| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | ₹3.6 L Quoted ₹3.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.2 L+₹18,327 (6.01%)Rejected-Finance RIVER SIDE BHURKUNDA RAMGARH JHARKHAND | RAMGARH | RAMGARH | JHARKHAND | ₹3.2 L+₹18,327 (6.01%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical NAI SARAI RAMGARH CANTT DISTT RAMGARH PIN 829122 | RAMGARH | JHARKHAND | 829122 | - | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | M/S NEW ENTERPRISES L1 | M/S DK ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | A. 235KWMotor3.3KV Cost of Rotor Bar(13Nos.X2.5Kg) | 32.5 | Kg. | 1,286 ₹41,795 Lowest | 1,350 ₹43,875 |
| 2.00 | Brazing Rod L&T 1805 | 2 | Kg. | 8,720 ₹17,440 Lowest | 8,810 ₹17,620 |
| 3.00 | Slot Wedge | 35 | No. | 337 ₹11,795 Lowest | 400 ₹14,000 |
| 4.00 | Installation Charge | 1 | No. | 10,655 ₹10,655 Lowest | 11,324 ₹11,324 |
| 5.00 | Other Overhead and expenses | 1 | No. | 8,169 ₹8,169 Lowest | 8,681 ₹8,681 |
| 6.00 | B. 200KWMotor3.3KV Cost of connecting Lead Cable | 3 | Mtr. | 2,413 ₹7,239 Lowest | 2,515 ₹7,545 |
| 7.00 | Cost of connecting Lead Brazing with insulating materials | 3 | No. | 3,815 ₹11,445 Lowest | 3,900 ₹11,700 |
| 8.00 | Both side cover housing as per bearing size with CI electrode | 1 | No | 20,290 ₹20,290 Lowest | 21,100 ₹21,100 |
| 9.00 | Slot repairing for Stator | 35 | No. | 446 ₹15,610 Lowest | 498 ₹17,430 |
| 10.00 | Slot Wedge | 25 | No. | 337 ₹8,425 Lowest | 350 ₹8,750 |
Tender Value
₹3.3 L
EMD Value
₹4,200
Closing Date
2 May 2025, 3:00 pmClosed
Project Engineer (EnM),Urimari OCP
Office of The Project Engineer (EnM),Urimari OCP, Barka Sayal Area, Pin 825311
Repairing of 04 nos. 3.3KV HT Motor and Rotor of Potanga Quarry under Urimari OCP.
2025_CCL_334351_1
PE(EnM)/Urimari/e Tender/25-26/05
Open Tender
Electrical and Maintenance Works
Item Wise
10 days
Urimari OCP
As per NIT
2 documents required · 2 mandatory
₹4,200
13 Jul 2026
21 Apr 2025
3 May 2025
22 Apr 2025
2 May 2025
22 Apr 2025
22 Apr 2025 - 29 Apr 2025
Amount
A. 235KWMotor3.3KV Cost of Rotor Bar(13Nos.X2.5Kg)
Brazing Rod L&T 1805
Slot Wedge
Installation Charge
Other Overhead and expenses
B. 200KWMotor3.3KV Cost of connecting Lead Cable
Cost of connecting Lead Brazing with insulating materials
Both side cover housing as per bearing size with CI electrode
Slot repairing for Stator
Slot Wedge
Wash & Insulating material
Other Overhead and expenses
C. 400KWMotor3.3KV HT Bushing with stud 3.3KV Grade
Coupling Box
Coupling
Installation Charge
Other Overhead and expenses
D. 180KW Motor 3.3KV Bearing cover for Inner bearing housing
Bearing cover for Outer bearing housing
Internal Retaining Ring
HT Bushing with stud 3.3KV Grade
Installation Charge
Other Overhead and expenses
Total impact of GST for the purpose of CTC
M/S DK ENTERPRISES (BID ID -1150209)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .