Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
27 Oct 2025, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
LOGANATHAN G
Uran LPG Plant, Bharat Petroleum Corporation Limited
ok
22756
1000444205
Limited Tender
Buy
Uran LPG Plant
18 Dec 2025
13 Oct 2025
27 Oct 2025
13 Oct 2025
27 Oct 2025
13 Oct 2025
17 Oct 2025 - 17 Oct 2025
Verification ,Stamping and liaisoning with Legal Metrology for Filling Machines Scale,
Double Static Check Scale and Correction Check Scale at Uran LPG Terminal
i. Repair, verification and liaisoning with W&M for calibration & stamping charges
includes manpower, transport, tools and spares, material handling etc
ii. Cleaning, Repairing and verification as per specifications / requirement of legal
metrology department.
iii. Carrying out inspection and maintenance of weighing scales pre-stamping
iv. Liaisoning with Legal Metrology department for stamping of Weighing Sclaes
including arranging visit as required, paperwork (if any)
v. Supply and fixing of lead, sealing wires and associated materials as and when
Safety Precautions during Job:
i. All the safety procedures, SOP’s have to be followed during work. Use PPE’s is
mandatory for workers on the job. PPEs should have valid testing certificates from
competent authority. Work permit system to be followed.
ii. All personal working on job shall be appraised of possible danger connected with the
job. Local authorities shall be advised as to the time of the job and relevant phone nos.
obtained for use in case of emergency
iii. During job, no unauthorized personal shall be allowed near work area, warning signs
“Work in progress”, “keep off” shall be installed in English and local languages to warn
people at places as desired by Engg. Officer.
iv. The liability for any accident/mishap and the loss thereof lies totally with the contractor
and BPCL is not responsible for any payment / compensation etc. whomsoever
v. The Contractor shall provide all tools, tackles, PPEs (safety belt, helmets, safety shoes
etc) and consumables etc. that are required to complete the subject job. The relevant test
certificates of tools and other material etc. to be submitted to site in charge.
vi. Work permits system to be followed during work
Completion Time:
i. The completion time of the above said job will be as per LOI
ii. The progress of work is likely to be interrupted on account of operation or
environmental conditions in area. Stoppage of work under such constraints shall not
entitle, successful tendered to claim any compensation for idling of machinery,
manpower etc. during such interruptions. The tenderer /contractor has to consider all
Bidders Signature and stamp Page 1 of
these factors while quoting the rates in price bid format. Contractor has to plan the
job as per berthing sequence to complete the job within completion period.
iii. Contractor has to maintain hindrance register/delay register as per BPCL format for
recording any undue delays. The same will be taken into account for calculating any
liquidity damages.
4. DEPOSIT (SD/BG): Not Applicable in this tender
5. Execution Of Agreement:
i. Successful tenderer will be required, before undertaking the contract, to execute
the Agreement, within 15 (Fifteen) days of the date of issue of the LOI given by
ii. When the person signing the tender is not the authorized signatory, necessary
original Power of Attorney authorizing the signatory to act on behalf of the
proprietor/ firm should be produced before signing the agreement, and notarized
copy of the power of Attorney of the person authorizing should be submitted for
the record of BPCL.
iii. Failure to execute the agreement and/ or furnish required Security Deposit within
15 (Fifteen) days of issue of Letter of Intent (LOI) may render the tenderer liable
for termination of contract without prejudice to the rights of BPCL to recover the
damages under Law.
All terms & conditions stipulated in the Notice Inviting Tender, Guidelines for Tenderers,
Tender Terms & Conditions, Declarations, Agreement and other documents furnished with
the Tender and related correspondence shall form part of the contract
6. Payment Terms:
i. Payment will be made to the bidder only on the completion of the job and receipt of
stamping certificates. Payments will be made within 15 days on submission of
invoices with accepted certificates.
ii. Partial payments will be made by BPCL for each completed job based on the
decision of engineering in-charge.
iii. No payment will be made in advance. TDS will be deducted as per prevailing rules &
7. Other Conditions:
i. The Contractor and his workmen should follow rules and regulations of the BPCL
Bidders Signature and stamp Page 2 of
ii. For the above Job there might be intermittent stoppage of work due to environmental /
operational factors.
iii. BPCL reserves the right to award the job in part or full as per requirement. The
tenderer shall not claim any compensation for the same.
iv. The tenderer should study the entire tender document carefully and understand the
conditions before quoting. If there are any doubts, he should obtain clarification but
this shall not be a justification for late submission or extension of opening date / time
of the tenders. This tender is floated through e-tendering & responses through e-
tendering will only be considered.
v. The contractor should follow the safety norms, as applicable in the plant and as
directed by the Corporation from time to time.
vi. BPCL reserves the right to reject any or all the tenders without assigning any reasons
vii. BPCL also reserves the right to award the job for partial quantity due to operational
constraint. In such case BPCL will not pay any compensation, what so ever, for
partial quantity.
viii. The contractor and supervisor to be present during the execution of job and
contractors supervisor should take care of all the permits and gate passes if required
ix. The contractor shall comply with all the statutory requirements prevailing from time
x. Liquidation damages shall be recovered from the contractor in case of delay of
execution, as per general terms & conditions
xi. Contractor would be required to engage adequate number of manpower so as to carry
out all the work satisfactorily. The persons employed should be of suitable age for
brisk working and should have knowledge about the work, inside the plant. No person
above the age of 60 years or below 18 years shall be employed by you in the
operational area.
xii. Successful tenderer shall also be responsible for and pay the expenses for providing
medical treatment to any of their employees who may suffer bodily injury as a result
of any accident.
xiii. No other payment, allowance or benefit etc. will accrue to the successful tenderer or
any persons hired by him/her for doing the specified jobs.
xiv. The Contractor will be required to maintain all statutory records like wage register,
advance payment register, attendance register, EPF, ESI or equivalent work men
compensation coverage in the formats advised by statutory bodies.
Bidders Signature and stamp Page 3 of
xv. The Contractor should ensure that every employee is wearing uniform, safety shoes,
Gloves and Helmet while working on the site. In case of non-adherence suitable
action will be taken against offender and employer/contractor.
xvi. The rates quoted should be inclusive of all taxes and the statutory payments like EPF,
ESI, Service taxes, etc. The TDS and WCT shall be deducted as per the prevailing
statutory norms.
xvii. Contractor should fulfil all the requirement of the Contract Labour Act 1970, and the
Minimum Wages Act 1948. The contractor should take a license from the Labour
Office and he should maintain all the statutory registers and records.
xviii. No payment shall be made for the work half completed. The measure for the
completion of work is arrived/accepted based on the signature of the officer in charge
on the work sheet/report.
xix. Whenever there is duplication of clause either in the terms and conditions or in the
Agreement, the clause, which is beneficial to BPCL, will be considered applicable at
the time of any dispute.
xx. If the quality of the supplied material is found to be unsatisfactory fully or in part, the
material will be rejected and the successful tenderer will held responsible to replace
the material in full.
xxi. If any old section of pipeline, grating, I-beam, channels is used; no payment will be
made for the length/number of such sections.
xxii. The rate quoted shall be firm during the entire tenure of contract (i.e till completion of
the job ) and shall not be altered / revised on account of increase in cost of materials,
labour, taxes etc or any other reason whatsoever in nature. Any variation in Govt.
taxes/ duties/ levies will be reimbursed/ recovered during the contract tenure.
xxiii. This is a non-divisible nature of tender. MSME quoting in the price band of L1+15%
shall be awarded for full/complete job subject to MSME bringing down the price to L1
price, in case L1 is someone other than MSME. No separate preference will be given to
MSME owned by SC/ST entrepreneurs over MSME owned by general person.
xxiv. CA certificate to be submitted for availing MSME purchase preference benefits.
xxv. The contract under this tender will be valid for one year and quantities of all/some line
items may be extended on mutual terms, on same rates, terms & conditions
Bidders Signature and stamp Page 4 of
Bharat Petroleum Corporation Ltd.
PRICE BID FORMAT FOR VERIFICATION,STAMPING AND LIASONING CHARGES WITH
LEGAL METROLEOGY AT URAN LPG TERMINAL.
ITEM QTY AMOUNT UNIT TOTAL
Stamping fee of Electronic
1 weighbridge 50MT capacity
Stamping fee of Electronic
weighing scale 100-300kg 0.00 nos
Liasoning work denting,
3 painting, greasing and 1 0.00 LS
Bidders Signature and stamp Page 5 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
22756.pdf
pdf • 0.26 MB
BUDGETDOC_22756.pdf
pdf • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .