| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 LAccepted-AOC | ₹19.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹19.8 L+₹34,928 (1.80%)Rejected-Finance | ₹19.8 L+₹34,928 (1.80%) | L2 | Rejected-Finance Not L1 |
| 3 | L3₹19.9 L+₹46,616.08 (2.40%)Rejected-Finance | ₹19.9 L+₹46,616.08 (2.40%) | L3 | Rejected-Finance Not L1 |
| 4 | L4₹21.3 L+₹1.9 L (9.71%)Rejected-Finance MATHRAKKATTU BRAHMAPURAM P O AMBALAMEDU ERNAKULAM 682 303 | ERNAKULAM | ERNAKULAM | KERALA | 682303 | ₹21.3 L+₹1.9 L (9.71%) | L4 | Rejected-Finance Not L1 |
| 5 | L5₹24.7 L+₹5.2 L (26.9%)Rejected-Finance | ₹24.7 L+₹5.2 L (26.9%) | L5 | Rejected-Finance Not L1 |
| Sl No | Description | Qty | Unit | YES YEM CONSTRUCTION L4 | TENNY T J L3 | saaj constructions L5 | MOHAMMED NAFAISE E K L1 | HITRUST CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and disposal of rubbish within Infopark Phase I campus, as directed by engineer in charge | 190 | sqm | 12 ₹2,280 | 13.44 ₹2,553.6 | 10 ₹1,900 Lowest | 13 ₹2,470 | 13 ₹2,470 |
| 2.00 | Dismantling tile work in walkway laid in cement mortar including stacking material within Infopark phase II. For thickness of tiles above 20 mm and up to 40 mm | 113 | Sqm | 200 ₹22,600 | 91.8 ₹10,373.4 | 100 ₹11,300 | 85 ₹9,605 Lowest | 90 ₹10,170 |
| 3.00 | Taking out RCC cover slabs of size upto 1sqm and shifting to Infopark Phase II as per the direction of Engineer-in-Charge. | 0.9 | Cum | 3,500 ₹3,150 | 2,715.06 ₹2,443.55 | 2,900 ₹2,610 | 2,680 ₹2,412 | 2,500 ₹2,250 Lowest |
| 4.00 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within Infopark phase 1. All kinds of soil | 11 | Cum | 350 ₹3,850 | 270.21 ₹2,972.31 | 320 ₹3,520 | 262 ₹2,882 | 250 ₹2,750 Lowest |
| 5.00 | Filling the areas with earth available at Infopark Phase I/Phase II campus including loading, conveyance and spreading, without consolidating, lead up to 5 km and lift up to 1.5 m. | 176 | cum | 300 ₹52,800 | 235.2 ₹41,395.2 | 120 ₹21,120 Lowest | 230 ₹40,480 | 225 ₹39,600 |
| 6.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 (1 cement : 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) | 3.3 | Cum | 7,200 ₹23,760 | 6,704.47 ₹22,124.75 | 7,800 ₹25,740 | 6,620 ₹21,846 Lowest | 7,000 ₹23,100 |
| 7.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing, and reinforcement at all levels 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 11 | Cum | 8,500 ₹93,500 | 8,267.4 ₹90,941.4 | 10,000 ₹1,10,000 | 8,175 ₹89,925 Lowest | 8,700 ₹95,700 |
| 8.00 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position, and binding all complete up to plinth level. Thermo - Mechanically Treated bars of grade Fe-500D or more | 989 | Kg | 95 ₹93,955 | 89.45 ₹88,466.05 | 95 ₹93,955 | 85 ₹84,065 Lowest | 86 ₹85,054 |
| 9.00 | Centering and shuttering including strutting, etc., and removal of form for: Foundations, footings,cover slabs, walls etc complete | 56 | Sqm | 520 ₹29,120 | 305.13 ₹17,087.28 | 340 ₹19,040 | 300 ₹16,800 Lowest | 300 ₹16,800 Lowest |
| 10.00 | Solid block masonry using precast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15 cm in CM 1:6 ( 1 cement:6 coarse sand) etc complete | 6 | Cum | 6,900 ₹41,400 | 6,693.3 ₹40,159.8 | 7,300 ₹43,800 | 6,610 ₹39,660 Lowest | 7,200 ₹43,200 |
Tender Value
₹21.9 L
EMD Value
₹50,000
Closing Date
23 Jul 2024, 6:00 pmClosed
CEO Infopark
Parkcentre building near Thapasya, Infopark Kochi PO, Kakkanad
As per NIT
2024_INFOP_680591_1
Infopark/ e-Tender /022/2024-25
Open Tender
Civil Works - Others
Item Rate
45 days
Infopark Kochi Phase I at Thrikkakara Municipality
As per NIT
6 documents required · 6 mandatory
₹2,950
₹50,000
27 Oct 2025
15 Jul 2024
24 Jul 2024
15 Jul 2024
23 Jul 2024
15 Jul 2024
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .