seasoning and Moisture Content:
Teakwood shall be kiln-seasoned or air-seasoned to achieve moisture
content not exceeding:
12% for joinery and furniture
15% for general structural use (As per IS 287)
29.4 Dimensions and Tolerances:
Timber shall be sawn to required dimensions with tolerances of:
±2 mm in thickness and width
All surfaces shall be planed smooth, edges chamfered or rounded as
29.5 Preservation and Treatment:
Concealed or embedded portions shall be treated with non-leachable
preservatives such as:
Copper Chrome Arsenate (CCA)
Boric acid–borax solution
Exposed surfaces shall be primed, polished, or painted as per architectural
finish requirements.
29.6 Workability and Finish:
Teakwood shall be uniform in grain and texture, capable of taking a high-
quality polish.
It shall be dimensionally stable, suitable for machining, carving, and intricate
29.7 Storage and Handling:
Timber shall be stored in a dry, shaded, and ventilated area, stacked on
raised platforms.
Care shall be taken to prevent mechanical damage, moisture absorption, or
M-30. Wooden flush door shutters (Solid core)
30.1 Wooden flush door shutters (solid core type) shall conform to IS 2202 (Part 1)
which specify their construction, materials, dimensions, and performance
30.2 Construction Requirements
Core Type: Solid core made from blockboard or particleboard
Face Panels: Plywood or similar approved material
Stiles and Rails: Hardwood or other suitable timber, properly seasoned
Bonding: Synthetic resin adhesive conforming to IS
Thickness: Commonly 25 mm, 30 mm, or 35 mm (Thickness required Shall
confirm to Item Specifications in tender)
30.3 Dimensional Tolerances
Thickness: ±1 mm
Width and Height: ±3 mm
Squareness: Diagonal difference ≤ 3 mm
30.4 Performance Tests (as per IS 2202)
End Immersion Test: Resistance to water absorption
Knife Test: Adhesion of face panel
Screw Withdrawal Test: Strength of core and bonding
Impact Indentation Test: Surface durability
Edge Loading Test: Structural integrity under load
30.5 Marking and Certification
Marking: Each shutter must bear manufacturer’s name, ISI mark, and size
Certification: Valid BIS certification
M-31. Aluminum doors, windows, ventilators
31.1 The Material shall conform to IS 1948 - Specification for aluminium doors, windows
and ventilators.
31.2 Aluminum alloy used in the manufacture of extruded window sections shall conform
to I.S. designation HEA-WP of I.S733- Wrought Aluminium and Aluminium Alloy Bars,
Rods and Sections (for General Engineering Purposes) and also to I.S. Designation
WVG-WP of I.S. 1285- Indian Standard for Wrought Aluminium and Aluminium Alloys
– Extruded Round Tube and Hollow Sections for General Engineering Purposes. The
Section shall be as specified in the drawing and design. The fabrication shall be done as
directed by Engineer In charge.
31.3 The hinges shall be cast or extruded aluminum hinge of same type as in window but
31.4 The hinges shall normally be of 50 mm. projecting type. Non-projecting type of
hinges may also be used if directed. The handles of door shall be of specified design. A
suitable lock for the door operatable either from outside or inside shall be provided. In
double shutter door, the first closing shutter shall have concealed aluminum alloy bolt
at top and bottom.
M-32. Rolling Shutters: Rolling shutters and grills shall conform to IS 6248, ensuring
standardized design, materials, fabrication, and installation for secure and durable
M-33. Collapsible Steel Gate: Collapsible steel gates shall be fabricated and installed in
accordance with IS 10521. Gates shall be made from mild steel channels and flats, with
interlaced cross members, top and bottom guide rails, and smooth-operating rollers or
pulleys. All fittings including locking arrangements, stoppers, and handles shall be of
approved design. The entire assembly shall be corrosion-protected by painting or
galvanizing, as specified in the item specification of tender document.
M-34. Welded Steel Wire Fabric:
34.1 Material shall conform to IS 4948– Welded Steel Wire Fabric for General Use.
34.2 Material shall be welded steel wire fabric manufactured from mild steel or medium
tensile steel wires.
34.3 Materials: Wires shall conform to:
IS 432 (Part 1) Mild steel and medium tensile steel bars and hard-drawn steel
wire for concrete reinforcement.
IS 6528 Stainless steel wire (included in this revision).
Wire diameter range: 2 mm to 10 mm.
34.4 Fabric Construction
Wires arranged in rectangular or square grids.
Welded at all intersections by electric resistance welding.
Mesh sizes typically range from 25 mm × 25 mm to 150 mm × 150 mm.
Supplied in rolls or flat panels.
34.5 Mechanical Properties
Tensile Strength: As per IS 432 requirements.
Weld Shear Strength: Each welded joint must withstand specified shear load
without failure.
Elongation: Minimum 8–12% depending on wire diameter.
34.6 Dimensions & Tolerances
Wire Diameter Tolerance: ±0.05 mm to ±0.10 mm.
Mesh Size Tolerance: ±2 mm.
Overall Length/Width Tolerance: ±10 mm.
34.7 Sampling & Testing
Sampling procedure defined in IS 4948 Annexure.
Tests include:
Wire tensile test (IS 1608)
Weld shear test
Bend test (IS 1599)
Dimensional checks
34.8 Marking & Certification
Each roll/panel shall be marked with:
Manufacturer’s name/trademark
Wire diameter and mesh size
BIS Standard Mark (ISI certification)
Only products bearing the BIS Certification Mark shall be accepted
M-35. Expanded Metal Sheets:
35.1 The Material shall conform to IS 412:1975 with following properties:
Material: MS, GI, or Aluminum
Mesh Type: Regular or flattened
Dimensions: Mesh 10×25 mm to 25×50 mm; Sheet 2.5×1.2 m
Thickness: 1–3 mm unless otherwise specified
Finish: Uncoated, galvanized (IS 4759), or painted
Use: Plaster reinforcement, fencing, walkways
Fixing: Clamps, bolts, or welding
Inspection: Visual, dimensional, coating thickness
35.2 The expanded metal sheets shall be free from flaws, joints, broken strands,
laminations and other harmful surface.
35.3 Expanded metal in panels shall be in one whole piece panel each as far as stock size
permit. The expanded metal sheets shall be coated with suitable protective coating to
prevent corrosion.
M-36. Mild Steel Wire (Wire Gauze Jali):
36.1 Wire mesh/jali specifications shall conform to IS 1566 (Hard-Drawn Steel Wire
Fabric for Concrete Reinforcement) and IS 16011 (Welded Steel Wire Fabric for
Fencing). These standards define wire gauge (diameter), mesh size, tensile strength,
coating, and permissible tolerances for jali/fencing applications. Other relevant codes
shall be refered for mild steel material and coating. IS 280 – Mild steel wire for general
engineering purposes. IS 4826 – Hot-dip galvanized coatings on round steel wires
36.3 Wire Gauge / Diameter
Common gauges: 8 to 14 gauge (≈ 4.0 mm to 2.0 mm diameter)
Example: GI chain link jali often uses 10-gauge wire (≈ 3.0 mm)
Tolerance: ±0.05 mm on diameter depending on wire size
Chain link / welded jali: 25 mm × 25 mm to 75 mm × 75 mm
Reinforcement mesh: 50 mm × 50 mm to 150 mm × 150 mm
36.5 Material & Finish
Mild Steel (MS), Galvanized Iron (GI), or Stainless Steel
Galvanization as per IS 4826 or IS 4759 (minimum coating thickness 40–70
microns depending on exposure)
Painted or PVC-coated options for fencing
36.6 Mechanical Properties
Tensile strength: 350–550 MPa (depending on wire grade)
Elongation: Minimum 8–12%
36.7 Inspection & Testing
Visual inspection for uniform mesh and coating
Dimensional checks for wire diameter and mesh size
Coating thickness test (galvanized or PVC-coated)
Tensile test on sample wires
37.1 plywood specifications must conform with relevant IS codes such as IS 303 (for MR
and BWR grades) and IS 710 (for marine grade). Structural plywood should conform IS
37.2 IS Codes and Grades of Plywood
Grade IS Code Application
MR (Moisture Resistant) IS 303 Interior furniture, dry areas
BWR (Boiling Water IS 303 Kitchen cabinets, semi-
Resistant) moist areas
Marine Grade IS 710 Exterior, high humidity,
Structural Grade IS 10701 Load-bearing construction
Fire Retardant IS 5509 Public buildings, fire-
sensitive zones
Decorative Veneered IS 1328 Interior paneling, furniture
37.3 Technical Specifications
37.3.1 General Requirements:
Size: 2440 mm × 1220 mm (8' × 4') standard; tolerance ±6 mm length,
Thickness: 6 mm to 25 mm;
Tolerance shall be typically +-0.2mm to +-0.60.
Moisture Content: 5–12%
Face Veneer: Uniform, free from splits, knots, overlaps
Core Veneer: Evenly distributed, bonded with appropriate adhesive
37.3.2 Adhesive Type: IS
MR Grade: Urea Formaldehyde
BWR/Marine Grade: Phenol Formaldehyde (PF resin)
37.4 Testing Requirements (as per IS 303/710/10701)
Modulus of Rupture (MOR)
Modulus of Elasticity (MOE)
Water resistance (72 hours boiling for marine grade)
Adhesion of plies
Preservative treatment (IS 12120 if specified)
Dimensional Stability
Manufacturer’s name or trademark
IS code and grade
Batch number and year of manufacture
38.1 General purpose glass used in architectural and building applications must comply
with IS 2553 (Part 1) It specifies safety glass standards including toughened and
laminated types.
38.2 IS Code Reference
Glass Type IS Code Application
Toughened (Tempered) IS 2553 (Part 1) Doors, windows, partitions,
Laminated Safety Glass IS 2553 (Part 1) Skylights, overhead glazing,
Float Glass IS 14900 General glazing, mirrors,
Wired Glass IS 5437 Fire-resistant glazing
38.3 Technical Specifications (IS 2553 Part 1)
38.3.1 General Requirements:
Thickness Range: 4 mm to 12 mm (nominal)
Size Tolerances: ±1 mm in thickness; ±2 mm in length/width
Edge Finish: Smooth, arrised or polished edges
Optical Quality: Free from bubbles, scratches, distortions
38.3.2 Toughened Glass:
Heat-treated to increase strength (4–5× stronger than annealed)
Breaks into small blunt fragments for safety
Minimum fragmentation count: 40 pieces in 50 mm × 50 mm area
38.3.3 Laminated Glass
Two or more layers bonded with PVB interlayer
Retains integrity upon breakage
Impact resistance and sound insulation properties
38.4 Testing Requirements:
Fragmentation test (for toughened)
Impact resistance (for laminated)
Light transmission and distortion
Thermal shock resistance
38.5 Sampling: One test per glass as directed by Engineer Incharge.
Manufacturer’s name or trademark
IS code and type of glass
Date or batch number
Safety symbol (if applicable)
38.7 Sheet glass shall conform to 2835 Specification for Flat Transparent Sheet Glass,
which outlines its physical properties, tolerances, and quality standards for general
glazing applications.
38.7.1 Technical specifications
Attribute Specification
Applicable IS Code IS
Thickness Range 2 mm to 6 mm (nominal)
Standard Sizes 610 × 610 mm to 2440 × 1220 mm (custom
Tolerance ±0.2 mm in thickness; ±2 mm in
Surface Quality Free from bubbles, scratches, waviness, and
other visual defects
Edge Finish Clean cut, arrised or ground edges
Optical Clarity Uniform transparency, no distortion
Packing & Marking Manufacturer’s name, IS code, batch
38.7.2 Key Technical Requirements
Flatness: Must conform to specified deviation limits to ensure proper glazing.
Light Transmission: Should meet minimum luminous transmittance values for
Workability: Suitable for cutting, edging, and installation in frames or sashes.
Applications: Windows, doors, partitions, showcases, and general architectural
38.8 All glass shall be of the best quality, free from specks, bubbles, smokes, veins, air
holes blisters and other defects. The kind of glass to be used shall be mentioned in the
item or specification or in the special provisions or as shown in detailed drawings.
Thickness of glass panes shall be uniform.
M-39. Acrylic Sheets:
39.1 The material shall conform to IS
39.2 Acrylic sheet shall be of thickness as specified in the item and of a specified shape
and size as the case may be. Panels may be lat or curved. It should be light in weight. It
shall be colourless or coloured or opaque as specified in the item. Colourless sheet
shall be as transparent as the finest optical glass. Its light transmission rate shall be
about 95%. Transparency shall not be affected for the sheets of larger thickness. It
shall be extremely resistant to sunlight, weather and low temperatures. It shall not
show any significant yellowing or change in physical properties or loss of light
transmission over a longer period of use. The sheet shall be impact resistant also.
Sheets should be available in complete range of standard transparent, translucent and
opaque colours. Sheets shall be of such quality that they can be cut bent and jointed as
desired. Solution for the joints shall be used as per the requirement of manufacturer.
M-40. Particle board:
Medium-density particle boards shall conform to IS 3087. Boards shall be manufactured
from wood-based lignocellulosic material bonded with synthetic resin. Physical and
mechanical properties including density, moisture content, water absorption, and strength
shall meet the prescribed limits for Grade I/II as specified. Each board shall bear
manufacturer’s marking indicating IS code, grade, batch number, and date of manufacture.
Installation shall follow standard carpentry practices ensuring proper edge support and
40.1 Dimensions and Tolerances
Thickness Range: Typically, 6 mm to 25 mm
Length and Width: Standard sizes like 2440 mm × 1220 mm
Thickness: ±0.5 mm
Length/Width: ±5 mm
40.2 Physical Properties
Density: Medium density range, typically 600–800 kg/m³
Moisture Content: Should be within 5–13%
Screw Withdrawal Strength: Minimum values specified for face and edge
Water Absorption and Swelling: Limits defined for 2-hour and 24-hour immersion
40.3 Adhesive Requirements
Adhesives used must conform to IS 848 (Synthetic Resin Adhesives for Plywood)
40.4 Testing and Inspection
Tests Include:
Moisture content
Thickness swelling
Screw withdrawal strength
Sample Size: As per Annex A of the BIS product manual
Inspection Scheme: Defined under Scheme-I of BIS Conformity Assessment
40.5 Marking and Labeling
Boards must be marked with:
Manufacturer’s name or trademark
Thickness and grade
IS 3087 references
BIS Standard Mark (if certified)
M-41. Expanded polystyrene of framed styroper slabs:
41.1 Expanded polystyrene (EPS) slabs for framed construction applications shall
comform with IS 4671– Specification for Expanded Polystyrene for Thermal Insulation
Purposes. This standard defines the physical, thermal, and mechanical properties of
EPS used in building envelopes, insulation, and prefabricated panels
41.2 Expanded polystyrene slabs shall conform to IS 4671. Slabs shall be of nominal
density 20–30 kg/m³, with minimum compressive strength of 0.9–1.4 kg/cm² at 10%
deformation. Thermal conductivity shall not exceed 0.035 W/m·K. Moisture
absorption shall be ≤1% by volume. Slabs shall be uniform, free from cracks, voids, and
foreign matter. Each slab shall bear manufacturer’s marking indicating IS code,
density, batch number, and date of manufacture. Installation shall follow standard
framed panel procedures ensuring proper edge support and thermal continuity.
M-42. Resin Bonded Fiberglass (Glass Wool)
42.1 IS 8183 specifies the requirements for resin bonded mineral wool (including
fiberglass) used for thermal and acoustic insulation. It covers physical properties,
performance criteria, and marking requirements
42.2 Resin bonded mineral wool slabs shall conform to IS 8183. Material shall be non-
combustible, moisture resistant, and suitable for thermal and acoustic insulation.
Nominal density shall be 24–48 kg/m³, with thermal conductivity not exceeding
W/m·K. Slabs shall be uniform, free from voids, and optionally faced with aluminum
foil or glass tissue as specified. Each slab shall bear manufacturer’s marking indicating
IS code, density, batch number, and date of manufacture. Installation shall follow
standard framed panel procedures ensuring proper edge support and insulation
42.3 IS 3144 1specifies the methods of test for mineral wool thermal insulation
42.4 Insulation wool blanket shall be with following coverings on one or both sides as
(1) Bituminised Hessian Kraft paper suitable for use in position where moisture has
to be excluded.
(2) Hessian cloth or Kraft paper for keeping out dust.
(3) G.I. wire netting, suitable for surfaces to be plastered over.
M-43. Fixtures and fastenings:
The fixtures and fastenings, that is, butt, hinges, tee and strap hinges, sliding door
bolts, tower bolts, door latch, bathroom latch, handles, door stoppers, casement
window fasteners, casement stays and ventilators catch shall be made of the
metal as specified in the item or its specifications.
They shall be of iron, brass, aluminum, chromium plated iron, chromium plated
brass, copper oxidized iron, copper oxidize brass or anodized aluminum as
The fixtures shall be heavy, medium or light type. The fixtures and fastenings
shall be smooth finished and shall be such as will ensure ease of operation.
The samples of fixtures and fastenings shall be got approved as regards quality
and shape before providing them in position.
Brass and anodized aluminum fixtures and fastenings shall be bright finished.
43.2 Holdfasts: Holdfasts shall conform to IS 7196. Each holdfast shall be fabricated
from mild steel flats of size 30 mm × 6 mm, bent into Z-shape or L-shape as specified.
Minimum length shall be 250 mm, with anchoring end embedded in masonry or
concrete. Each door frame shall be fixed using not less than three holdfasts per side,
and each window frame with two per side. Surface finish shall be black or galvanized
as per site exposure. Installation shall ensure firm anchorage and alignment.
43.3 Butt hinges: Butt hinges shall conform to IS 12817 Hinges shall be made of
stainless-steel grade AISI 304 or 316 as per IS 6911. Each hinge shall be of size
specified in the BOQ, with fixed or removable pin as required. Hinges shall be
corrosion-resistant, capable of withstanding 50,000 operational cycles, and free from
burrs or surface defects. Each hinge shall bear manufacturer’s marking indicating IS
code, grade, size, and batch number.
43.4 Siding door bolts (Aldrops): Sliding door bolts (aldrops) shall conform to IS
for non-ferrous types and IS 15834 for stainless steel types. Each aldrop shall be of
size and material as specified in the BOQ, with provision for padlocking. Finish shall be
polished or satin as per site requirements. Aldrops shall be corrosion-resistant,
mechanically robust, and capable of enduring 50,000 operational cycles. Each unit
shall bear manufacturer’s marking indicating IS code, grade, and batch number.
43.5 Tower bolts (Barrel Type): Tower bolts (barrel type) shall conform to IS
Each bolt shall be made of stainless-steel grade AISI 304 or 316, with size and finish as
specified in the BOQ. Bolt diameter and base plate thickness shall meet dimensional
requirements of the standard. Bolts shall be corrosion-resistant and capable of
enduring a minimum of 50,000 operational cycles. Each unit shall bear manufacturer’s
marking indicating IS code, grade, size, and batch number.
43.6 Door latch: Door latches shall conform to IS 16015. Latches shall be of mortise type,
mechanically operated, and made from stainless steel, brass, or zinc alloy as specified.
Each latch shall be capable of withstanding a minimum of 200,000 operating cycles
and shall pass a 96-hour salt spray test for corrosion resistance. Latch bolts shall be
spring-loaded and operable by lever handle or knob. Each unit shall bear
manufacturer’s marking indicating IS code, grade, and batch number
43.7 Bathroom Latch: Bathroom latches shall conform to IS 16015 Each latch shall be of
mortise type, mechanically operated, and made from stainless steel, brass, or zinc alloy
as specified. Latch shall include privacy thumb turn and emergency release. It shall
withstand a minimum of 200,000 operating cycles and pass a 96-hour salt spray test.
Each unit shall bear manufacturer’s marking indicating IS code, grade, and batch
43.8 Handle: Door handles shall conform to IS 208. Handles shall be made of stainless
steel, brass, or aluminum alloy as specified, with finish suitable for the intended
application. Each handle shall be of size and type as per BOQ, and capable of
withstanding a minimum of 50,000 operating cycles. Handles shall be corrosion-
resistant and mechanically robust. Each unit shall bear manufacturer’s marking
indicating IS code, grade, size, and batch number.
43.9 Door Stoppers: Door stopper shall conform to IS 1823 : Door stoppers shall be of
floor-mounted or wall-mounted type as specified, fabricated from stainless steel,
brass, or aluminum alloy with rubber tip. Each stopper shall be corrosion-resistant
and capable of absorbing door impact without deformation. Finish shall be satin,
polished, or chrome-plated as per BOQ. Mounting shall be secure using appropriate
fasteners. Manufacturer’s identification and batch number shall be provided where
43.10Door Catch: Door catches shall be of magnetic, roller, or ball type as specified in the
BOQ. They shall be made from brass, stainless steel, or aluminum alloy conforming to
IS 410, IS 6911, or IS 617 respectively. Finish shall be satin, polished, or chrome-
plated. Each catch shall be corrosion-resistant and capable of withstanding a minimum
of 50,000 operational cycles. Mounting shall be secure using appropriate fasteners.
Manufacturer’s identification and batch number shall be provided where applicable
43.11Wooden Door Stop with hinges: Wooden door stops with hinges shall be
fabricated from seasoned hardwood conforming to IS 4021 and installed in accordance
with IS 4913. Each stop shall be of appropriate dimensions to suit door width and shall
be hinged using stainless steel butt hinges conforming to IS 12817. Finish shall be
painted, varnished, or polished as specified. Installation shall ensure smooth operation
and effective door restraint without obstruction
43.12Casement window fastener: Casement window fasteners shall be of handle-
operated type suitable for inward or outward opening windows. Material shall be
brass, aluminum alloy, or mild steel conforming to IS 410, IS 617, or IS
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01) Technical Bid_PSP Okha.pdf
02) Item specification for pacca staking plateform new.pdf
03) BOQ_PSP Okha.pdf
04) Lay out_Pacca stacking platform okha.pdf
05) SECTION 1.pdf
06) Section 2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .