Tender Value
₹16.4 L
EMD Value
₹32,882
Closing Date
11 Mar 2024, 2:30 pmClosed
DGM
ED-II Bardowali
Extension of HT LT line OH UG inc construction of 5 nos 63 KVA Sub-stn for providing 3 phase service connection to DTW Scheme at Kalidas Para II Pal Para Bholagiri Asharam Para chowdhury para 4 no colony kathaltali under ED-II Bardowali
2024_POWER_47858_1
DGM/ED-II/2023-24/18
Open Tender
Electrical Works
Item Rate
Jogendranagar Bardowali Amtali
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,540
₹32,882
15 Mar 2024
6 Mar 2024
11 Mar 2024
6 Mar 2024
11 Mar 2024
6 Mar 2024
Amount
(Supply & Erection)
Erection of 11.0 mtrs length of Steel Tubular Pole at any kind of soil upto a depth of 1/6 th of pole height, including excavation of earth, refilling the pit with with soil upto the ground level, ramming and making complete in all respect.
Erection of 9.0 mtrs length of Steel Tubular Pole at any kind of soil upto a depth of 1/6 th of pole height, including excavation of earth, refilling the pit with with soil upto the ground level, ramming and making complete in all respect.
Erection of 8.0 mtrs length of Steel Tubular Pole at any kind of soil upto a depth of 1/6 th of pole height, including excavation of earth, refilling the pit with with soil upto the ground level, ramming and making complete in all respect.
Erection of Stay set direct in earth complete with 19mm x 1800 mm long stay rod, anchor plate of size 300 x 300 x 8 mm ,thimble, turn buckle, 7/3.15 mm dia G.I Standed stay wire and stain insulator etc. with Supply of M.S.Clamp,Nuts & Bolts etc. as required. and making complete in all respect.
Erection of M.S.Angle Cross-Arm,1.0 to 2.8 mtr Long 65 x65 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts)
Erection of M.S.Angle Cross-Arm bracket for LT Line upto 1.2 mtr long 65 x65 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts)
Erection of M.S.Channel Cross-Arm,0.3 to 1.2 mtr Long75 x40 x 40 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts)
Erection of M.S.Channel Cross-Arm,1.3 to 2.8 mtr Long75 x40 x 40 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts)
Erection of M.S.Channel Cross-Arm,0.6 to 2.8 mtr Long100 x50 x 50 x 6 mm ( Excluding the cost of Back Clamp, Nuts & Bolts)
Earthing with G.I pipe 2.5 mtr Long and 40mm dia, including excavation, refilling with alternate layer of salt & Charcoal as per drawing including supply of G.I.Pipe, Salt & Charcoal, GI wire, nuts &bolts, etc. as required)
Erection of 11KV Pin insulator along with Pin.
Erection of 11 KV Single Disc insulator set along with necessary fittings
Laying & Stringing of 1km (Single Conductor) ACSR 6/1/2.59 mm dia 'WEASEL' including hoisting & binding etc. Complete as required.
Laying & Stringing of 1km (Single Conductor) ACSR 6/1/3.35 mm dia 'RABBIT' including hoisting & binding etc. Complete as required.
Febrication of Cross-Arms by MS Channel/MS Angle as per specification
Installation/Positioning of 11/0.430KV,3-Phase 63 KVA of Distribution Transformer on Pole with necessary connections & fitting fixing of all allied accessories components as required for making complete in all respect for energizing.
Erection of 9KV,5KA single pole metal oxide gapless type LA , including necessary connection complete as per technical specification.
Erection of 11KV DOF unit set of three nos. including necessary connection complete as per technical specification.(Excluding the cost of back clamp,Nuts & Bolts)
Erection of 11KV 200 Amp. GOS unit set of three nos. including necessary connection complete as per technical specification (Excluding the cost of back clamp,Nuts & Bolts)
Laying of one number PVC insulated and PVC sheathed / 70 sqmm XLPE power cable of 11 KV grade of following size direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc as required..... Trench Size: Width-350mm, Hieght-1200mm / Sand (couhioning): Hieght-250mm, Width-350mm/ Protection: Double layer Bricks. (Upto 120 sq. mm Cable )
Laying of one number additional PVC insulated and PVC sheathed / XLPE power cable of 11 KV grade of following size direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc as required…….Trench Size: Width-350mm, Hieght-1200mm / Sand (couhioning): Hieght-250mm, Width-350mm/ Protection: Double layer Bricks ( Upto 120 sq. mm )
Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 11 KV grade of all size in the GI Pipe/HDPE for riser including tieup of Pipe with pole by the help MS Flat Clamp (excluding cost of Clamp and Nut&Bolts) as required ( Up to 400 sq. mm ) including coiling of excess cable.
Supply , Making and Erection of Out door cable end termination with heat shrinkable jointing kit completing with all accessories i/c lugs suitable following size of 3 core XLPE alluminium conductor cable 11 KV Grade as required upto 150 Sqmm.
Providing of Pre-cast cement concretecable identification route marker of T shape (1 cement: 2 coarse sand : 4 graded stone aggregate 6mm nominal size) reinforced with 1.6 mm dia mild steel wire including centring and shuttering, roughening cleaning, fixing and finishing in cement mortar 1:3(1cement : 3 fine sand) etc. complete, excluding the plastering of jambs, sills and soffits as per design, drawing and specification of TSECL. The marker shall be embossed "DANGERS: TSECL, ELECTRIC POWER CABLE" with Black colour letter(both side). The visible part shall be painted with Yellow colour japan paint. (1 cement: 2 coarse sand : 4 graded stone aggregate 6mm nominal size) reinforced with 1.6 mm dia mild steel wire including centring and shuttering, roughening cleaning, fixing and finishing in cement mortar 1:3(1cement : 3 fine sand) etc. complete, excluding the plastering of jambs, sills and soffits.
Providing Three Phase Service Connection with laying of PVC cable from nearby Electrical pole to Premises upto 35mtr in length supported by G.I.Wire,Reel Insulator i/c fitting fixing of Energy Meter as required .
Maintaining adequate clearance from overhead liveconductors by Trimming of tree branches for Way Leaves
Grouting of steel tubuler poles /stay set with CC of ratio 1:2:4(1 cement : 2 river sand : 4 Jhama brick aggregate of 20 mm nominal size)i/c supply of cement,sandand brick aggregate20 mm nominal size complete with excavation, refilling of earth ,ramming alonf with centeringand shutteringaas required @ 0.273 CUM per Steel tubuler pole & & 0.119 Cum/stay sets per TSECL specification,27 nos. S.T Pole (0.273 Cum X27=7.371 Cum)
Applying paints with ready mixed primer of approved primer of approved quality on steel works including painting ( two or more coats ) with alluminium paint of approved quality to new works to given an even shade ( As per approved agreement no. DGM/ED-II/2022-23/02 Dt. 12-05-2022
Providing of Sub-station protective fencing as per direction of Engineer -In-Charge.
Carriage of 11.0 mtrs length of Steel Tubular Poles by Mechanical Transport from the Electrical Sub-Divisional Site Store ( Ambassa Electrical Division ) to working site Vis-a-vis, including loading, unloading and stacking as required,Upto the lead range 25 km of Maximum 8 (Eight ) nos. of Pole ii) Beyond 8 (Eight ) nos Pole
Carriage of 8.0 / 9.0 mtrs length of Steel Tubular Poles by Mechanical Transport from the Electrical Sub-Divisional Site Store to working site Vis-a-vis, including loading, unloading and stacking as required,Upto the lead range 25 km of i) Maximum 6 ( Six ) nos. of Pole ii) Beyond 6 (Six ) nos Pole
Carriage of materials such as Cable,AAC, AAAC, ACSR, G.I.Wire,Cross-Arm,Stay set,Insulators etc., by Mechanical Transport from the Electrical Sub-Divisional Site Store to working site Vis-a-vis, including loading, unloading and stacking as required, upto the lead of 25km & 50km,Upto the lead range 25 km
Carriage of G.O.S, D.O.F,L.A,etc., by Mechanical Transport from the Electrical Sub-Divisional Site Store to working site Vis-a-vis, including loading, unloading and stacking as required ,Upto the lead range 25 km
Carriage of 11/0.430, 3-Phase ,63 KVA by Mechanical Transport from the Site /Store/Worshop to working site Vis-a-vis including loading, unloading and placing on base, as required,Upto the lead range 25 km
Supply of 3-phase 3-core, 6.35/11 KV , 70 sqmmXLPE insulated Aluminium power cable
Supply of 110 mm dia minimum 6.5 mm , maximum 7.3 mm wall thickness HDPE Pipe
Supply of 70 Sqmm Alluminium Lugs
Supply of 120 Sqmm Alluminium Lugs
Supply of Wooden Plank (24"X10'X1.5"size) including necessary connection etc. as required
Copper Plate with holes for connection of L.T Side cable at Transformer
Supply of Polythene Pipe 1/2" dia
Supply of Fabricated MS Bracket Clamp
Supply of Fabricated MS Stay Clamp
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .