Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹94,137.30Admitted-Finance 78 PHUSBANGLOW BHAGA SHALIMAR DHANBAD DHANBAD 828301 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828301 | L1 | Admitted-Finance | ||
| 2 | L2₹96,490.73+₹2,353.43 (2.50%)Admitted-Finance AT NEAR BOI PHUSBUNGLOW SINDRI ROAD BHAGA DHANBAD JHARKHAND 828301 | BHAGA | DHANBAD | JHARKHAND | 828301 | L2 | Admitted-Finance | ||
| 3 | L3₹98,844.17+₹4,706.87 (5.00%)Admitted-Finance UPPER KULHI PO JHARIA 828301 DIST DHANBAD | JHARIA | DHANBAD | JHARKHAND | 828301 | L3 | Admitted-Finance |
Tender Value
₹1.1 L
EMD Value
₹1,389
Closing Date
9 Sept 2026, 10:00 amClosed
Area Manager (EnM) Lodna Area
Office of the General Manager Lodna Area
Dismantling Transportation Installation and Commission of 500 KVA 11 KV/440V Lighting Transformer and 11 KV/440V Switches with Laying of Cable Pole Mounting Connection and Shifted M.Pit Sub-Station to Nearby Colonies Sub-Station of Kujama Colliery un
2026_BCCL_364401_1
BCCL/LA/EnM/F-19/26-27/044
Open Tender
Electrical and Maintenance Works
Percentage
10 days
Lodna Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,389
6 Oct 2026
28 Aug 2026
10 Sept 2026
28 Aug 2026
9 Sept 2026
29 Aug 2026
28 Aug 2026 - 2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Take Out of 11KV/440V Transformer from M.Pit Sub-Station Loading Transporting and Unloading at Nearby Colonies Sub-Station | - | LS | 7,000 | - |
| 2 | Shifting of 2 Nos 11 KV Switches 1 No.200 Amps SD 15 Switch | - | LS | 5,000 | - |
| 3 | Installation of Transformer manually at Near by Colonies Sub-Sation | - | LS | 5,000 | - |
| 4 | Supply and Making Outdoor Cable end termination with Heat Shrinkable Jointing Kit Complete with accessories including Lugs Aluminium Conductor Cable 185 Sq.mm | - | Nos | 8,485.25 | - |
| 5 | Laying of 185 Sq.mm Cable at new Site | - | Mtrs | 40 | - |
| 6 | 185 Sq.mm Cable end termination of 11 KV Switch to Transformer and 3.3 KV Switch with Proper Gland Bush and Lungs. | - | Nos | 3,020.25 | - |
| 7 | Earth Connection Transformer Neutral Body Switch Body Laying Cable Connection with Lugs | - | Mtrs | 109.79 | - |
| 8 | Miking of Chemical Earth Pit | - | Nos | 7,990 | - |
| 9 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.62 MB
BOQ_377308.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .