Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,100
Closing Date
27 Mar 2023, 4:00 pmClosed
Krishnarayapuram Block Development Officer (B,P)
Krishnarayapuram Block Development Office
CONSTRUCTION OF MINI COMMUNITY HALL AT ALANGARIPATTY H/O Sivayam Panchayat
2023_RDTN_296784_1
CONSTRUCTION OF MINI COMMUNITY HALL AT ALANGARIPAT
Open Tender
Civil Works - Buildings
Item Rate
90 days
Krishnarayapuram Block (B.P)
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,100
Yes
28 Mar 2023
22 Mar 2023
27 Mar 2023
22 Mar 2023
27 Mar 2023
22 Mar 2023
Amount
Name of the Work : CONSTRUCTION OF MINI COMMUNITY HALL @ ALANGARIPATTY H/O Sivayam Panchayat. .
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm iss HBG metal for foundation & flooring including labour charges etc., complete
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly
Brick work in cm 1:5 mix using country brick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete with same morter etc., completed
Supplying and erecting centering for sides and soffits including supports and strutting upto 3.29m. Ht for plain surfaces including struting etc., complete.
BELOW GROUND LEVEL
ABOVE GROUND LEVEL
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
RCC 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC itemsincluding cost and conveyance etc., etc., complete,
Plastering with cement Morter 1:5 12mm thick in all floors including curing etc., complete complying with standard specification and as directed.rials and labour charges etc.,
Plastering with cement Morter 1:3 10mm thick in all floors including curing etc., complete complying with standard specification and as directed.rials and labour charges etc.,
Paving the Floor with Ceramic Tiles for Vtrified Tiles of size 0.60x 0.60 m in cm 1:3 mix including all cost of materials and all labour charegs etc complete
Dadooling the wall Tiles of size 150 x 150 m in cm 1:2 mix including all cost of materials and all labour charegs etc complete
Weathering course concrete using brick jelly lime concrete including ncost and conveyance of all materials and and all labour charges etc complete.
Finishing the top of roof with one course machine pressed tiles including curing etc., complete complying with standard specification and as directed.rials and labour charges etc.,
Distember two coats using oil bound Distember of approved colour over old including ncost and conveyance of all materials and and all labour charges etc complete.
Painting two coats of approved emulsion paint over one priming coat of old wall surface including cleaning preparing the surface and curing etc complete.
Painting two coats of new iron works such as steel doors, Window, Ventilators,Window bars ,Balustrdes etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coat etc., complete complying with standard specifications etc.,
Supply of steel Door (0.90x 2.10 )
Supply of steel Door (0.75x 1.80 )
Supply of steel window ( 1.20 x 1.30 )
Supplying & Fixing in position of Indian type Water closet 580x440mm of approved Quality etc
Providing the Rain water Down fall 110 PVC Pipe etc.,
Provison for Following Electrification arrangements
Open PVC Light& Fan Point ( SD NO 17)
Open PVC Plugh Point ( SD NO 36 )
Tube Light Fittings ( SD NO 87 )
Ceiling Fan Fittings ( SD NO 106 )
Service wire ( SD NO 64 )
25 mm Dia Service pipe ( SD NO 69)
Main switch
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K DHANASEKARAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .