Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹26.7 LAccepted-AOC LOCATION HIMACHAL PRADESH HP | KANGRA | HIMACHAL PRADESH | 176219 | L-1 | Accepted-AOC Found Lowest One | |
| 2 | L-2₹30.0 L+₹3.3 L (12.3%)Rejected-Finance V P O TEHSIL JAWALAMUKHI DISTT KANGARA HP | L-2 | Rejected-Finance High rate quoted | |
| 3 | L-3₹31.2 L+₹4.5 L (16.8%)Rejected-Finance VILLAGE DOHAL PO PATTI TEHSIL PALAMPUR DISTRICT KANGRA | KANGRA | HIMACHAL PRADESH | 175013 | L-3 | Rejected-Finance High rate quoted |
Tender Value
₹24 L
EMD Value
₹43,500
Closing Date
23 Jul 2022, 11:00 amClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION PALAMPUR
Improvement of lift water supply scheme for providing households connection to Gram Panchayat Menjha in Tehsil Palampur, Distt. Kangra (H.P)
2022_HPIPH_62788_1
HPIPH 7045-80 DATED 16.07.2022
Open Tender
Civil Works
Lump-sum
180 days
PALAMPUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹400
₹43,500
Yes
7 Aug 2023
16 Jul 2022
23 Jul 2022
16 Jul 2022
23 Jul 2022
16 Jul 2022
Amount
Designing, Constructing, Testing & Commissioning reinforcement cement concrete elevated Circular Over head storage tanks as per capacity given below at various stages/sites including excavation in all kinds and types of strata, soil strata including dewatering in M30 design mix in foundation, walls, bottom slab, roof slab/dome with smooth finishing in 1:3 inside the tank, all alied Civil Works, Site development, cutting/excavation in all kinds of soils, refilling and disposing of all surplus stuff within all leads and lifts labour and material charges. The job also includes providing lowering, laying, erecting, hoisting and jointing of pipe assembly for inlet, outlet, overflow and scour pipeproper manifold at outlet including all fittings, bye pass arrangement consisting of GI MS pipes special and valves of required classes and dia and all other accessories required such as MS ladders inside and outside ventilator with mosquito proof wire mesh,lightening arrester complete, SFRC manhole covers including frames and covers (medium duty) with proper locking arrangement water level indicator, RCC frames for all valves ventilating shafts shall also be provided including all leads and lifts as per entire satisfaction of Engineer-in-charge. The tanks shall be hydraulically tested for water tightness all works shall be conforming to relevant IS code. The cost of valves & other accessories shall be included in the rates of tanks. Battery Limit shall be considered as 3.00 metre from the edge of the structure or the boundary of the land whichever is less.The rates quoted by the contractor shall be for the complete work. All ancilliary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account. The work shall include supplying of Five sets of structural design after testing the bearing capcity of soil and drawings, etc. complete as directed by Engineer-in-charge.
a) 240000 litres capacity
Vijay kumar kushwaha
GANTANTAR THAKUR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .