Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-Finance | ₹11.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹12.7 L+₹1.0 L (8.66%)Rejected-Finance | ₹12.7 L+₹1.0 L (8.66%) | L2 | Rejected-Finance L2 |
| 3 | L2₹12.7 L+₹1.0 L (8.66%)Rejected-Finance | ₹12.7 L+₹1.0 L (8.66%) | L2 | Rejected-Finance L2 |
| 4 | L3₹13.1 L+₹1.3 L (11.4%)Rejected-Finance | ₹13.1 L+₹1.3 L (11.4%) | L3 | Rejected-Finance L3 |
| 5 | L4₹13.1 L+₹1.3 L (11.4%)Rejected-Finance | ₹13.1 L+₹1.3 L (11.4%) | L4 | Rejected-Finance L4 |
Tender Value
₹15.9 L
EMD Value
₹31,844
Closing Date
18 Aug 2026, 3:00 pmClosed
Executive Engineer,KID
Office of the Executive Engineer Kakdwip Irrigation Division Postal address Kakdwip, South 24 Parganas, Pin-743347
Emergent restoration of Sundarban Embankment damaged due to full Moon Kotal on and from 30.07.2026 to 03.08.2026 in between Ch.27.050 Km to Ch.27.160 Km for a length of 110 M facing river Muriganga left bank at Mouza-Rajnagar ,Block-Namkhana
2026_IWD_1038059_16
WBIW/EE/KIDIVISION/e-SNIT- 09 (e)/2026-27
Open Tender
CIVIL WORKS
Percentage
21 days
Namkhana
Please refer Tender documents.
6 documents required · 6 mandatory
₹31,844
Yes
3 Sept 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. To be measured at mid length). | - | Mtr. | 34.56 | - |
| 2 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.
(a) Where boats are not necessary. | - | Mtr. | 13.11 | - |
| 3 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.
(ii) 12.50 cm av. Diameter | - | Mtr. | 172.81 | - |
| 4 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
(ii) 12.50 cm av. diameter | - | Mtr. | 109.65 | - |
| 5 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.
(a) Width of thinner end above 10 cm. and less than 15 cm.
(i) Jhaw / Eucalyptus. | - | Mtr. | 123.95 | - |
| 6 | Supplying to site empty cement polythene bags (capacity50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | - | Each | 7.15 | - |
| 7 | Labour charges for filling empty cement gunny bag / polythene bag (capacity50kg) with all kinds of earth (wetordry), sand or agreegates (stone/brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking with in a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). | - | Each | 8.34 | - |
| 8 | Dumping in position earth /sand filled gunny / poly bags (capacity50kg) within a lead of 30 metre inclusive of all lifts. | - | Each | 3.58 | - |
| 9 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete | - | Each | 139.44 | - |
| 10 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3.
Size of Nylon crate is 1metre X 1metre X 1metre...(a) Where boats are not necessary. | - | Each | 498.17 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
Tendernotice_2.pdf
PDF • 1.03 MB
BOQ_2550109.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .