Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical nOT FULFILL THE CLASUE 16 OF NIT |
Tender Value
₹10.3 L
EMD Value
₹20,600
Closing Date
1 Mar 2022, 2:30 pmClosed
GM,HWPK
GM OFFICE,HWPK
Servicing and Painting of Spring Hanger Supports and Turn Buckles at HWPK Site during MTA-22
2022_HWB_670167_1
HWPK/Mech/2021/302
Open Tender
Job Works
Item Rate
90 days
GM OFFICE, HWPK
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹20,600
Yes
GM OFFICE,HWPK
28 Apr 2022
28 Jan 2022
3 Mar 2022
28 Jan 2022
1 Mar 2022
3 Feb 2022
22 Feb 2022
Amount
Maintenance of large dia gas pipeline of 750 mm dia to 900 mm dia gas pipelines of exchange unit towers. The contractor shall arrange winch and JHULA (Man carrying basket for carrying out above job. The job involves dismantling of Spring Hanger Supports from Pipelines, locking of spring at set cold load, removal of spring hanger from pipeline, Shifting of Spring Hangers to Work Station at Site, Cleaning of Fasteners, ISMC, Pipe Supports, Pipe Clamps, Cleats, and Internal Parts of the Spring Hangers like Springs etc. The spring hangers are to be serviced and repaired wherever required. All the components are to be dried lubricated, assembled, and painted by one coat of red oxide zinc chromate primer and two coats of chlorinated rubber paint of Grey Color. The DFT of two coats of paint shall not be less than 70 micron. Contractor shall use Asian/Berger/Equivalent paint in sealed tins only and paint shall be applied with the help of spray gun. The erection of the spring hanger supports to the support location and cold load setting. The entire process shall be carried out by the use of Hydraulic Jacks, Winches, Chain Pulley Blocks and Specific Tools with skilled and experienced manpower. Type of spring hangers included are VS-1, VS-2, VS-3 etc and load may vary from 2000 Kg to 5000Kg. Material and preparation of scaffolding is in scope of contractor. Load scales wherever damaged and scales are not appearing are to be provided with new aluminum plate with duly mentioned scale and riveted on the spring hanger. Spring hanger numbers are to be mentioned and date of servicing to be written on spring hanger on its mounting structure.
Dismantling of Spring Hanger Supports from Pipelines, Shifting of Spring Hangers to Work Station at Site, Cleaning of Fasteners, ISMC, Pipe Supports, Pipe Clamps, Cleats, Internal Parts of the Spring Hangers like Springs etc. The spring hangers are to be serviced and repaired. All the components are to be dried lubricated, assembled, and painted by one coat of red oxide zinc chromate primer and two coats of chlorinated rubber paint of Grey Color. The DFT of two coats of paint shall not be less than 70 micron. Contractor shall use Asian/Berger/Equivalent paint in sealed tins only and paint shall be applied with the help of spray gun. The erection of the spring hanger supports to the support location and operating load setting. The entire process shall be carried out by the use of Hydraulic Jacks, Winches, Chain Pulley Blocks and Specific Tools with skilled and experienced manpower. Type of spring hangers included are VS-1, VS-2, VS-3 etc and load may vary from 500 Kg to 2000 Kg. Material and preparation of scaffolding is in scope of contractor. Load scales wherever damaged and scales are not appearing are to be provided with new aluminum plate with duly mentioned scale and riveted on the spring hanger. Spring hanger numbers are to be mentioned and date of servicing to be written on spring hanger or its mounting structure.
Dismantling of Pipe Turn-Buckle Supports in Exchange Unit and RAHIE from pipe lines, shifting to work station at Site. Cleaning of Fasteners, ISMC, Pipe Supports, Pipe Clamps, Turn Buckles and its threads, Cleats etc. The turn-buckles are to be serviced; threads are to be lubricated by Lithium based grease and repaired including minor welding work and threading. All the components are to be lubricated, assembled and painted by one coat of red oxide zinc chromate primer and two coats of chlorinated rubber paint of Grey Color. The DFT of two coats of paint shall not be less than 70 micron. Contractor shall use Asian/Berger/Equivalent paint in sealed tins only and paint shall be applied with the help of spray gun. The erection of turn-buckle supports to the support location, installation, tightening fasteners at standard value specified by HWPK EIC and requisite load setting. Entire process shall be carried out by the use of Hydraulic Jacks, Winches, Chain Pulley Blocks and Specific Tools with skilled and experienced manpower. Material and preparation of scaffolding is in scope of contractor. Structure of turn buckle mounting area 250 mmx250 mm shall be painted and turn-buckle numbers and date of servicing are to be written.
DHINGI ENTERPRISES
M/S SONAM ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .