Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹39.0 L+₹7,980 (0.21%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹43.7 L+₹4.8 L (12.4%)Admitted-Finance VILL SAKRAH PO CHAMBI TEHSIL SUNDERNAGAR DISTT MANDI HP | SUNDERNAGAR | MANDI | HIMACHAL PRADESH | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Ravi Kant L1 | BHUP CHAND L2 | KUSHAL SINGH RAGHAV L3 |
|---|---|---|---|---|---|---|
| 1.00Operation, running and maintenance of scheme as per the entire satisfaction of the Engineer-in-Charge. BVMIP (LB) Sundernagar Phase 2nd | ||||||
| 2.00 | Deployment of 4 Nos. Pump operator for smooth running of the pumps & motors including preparing the record of running of pumping machinery of scheme under JSV Sub Division BVMIP (LB) Sundernagar complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge.
(At RD 0 Main Pump House = 1 No., Lift-1= 1 No., Lift-2,3&4= 1 No. and Lift-5= 1 No., Total = 4 Nos Pump Operator) | 1,460 | Days | 420 ₹6,13,200 Lowest | 465 ₹6,78,900 | 495 ₹7,22,700 |
| 3.00 | Deployment of 3 Nos. Pump Attendant for smooth running of the pumps & motors including preparing the record of running of pumping machinery of scheme under JSV Sub Division BVMIP (LB) Sundernagar complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge.
(At RD 0 Main Pump House = 1 No., Lift 1 = 1 No. & Lift-2,3&4= 1 No., Total = 3 Nos Pump Attendant) | 1,095 | Days | 410 ₹4,48,950 Lowest | 429 ₹4,69,755 | 495 ₹5,42,025 |
| 4.00 | Deployment of 13 Nos. Beldar for smooth running of the scheme i.e. distribution of water in public field at siphons constructed by department, minor repair of distribution system, watch & ward and miscellaneous work of scheme under JSV Sub Division BVMIP (LB) Sundernagar complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge.
(At Syphon Control=1 No., Lift-1= 1 No., Lift-2= 1 No., Lift-3= 1 No., Lift-4= 2 Nos., Lift-5= 4 Nos., Gravity1= 1 No., Gravity2= 1 No. & Gravity5 = 1 No. Total = 13 Nos. Beldar) | 4,745 | Days | 382 ₹18,12,590 Lowest | 429 ₹20,35,605 | 485 ₹23,01,325 |
| 5.00 | Deployment of 4 Nos. Chowkidar for smooth running of the scheme i.e. watch & ward of pumping machinery, pump house and miscellaneous work of scheme under JSV Sub Division BVMIP (LB) Sundernagar complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge.
(At RD 0 Main Pump House = 1 No., Lift 2,3,4 = 1 No. & Lift-5= 1 No., & SD office= 1 No. Total = 4 Nos Chowkidar) | 1,460 | Days | 310 ₹4,52,600 Lowest | 421 ₹6,14,660 | 485 ₹7,08,100 |
| 6.00 | Deployment of 1 No. Sweeper for cleaning and sweeping of Sub Divisional office building (whole complex) including toilets etc. for the period of one year complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge. (Part time 4 hours per day)
(SD Office building = 1 No. Sweeper) | 1,180 | Hours | 348 ₹4,10,640 | 68 ₹80,240 | 65 ₹76,700 Lowest |
| 7.00 | Providing and supplying of all cleaning items for cleaning the floor of rooms as well as toilet i.e. floor cleaner, toilet cleaner (acid & phenyl), mop etc. complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge. | 12 | Months | 12,500 ₹1,50,000 | 1,400 ₹16,800 Lowest | 1,500 ₹18,000 |
Tender Value
₹55.6 L
EMD Value
₹1.2 L
Closing Date
4 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE
Executive Engineer JS Division Baggi Distt. Mandi H.P.
as per BOQ
2026_HPIPH_146646_1
EE-JSD-BGI-TA-Tender/2026- 19986-20036 dt. 24/10/2026
Open Tender
Repair and Maintenance Works
Item Rate
365 days
Baggi
as per NiT
6 documents required · 6 mandatory
₹2,000
₹1.2 L
6 Nov 2026
26 Oct 2026
5 Nov 2026
26 Oct 2026
4 Nov 2026
26 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation, running and maintenance of scheme as per the entire satisfaction of the Engineer-in-Charge.
BVMIP (LB) Sundernagar Phase 2nd | - | - | - | - |
| 2 | Deployment of 4 Nos. Pump operator for smooth running of the pumps & motors including preparing the record of running of pumping machinery of scheme under JSV Sub Division BVMIP (LB) Sundernagar complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge.
(At RD 0 Main Pump House = 1 No., Lift-1= 1 No., Lift-2,3&4= 1 No. and Lift-5= 1 No., Total = 4 Nos Pump Operator) | 1,460 | Days | - | - |
| 3 | Deployment of 3 Nos. Pump Attendant for smooth running of the pumps & motors including preparing the record of running of pumping machinery of scheme under JSV Sub Division BVMIP (LB) Sundernagar complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge.
(At RD 0 Main Pump House = 1 No., Lift 1 = 1 No. & Lift-2,3&4= 1 No., Total = 3 Nos Pump Attendant) | 1,095 | Days | - | - |
| 4 | Deployment of 13 Nos. Beldar for smooth running of the scheme i.e. distribution of water in public field at siphons constructed by department, minor repair of distribution system, watch & ward and miscellaneous work of scheme under JSV Sub Division BVMIP (LB) Sundernagar complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge.
(At Syphon Control=1 No., Lift-1= 1 No., Lift-2= 1 No., Lift-3= 1 No., Lift-4= 2 Nos., Lift-5= 4 Nos., Gravity1= 1 No., Gravity2= 1 No. & Gravity5 = 1 No. Total = 13 Nos. Beldar) | 4,745 | Days | - | - |
| 5 | Deployment of 4 Nos. Chowkidar for smooth running of the scheme i.e. watch & ward of pumping machinery, pump house and miscellaneous work of scheme under JSV Sub Division BVMIP (LB) Sundernagar complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge.
(At RD 0 Main Pump House = 1 No., Lift 2,3,4 = 1 No. & Lift-5= 1 No., & SD office= 1 No. Total = 4 Nos Chowkidar) | 1,460 | Days | - | - |
| 6 | Deployment of 1 No. Sweeper for cleaning and sweeping of Sub Divisional office building (whole complex) including toilets etc. for the period of one year complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge. (Part time 4 hours per day)
(SD Office building = 1 No. Sweeper) | 1,180 | Hours | - | - |
| 7 | Providing and supplying of all cleaning items for cleaning the floor of rooms as well as toilet i.e. floor cleaner, toilet cleaner (acid & phenyl), mop etc. complete job in all respect with in all leads and lifts as per direction of the Engineer-in-Charge. | 12 | Months | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
FORM6_8.pdf
Tender Documents • 0.60 MB
TC.pdf
Tender Documents • 0.35 MB
BOQ_218657.xls
BOQ • 2.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .